Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301
ML18009A370
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/01/1990
From: RICHEY R B
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-699 HO-900027-(O), NUDOCS 9002120336
Download: ML18009A370 (2)


Text

ACCELERATED DI'TION DEMONS>ION SYSTEM r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:9002120336 DOC.DATE: 90/02/01 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear power Plant, Unit 1, Carolina AUTH.NAME.AUTHOR AFFILIATXON RICHEY,R.B.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)

SUBJECT: Informs of completion of certain corrective actions to violations noted in Insp Rept 50-400/89-29 by 900301.DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SXZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vi lation sponse NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 RECIPXENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DEIIB

~DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRIS/DIR NRR/PMAS/ILRB12 REG F LE 02 G 2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPXENT ID CODE/NAME BECKER,D AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DREP/PRPBll NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL CHILL Carolina Power 8 Ught Company P.O.Box t65~New Hill, N.C.27662 R.B.RICHEY Manager Nants Nuclear Prelect FFB-$)99P Letter Number: HO-900027 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-699 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400 LICENSE NO~NPF-63 Gentlemen:

In reference to your December 8, 1989, Inspection Report,'0-400/89-28, Carolina Power and Light Company on January 3, 1990, responded to the Notice of Viol.ation identified in the report.At;>>,'he time of our response, it was expected that the planned corrective steps", to prevent further violat'.ions would be.completed by February 1, 1990." The purpose.of this letter is to inform youthat certain corrective actions, will not be completed until.March, 1, 1990.Specifically, 1)the establishment"of guidelines-

for overtime worked by personnel involved.in testing of'.safety-related equipment and 2)the development of a plant general order which will provide.specific controls and exclusions.-

concerning the use of instrument air for activities requiring connection to internally contaminated systems.This matter was discussed with ,the Harris NRC'enior;Resident,-Inspector,, Mr.Jeff Tedzow, on January 30,,'1990.

Thank you for your, consideration in'his matter.Very truly yours, R.B.Richey, Mana e'r'arris Nuclear Pr ject, MGW:dgr cc: Mr.R.A.Becker (NRC)Mr.S.D.Ebneter (NRC-RII), Mr.J.E.Tedrow (NRC.-SHNPP).900'120&t'o00201 FOR ADOCK Cl5000400 t.4 F'DC M EM/HO-9000270/