Text
ACCELERATED DI 'TION DEMONS
>ION SYSTEM r
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:9002120336 DOC.DATE: 90/02/01 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATXON RICHEY,R.B.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs of completion of certain corrective actions to violations noted in Insp Rept 50-400/89-29 by 900301.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SXZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Vi lation sponse NOTES:Application for permit renewal filed.
DOCKET 05000400 05000400 RECIPXENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DEIIB
~
DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DRIS/DIR NRR/PMAS/ILRB12 REG F LE 02 G 2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPXENT ID CODE/NAME BECKER,D AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DREP/PRPBll NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE IVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL
CHILL Carolina Power 8 Ught Company P. O. Box t65 ~ New Hill, N. C. 27662 R. B. RICHEY Manager Nants Nuclear Prelect FFB
)99P Letter Number:
HO-900027 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-699 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO ~ NPF-63 Gentlemen:
In reference to your December 8,
- 1989, Inspection Report,'0-400/89-28, Carolina Power and Light Company on January 3,
- 1990, responded to the Notice of Viol.ation identified in the report.
At;>>,
'he time of our
- response, it was expected that the planned corrective steps", to prevent further violat'.ions would be.completed by February 1,
1990.
" The purpose. of this letter is to inform you that certain corrective
- actions, will not be completed until.
March, 1, 1990.
Specifically,
- 1) the establishment "of guidelines-for overtime worked by personnel involved
. in testing of'.
safety-related equipment and 2) the development of a plant general order which will provide.
specific controls and exclusions.-
concerning the use of instrument air for activities requiring connection to internally contaminated systems.
This matter was discussed with
,the Harris NRC 'enior;
- Resident,
- Inspector,,
Mr. Jeff Tedzow, on January 30,,'1990.
Thank you for your, consideration in'his matter.
Very truly yours, R. B. Richey, Mana e'r'arris Nuclear Pr ject, MGW:dgr cc: