ML18022A772

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-63,revising Tech Spec Surveillance 4.0.2 to Permit Surveillances to Be Extended Up to 25% of Specified Interval & Removing 3.25 Limitation from Spec,Per Generic Ltr 89-14
ML18022A772
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/26/1990
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18022A773 List:
References
GL-89-14, NLS-90-040, NLS-90-40, NUDOCS 9003060152
Download: ML18022A772 (5)


Text

ACCELERATE) DISTjUBUTION DEMONSHWTION SYSTEM

. ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003060152 DOC.DATE: 90/02/26 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CUTTER,A.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards application for amend to License NPF-63,permitting TS Surveillance 4.0.2 intervals to be extended up to 254. h DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE- D J

TITLE: OR Submittal: General Distribution S NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 D BECKER,D 5 5

'D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSBll 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 1 0 OGC/HDS1 1 LE 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

D S

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL .

25

1l- ~

0 I'

1 fg tp E

j~

C~L Carolina Power & Light Company P.O. Box 1551 ~ Raleigh, N.C. 27602 FEB 2 6 3990 A. 8 CUTTER SERIAL: NLS-90-040 Vice President 10CFR50.90 Nuclear Services Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT SURVEILLANCE INTERVALS Gentlemen:

In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CPSL) hereby requests a revision to the Technical Specifications for the Shearon Harris Nuclear Power Plant, Unit 1.

Technical Specification Surveillance 4.0.2 permits surveillance intervals to be extended up to 25 percent of the specified interval. In addition, Specification 4.0.2 limits the combined time interval for any three consecutive surveillance intervals to less than 3.25 times the specified surveillance interval. This technical specification change request proposes to remove the 3.25 limitation from the specification in accordance wit:h the guidance provided by NRC in Generic Letter 89-14.

Enclosure 1 provides a detailed description of the proposed changes and the basis for the changes.

Enclosure 2 details the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration.

Enclosure 3 is an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9), therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment.

Enclosure 4 provides the proposed Technical Specification pages.

~2 900226 PDR ADOCK OSOOO4OO P

t

\ 'l EQ) 1 4~

lj

'1

'd

Document Control Desk NLS.-90-040 / Page 2 (919) 546-6623

'ours Please refer any questions regarding this submittal to very Mr. Steven Chaplin tr at A. B. Cutter ABC/SDC

Enclosures:

1. Basis for Change Request
2. 10CFR50.92 Evaluation
3. Environmental Evaluation
4. Technical Specification Pages cc: Mr. R. A. Becker Mr. J. E. Tedrow Mr. Dayne H. Brown Mr. S. D. Ebneter A. B. Cutter, having been first duly sworn, did depose and say that the, information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.

Notary (Seal)

My commission expires: / +/