ML20059L09112 September 1990Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees
ML18009A65811 September 1990Submits Addl Info Re Use of Hafnium Control Rods at Facility.All Rods Will Be Removed During Spring 1991 Outage
ML20059H4186 September 1990Responds to NRC Re Violations Noted in Insp Rept 50-400/90-13.Corrective Action:Changes to EST-717 in Area of Power Normalization Under Study for Past Several Months
ML17348B49430 August 1990Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-dutyFitness for Duty
ML20059D35130 August 1990Forwards Decommissioning Financial Assurance Certification Rept Submitted by North Carolina Eastern Municipal Power Agency
ML18009A62610 August 1990Informs That Action Committed to in Response to Generic Ltr 88-14, Instrument Air Supply Sys, Completed
ML18009A6243 August 1990Forwards Addl Info Re Operator Action Times Assumed in Steam Generator Tube Rupture Analyses for Plant,Per 900712 Telcon
ML18009A60831 July 1990Forwards Plan for Shearon Harris Nuclear Power Plant Emergency Exercise - 900919, Per NRC Request.W/O Encl
ML20055J41730 July 1990Forwards Rev 5 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20055F94312 July 1990Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices
ML18009A5996 July 1990Comments on Electrical Distribution Sys Functional Insp Rept 50-400/90-200 on 900212-0316.Seismic Qualification Package Subsequently Upgraded to Include Qualification Info Based on Receipt of Part 21 from Transamerica DelavalSafe Shutdown
Commercial Grade Dedication
Commercial Grade
Offsite Circuit
ML18009A58528 June 1990Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl
ML18009A56230 May 1990Responds to NRC 900504 Ltr Re Violations Noted in Insp Rept 50-400/90-06.Corrective Actions:Procedures OST-1008 & OST-1108 Revised to Delete Stroke Testing of Valve 1ST-359 on Quarterly Basis
ML18009A5143 May 1990Forwards Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C, Providing Results of Inservice Insps Performed During Plant Second Refueling Outage in Oct 1989
ML18009A49426 April 1990Forwards Radiological Environ Operating Rept,1989, Radiological Environ Operating Rept,Vol II,Jan-June 1989, Sample Analyses Data & Radiological Environ Operating Rept,Vol III,Jul-Dec 1989,Sample Analyses Data.
ML18009A50325 April 1990Submits Suppl 2 to Relief Request R2-001 Re Plant 10-yr Inservice Insp Plan,Per 880129 RequestHydrostatic
VT-2
ML18009A49124 April 1990Forwards Addl Info Re Proposed Wakesouth Regional Airport to Be Located Near Facility,Per 900411 Request.Info Previously Provided to NRC During 900320 & 23 TelconsTornado Missile
Fatality
ML18009A48424 April 1990Forwards Corrected Bases marked-up Page to 900226 Tech Spec Change Request Re Surveillance Intervals
ML18009A42530 March 1990Submits Supplemental Response to Station Blackout Rule Based on Guidelines Provided in NUMARC 87-00, Guidelines & Technical Bases for NUMARC Initiatives.... No Changes to Previous Calculations Necessary & One Deviation Noted
ML18009A42329 March 1990Suppls Response to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Actions:Surveys Performed to Determined Extent & Level of Contamination & Personnel Involved Decontaminated
ML18009A41123 March 1990Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-400/90-02.Corrective Actions:Personnel Involved W/ Quadrant Power Tilt Ratio Calculations & Operability Determination CounseledOperability Determination
ML18009A41223 March 1990Forwards Rev 17 to PLP-201, Emergency Plan & Fission Product Barrier Analysis.Rev to Emergency Plan Incorporates Comments Received During Recent Licensed Operator Requalification Training in Emergency Plan Procedures
ML18009A41522 March 1990Responds to NRC SALP Rept for Jul 1988 - Nov 1989.Contrary to Statement in Rept Significant Amount of Refresher Training Was Conducted During SALP Assessment Period Including Termination & Splicing & Motor & Bus RelaysSystematic Assessment of Licensee Performance
ML18009A40819 March 1990Responds to NRC 900226 Ltr Re Violations Noted in Insp Rept 50-400/90-01.Corrective Actions:All Calibr Required by Tech Specs for Power Range Nuclear Instrumentation Satisfactorily Completed
ML18022A7899 March 1990Forwards Vols 1 & 2 of Inservice Insp Summary 1st Interval 1st Period,2nd Refueling Outage Completed 891222.
ML18022A7886 March 1990Confirms Understanding of Status of NRC Activities Re Proposed Wakesouth Regional Airport Located Near Plant Site. Pending Issues Should Be Resolved by 900331 to Enable Util to Complete Negotiations W/Airport Authority
ML18022A7852 March 1990Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-400/89-34.Corrective Actions:Valve SI-332 Closed & Gravity Drain Path Isolated & Shift Foreman Required to Review MMM-012 Re Priority/Emergency Maint Work Control
ML18022A77226 February 1990Forwards Application for Amend to License NPF-63,revising Tech Spec Surveillance 4.0.2 to Permit Surveillances to Be Extended Up to 25% of Specified Interval & Removing 3.25 Limitation from Spec,Per Generic Ltr 89-14
ML20011F38226 February 1990Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices
ML18022A77014 February 1990Notifies of Issuance of Renewal of NPDES Permit for Plant. Permit EnclGrab sample
ML18009A3839 February 1990Responds to 900112 Ltr Re Violation Noted in Insp Rept 50-400/89-35.Corrective Actions:Valves ICS-775 & ICS-776 Added to Inservice Insp Program for Back Seat & Full Flow Testing & ICS-525 Revised to Satisfy Tech Spec RequirementsSafe Shutdown
Stroke time
ML18009A3751 February 1990Forwards Retyped Tech Spec Pages Re 890630 Application for Amend to License NPF-63 Concerning RCS Pressure Temp Limits
ML18009A3701 February 1990Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301
IR 05000400/19890281 February 1990Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301
ML18009A36326 January 1990Responds to NRC Bulletin 88-008, Thermal Stratification in Piping Connected to Rcs. Design Differences That Either Minimize Potential of Occurrence or Enhance Possibility of Detection Should Scenario Be Created at Plant Determined
ML18009A35325 January 1990Forwards Reactor Containment Bldg Integrated Leak Rate Test Conducted in Oct 1989.Util Believes That Packing Leaks Discovered Are Isolated Failures & That Repair Should Prevent RecurrencePacking leak
ML18009A35022 January 1990Forwards Revised Tech Spec Table 3.7-6, Area Temp Monitoring, Per 891218 Tech Spec Amend Request
ML18022A75917 January 1990Submits Results of Aircraft Hazards Study Associated W/ Proposed Wakesouth Regional Airport & FacilitySafe Shutdown
Tornado Missile
ML20005G57316 January 1990Forwards Response to Insp Rept 50-400/89-32.Encl Withheld (Ref 10CFR73.21)
ML18009A3355 January 1990Forwards Rev 16 to Vol 1,Part 2 of Plant Operating Manual PLP-201, Emergency Plan. Revised NUREG-0654 Comparison W/ Plant Emergency Action Level Flow Path Also Encl for Review
ML18009A31721 December 1989Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-21.Corrective Actions:Incident Reviewed by Both Plant & Nuclear Engineering Dept Personnel to Avoid Future MiscommunicationCommercial Grade
ML18009A31815 December 1989Forwards Retyped Amend Bar Pages to Tech Spec Table 3.3-3 Re Auxiliary Feedwater Manual Initiation,Per 891026 Application for Amend to License NPF-63
ML18009A30115 December 1989Forwards Proprietary WCAP-12403 & Nonproprietary WCAP-12404, LOFTTR2 Analysis for Steam Generator Tube Rupture W/Revised Operator Action Times for Shearon Harris Nuclear Power Plant. WCAP-12403 Withheld (Ref 10CFR2.790(b)(4))Affidavit
ML18022A73713 December 1989Forwards Change 3 to Rev 2 to State of Nc Emergency Response Plan in Support of Shearon Harris Nuclear Power Plant, Incorporating Administrative Enhancements. W/One Oversize EnclSiren
ML18009A2978 December 1989Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Action:Min of Four Decontamination Personnel Will Be Assigned 24 H Per Day During Fuel/Cask Handling to Maintain Cleanliness in Fuel Handling Bldg
ML18009A28430 November 1989Forwards Rev 0 to Core Operating Limits Rept in Support of Cycle 3 Operations
ML18005B15327 November 1989Forwards Retyped Amend Bar Pages to 890630 Request for Rev to License NPF-63 Re RCS pressure-temp Limits
ML18022A73127 November 1989Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements.Safe Shutdown
Earthquake
Control of Heavy Loads
Backfit
ML18005B15117 November 1989Forwards 15-day Special Rept Identifying Number of Steam Generator Tubes Plugged During Current Inservice Insp Period
ML18005B15013 November 1989Suppls 890403 Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Addl Nontraceable Molded Case Circuit Breakers (MCCB) & MCCBs Traceable to Refurbishers Noted During Records Review