ML18009A514

From kanterella
Jump to navigation Jump to search
Forwards Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C, Providing Results of Inservice Insps Performed During Plant Second Refueling Outage in Oct 1989
ML18009A514
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/03/1990
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18009A517 List:
References
HO-900088-(O), NUDOCS 9005090020
Download: ML18009A514 (3)


Text

ACCELERATED DISTRIBUTION DEMONSl. RATION SYSTEM 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005090020 DOC.DATE: 90/05/09 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION RICHEY,R.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C Oct 1989."

DISTRIBUTION CODE: A047D =

COPIES RECEIVED:LTR ENCL SIZE: +388 TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME s NOTES:Application for permit renewal filed. 05000400.

RECIPXENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 0 PD2-1 PD 5 5 D BECKER,D 1 1 D

INTERNAL: ACRS 0 AEOD/DSP/TPAB 1 1 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 9H 1 1 NUDOCS-ABSTRACT 1 1 1 0 OGC/HDS 1 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EG&G BROWN,B 1 1 EG&G RANSOME,C 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAFKl CONTACI'HE,DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 20079) TO ELIMINATEYOUR NAME PROM DISTRIBUTION LISYS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL tC

CPSL Carolina Power & Ught Company P. O. aox 165 ~ NrnN Hill, N. C. 27562 R. a. RICHEY Manager Harris Nuclear Project MAY 0 3 1990 Let ter Number '. HO-900088 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO ~ 50-400 LICENSE NO. NPF-63 SPECIAL REPORT STEAM GENERATOR TUBE IN-SERVICE INSPECTION RESULTS Gentlemen:

In accordance with Technical Specifications 4.4.5.5.b and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company hereby submits this Special Report. This Special Report provides the results of the steam generator tube in-service inspections performed during the Harris Plant's second refueling outage in October 1989.

Very truly yours, R. B. Richey, Manager Harris Nuclear Project MGW:dgr Enclosure cc: Mr. R. A. Becker (NRR)

Mr. S. D. Ebneter (NRC-RII)

Mr. J. E. Tedrow (NRC-SHNPP) j- r /Vl t 7 e'd Q i ST.

9005090020 900503 PDR ADOCK 05000400 Q PDC MEM/HO-9000880/1/Osl

j

. p, 1'1!

1 'I!) Q!  !

1

' 1 1

, ~

r

, ~ I