Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8851999-10-0808 October 1999 Informs of Staff Determination That Listed Calculations Should Be Withheld from Public Disclosure,Per 10CFR2.790, as Requested in 990909 Affidavit ML20211J7731999-08-31031 August 1999 Forwards Insp Rept 50-312/99-03 on 990802-06.No Violations Noted.Insp Included Decommissioning & Dismantlement Activities,Verification of Compliance with Selected TS & Review of Completed SEs ML20211H7481999-08-13013 August 1999 Forwards Amend 126 to License DPR-54 & Safety Evaluation. Amend Changes Permanently Defueled Technical Specification (PDTS) D3/4.1, Spent Fuel Pool Level, to Replace Specific Reference to SFP Level Alarm Switches with Generic Ref 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20207E9181999-05-27027 May 1999 Informs That Effective 990328,NRR Underwent Reorganization. within Framework of Reorganization,Div of Licensing Project Mgt Created.Reorganization Chart Encl ML20206U7411999-05-18018 May 1999 Provides Summary of 990217-18 Visit to Rancho Seco Facility to Become Familar with Facility,Including Onsite ISFSI & Meeting with Representatives of Smud to Discuss Issues Re Revised Rancho Seco Ep,Submitted to NRC on 960429 ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204H6751999-03-19019 March 1999 Forwards Insp Rept 50-312/99-02 on 990309-11.No Violations Noted.Portions of Physical Security & Access Authorization Programs Were Inspected ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20207L1711999-03-10010 March 1999 Informs of Staff Determination That Supporting Calculations & Drawings Contained in Rev 2 of Sar, Should Be Withheld from Public Disclosure,Per 10CFR2.790 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20203D0761999-02-10010 February 1999 Ltr Contract:Task Order 37 Entitled, Technical Assistance in Review of New Safety Analysis Rept for Rancho Seco Spent Fuel Storage Facility, Under Contract NRC-02-95-003 ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A6031998-08-0707 August 1998 Forwards Insp Rept 50-312/98-03 on 980706-09.No Violations Noted ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236Q9461998-07-15015 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/98-02 ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20236E8211998-06-0303 June 1998 Forwards Insp Rept 50-312/98-02 on 980519-21 & NOV Re Failure to Review & Consider All Info Obtained During Background Investigation.Areas Examined During Insp Also Included Portions of Physical Security Program ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 IR 05000312/19980011998-03-25025 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-312/98-01 on 980205 ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20202C4641998-02-0505 February 1998 Forwards Insp Rept 50-312/98-01 on 980105-08 & Notice of Violation.Insp Included Decommissioning & Dismantlement Work Underway,Verification of Compliance W/Selected TS & Main & Surveillance Activities Associated W/Sfp ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20198K5391997-10-21021 October 1997 Forwards Insp Rept 50-312/97-04 on 970922-25 & Notice of Violation.Response Required & Will Be Used to Determine If Further Action Will Be Necessary ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20198G8141997-08-22022 August 1997 Forwards Amend 125 to License DPR-54 & Safety Evaluation. Amend Permits Smud to Change TS to Incorporate Revised 10CFR20.Amend Also Revises References from NRC Region V to NRC Region IV ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 ML20149E5031997-07-10010 July 1997 Second Partial Response to FOIA Request for Documents. Forwards Records Listed in App C Being Made Available in Pdr.Records in App D Already Available in PDR ML20148P5161997-06-30030 June 1997 Second Partial Response to FOIA Request for Documents.App B Records Being Made Available in PDR ML20141A1721997-06-17017 June 1997 Forwards Insp Rept 50-312/97-03 on 970603-05.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program 1999-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held ML20210H9541999-07-0707 July 1999 Informs NRC of Change to Rancho Seco Decommissioning Schedule,As Described in Licensee Post Shutdown Decommissioning Activities Rept ML20209D2501999-06-24024 June 1999 Informs That Util Has Revised All Sections of Rancho Seco Emergency Plan (Rsep),Change 4,effective 990624 ML20196G0431999-06-22022 June 1999 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Smud Rancho Seco Nuclear Generating Station ML20195B8511999-05-27027 May 1999 Forwards Change 4 to Rancho Seco Emergency Plan, Incorporating Commitments Made to NRC as Outlined in NRC .Emergency Plan Includes Two Listed Supporting Documents ML20195D1851999-05-27027 May 1999 Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments ML20206M1611999-05-10010 May 1999 Forwards Listed Proprietary Calculations to Support Review of Rancho Seco ISFSI Sar.Proprietary Encls Withheld ML20206E8591999-04-12012 April 1999 Provides Info Re High Total Coliform Result in Plant Domestic Sewage Effluent Prior to Confluence with Combined Effluent.Cause of High Total Coliform Result Was Broken Flow Rate Instrument.Instrument Was Repaired on 990318 ML20204E4031999-03-16016 March 1999 Submits Rept of Status of Decommissioning Funding for Rancho Seco,As Required by 10CFR50.75(f)(1).Plant Is Currently in Safstor, with Operating License Scheduled to Expire in Oct 2008 ML20204E6441999-03-11011 March 1999 Forwards Individual Monitoring Repts for Personnel That Required Radiation Exposure Monitoring During 1998 ML20204E6661999-03-11011 March 1999 Forwards Rancho Seco Exposure Rept for Individuals That Received Greater than 100 Mrem During 1998,IAW TS D6.9.2.2 & NRC Regulatory Guide 1.16 NL-99-002, Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3)1999-03-10010 March 1999 Submits Info About Property Insurance for Rancho Seco Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20207D4431999-03-0101 March 1999 Forwards Annual Radioactive Effluent Release Rept, for Rancho Seco Nuclear Generating Station for 1998 ML20207H6181999-02-18018 February 1999 Provides Attached Metrix & Two Copies of Rancho Seco ISFSI Sar,Rev 2 on Compact Disc,As Requested in 990209 Meeting. First Rounds of RAIs Dealt Primarily with Use of Cask as Storage Cask.Without Compact Disc ML20155D4431998-10-27027 October 1998 Forwards Amend 3 to Rancho Seco Dsar,Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode.With Instructions & List of Effective Pages NL-98-032, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1998-09-30030 September 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20237A9481998-08-0303 August 1998 Forwards Smud 1997 Annual Rept, IAW 10CFR50.71(b),which Includes Certified Financial Statements ML20236J6331998-06-30030 June 1998 Forwards Response to Violations Noted in Insp Rept 50-312/98-02.Corrective Actions:Util Revised RSAP-1003 to Clarify District Security Staff Responsibilities Re Handling & Review of Criminal History Info ML20217G8391998-04-20020 April 1998 Forwards Copy of Rancho Seco Monthly Discharger Self-Monitoring Rept for Mar 1998 ML20217H0451998-03-18018 March 1998 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1997,per TS D6.9.2.2 & Guidance Contained in Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1997 ML20217F1891998-03-18018 March 1998 Forwards Signed Original & Amend 7 to Rancho Seco Long Term Defueled Condition Physical Security Plan & Rev 4 to Long Term Defueled Condition Training & Qualification Plan.Encls Withheld,Per 10CFR2.790 ML20217G6661998-03-18018 March 1998 Forwards Discharge Self Monitoring Rept for Feb 1998, Which Makes Note of One Wastewater Discharge Permit Violation ML20216K1091998-03-11011 March 1998 Forwards NRC Form 5 Individual Monitoring Repts for Personnel Who Required Radiation Exposure Monitoring,Per 10CFR20.1502 During 1997.W/o Encl ML20217N9531998-03-0505 March 1998 Responds to Violations Noted in Insp Rept 50-312/98-01. Corrective Actions:Radiation Protection Group Wrote Potential Deviation from Quality (Pdq) 97-0082 & Assigned Radiation Protection Action to Determine Cause & CAs ML20203H7001998-02-25025 February 1998 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997, IAW 10CFR50.36a(a)(2) & TS D6.9.3.Revs to Radiological Environ Monitoring Manual & off-site Dose Calculation Manual,Encl NL-98-006, Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3)1998-02-12012 February 1998 Submits Annual Rept of Property Insurance Levels for Rsngs, IAW 10CFR50.54(w)(3) ML20202G0131998-02-12012 February 1998 Forwards Certified Copies of Listed Nuclear Liability Endorsements & Master Worker Policy Certificate of Insurace for Facility ML20199A5881997-11-10010 November 1997 Responds to NRC Re Violations Noted in Insp Rept 50-312/97-01.Corrective Actions:Reviewed SFP Water Temp & Instrument Calibr Records,Generated Otr 97-001 to Document out-of-tolerance Instrument & Generated Pdq 97-0064 ML20198R9501997-11-0505 November 1997 Requests Interpretation of or Rev to NUREG-1536, Std Review Plan for Dry Cask Storage Sys, Re Compliance W/ 10CFR72.236(e) & 10CFR72.122(h)(4) for Dry Fuel Storage Casks ML20217D3101997-09-25025 September 1997 Forwards Update of 1995 Decommissioning Evaluation, for Rancho Seco Nuclear Generation Station & Annual Review of Nuclear Decommissioning Trust Fund for Adequacy Re Assumptions for Inflation & Rate of Return ML20211F0991997-09-23023 September 1997 Forwards One Certified Copy of Mutual Atomic Energy Liability Underwriters Nuclear Energy Liability Insurance Endorsement 120 for Policy MF-0075 for Smud Rancho Seco Nuclear Facility ML20151L0281997-07-29029 