ML18009A626

From kanterella
Jump to navigation Jump to search
Informs That Action Committed to in Response to Generic Ltr 88-14, Instrument Air Supply Sys, Completed
ML18009A626
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/10/1990
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-14, NLS-90-160, NUDOCS 9008150278
Download: ML18009A626 (4)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM 0

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9008150278 DOC.DATE: 90/08/10 NOTARIZED: YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina'UTH.

NAME AUTHOR AFFILIATION CUTTER,A.B.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits supplemental response to 'Generic Ltr 88-14, "Instrument Air Supply Sys."

DISTRIBUTION CODE:

A048D COPIES RECEIVED:',LTR g ENCL ~

SIZE:

TITLE: OR/Licensing Submittal:

Equipment Qualification NOTES:Application for permit renewal filed.

DOCKET 05000400 8

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DET/ESGB 8D OGC/HDS1 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 6

1 1

1

'RECIPIENT XD CODE/NAME PD2-1 PD NRR/DET/EMEB 9H OCi M

EG FILE 01 NRC PDR COPIES LTTR ENCL D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

C)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL p/~

D D

T I) 4

Carolina,'Power

& Light Company P.O. Box 1551

~ Rateigh, N.C. 27602 08 10 90 A. B CUTTER Vice President Nuciear Services Department SERIAL:

NLS-90-160 10CFR50.54(f)

United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SUPPLEMENTAL RESPONSE TO GENERIC LETTER 88-14 INSTRUMENT AIR SUPPLY SYSTEM Gentlemen:

Carolina Power

& Light Company (CP&L) hereby provides notification that the action committed to in CP&L's response to Generic Letter 88-14 for the Shearon Harris Nuclear Power Plant, dated February 3, 1989 (NLS-89-022),

has been completed.

The CP&L response described the verification efforts that were performed to address the requirements of the Generic Letter. It also described one activity that remained to be completed, i.e., incorporation of a pressure drop test in post-maintenance test:ing following disassembly of the check valves in two inst:rument air supply lines.

The check valves service the accumulators for the containment vacuum relief valves.

The pressure drop test has been incorporated in an engineering performance test procedure which will be performed as part of the post-maintenance testing following disassembly of any of the check valves.

Therefore, the action committed to in response to Generic Letter 88-14 has been completed.

Please refer any questions regarding this submittal to Mr. Steven Chaplin at (919) 546-6623."

Yours very t ly, A.

B te ABC/SDC My commission expires:

/p /"93 9008i50278 900Si0 "t,PDR'DOCK 05000400 PDC lo A.

B Cutter, having been first duly sworn, did depose and say that the information cont:ained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power

& Light Company.

~ply tttt Nota (Seal)

=

4" BIOTA HJ'"":

~:., +BLlC tlttltltileli

tg I

tg A

II J

I p