July 1997 Provides Response to NRC Request for Addl Info Re TS Change,Relocating Administrative Controls Related to QA to Ufsar,Per NUREG-0737 NL-97-030, Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs1997-05-13013 May 1997 Forwards Endorsement 132 to Nelia Policy NF-0212 & Endorsement 118 to Maelu Policy MF-0075 for Smuds Rsngs ML20138F5321997-04-28028 April 1997 Forwards Response to RAI Re License Amend 192,updating Cask Drop Design Basis Analysis,Per NRC 960510 Request for Addl Info on 960318 Application NL-97-027, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-04-17017 April 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility ML20137W8091997-03-20020 March 1997 Forwards Biennial Update to Rancho Seco Post-Shutdown Decommissioning Activities Rept ML20137S3571997-03-19019 March 1997 Provides Notification of Use of Revised Quality Manual for Activities Re Rancho Seco ISFSI ML20137D0981997-03-18018 March 1997 Submits Rancho Seco Exposure Rept for Individuals Receiving Greater than 100 Mrem During 1996.Provided IAW TS D6.9.2.2 & Guidance Contained in NRC Reg Guide 1.16.No One Exposed to Greater than 100 Mrem in 1996 ML20137D1221997-03-18018 March 1997 Submits,Iaw 10CFR20.2206 & TS D6.9.2.1,1996 NRC Form 5 Individual Monitoring Repts for Personnel Requiring Radiation Exposure Monitoring Per 10CFR20.1502 During 1996. W/O Encl NL-97-012, Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3)1997-02-11011 February 1997 Submits Rept of Listed Current Levels of Property Insurance for Plant,Iaw 10CFR50.54(w)(3) ML20138L1091997-01-29029 January 1997 Informs of Schedule Change Re Decommissioning of Rancho Seco.Incremental Decommissioning Action Plan,Encl NL-97-005, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility1997-01-22022 January 1997 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Utility NL-96-056, Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util1996-12-16016 December 1996 Forwards Certified Copies of Listed Nuclear Liability Endorsements for Util ML20134E0041996-10-23023 October 1996 Forwards Response to NRC GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks ML18102B6871996-08-0606 August 1996 Informs That Util Will Revise Loading & Unloading Procedures & Operator Training as Necessary ML20149E4491994-05-16016 May 1994 Forwards 1993 Annual Rept of Sacramento Municipal Utility District,For Info ML20149E3971994-05-10010 May 1994 Forwards Re Updated Decommissioning Cost Estimate for Rancho Seco & Attached Rept by Tlg Engineering,Inc. W/Svc List ML20059H6731994-01-20020 January 1994 Forwards Revised Rancho Seco Quality Manual, Reflecting Current Rancho Seco Pol Phase Nuclear Organization Changes ML20059E1221994-01-0303 January 1994 Forwards Amend 7 to Long Term Defueled Condition Physical Security Plan.Encl Withheld (Ref 10CFR73) ML20059C1681993-12-22022 December 1993 Forwards Suppl Info to Support Review & Approval of 930514 Proposed License Amend 186 Re Nuclear Organization Changes, Per NRC Request 1999-07-07
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5431990-09-20020 September 1990 Requests Exemptions from Certain Requirements of 10CFR50.47(b) & 50,App E & Proposes New Emergency Plan That Specifically Applies to Long Term Defueled Condition ML20059J9161990-09-13013 September 1990 Notification of Change in Operator/Senior Operator Status for R Groehler,Effective 900907 ML20059J9221990-09-13013 September 1990 Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, 'Vendor Interface for Safety-Related Components.' No Vendor Interface Exists for Spent Fuel Pool Liner NL-90-442, Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-2121990-09-12012 September 1990 Forwards Endorsements 13 to Nelia Certificate N-49 & Maelu Certificate M-49,Endorsements 91 & 92 to Maelu Policy MF-75 & Endorsements 103 & 104 to Nelia Policy NF-212 ML20059G0791990-09-0606 September 1990 Forwards Supplemental Fitness for Duty Performance Data, Omitted from 900725 Rept Re Random Drug Testing Results ML20059E0031990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept,Jan- June 1990, Corrected Repts & Revs to ODCM ML20059C2491990-08-27027 August 1990 Advises That M Foster & B Rausch Leaving Util Effective on 900810 & 17,respectively & Will No Longer Require Active Operator Licenses ML20056B2591990-08-20020 August 1990 Forwards Long-Term Defueled Condition Security Training & Qualification Plan. Encl Withheld (Ref 10CFR2.790) ML20056B2961990-08-10010 August 1990 Discusses 900731 Meeting Re Future of Util & Closure & Decommissioning of Facility.Request for Possession Only License Pending Before Commission ML20058Q2811990-08-0909 August 1990 Forwards Updated Listing of Commitments & long-range Scope List Items Deferred or Closed by Commitment Mgt Review Group Since Last Update ML20058N0911990-08-0707 August 1990 Notifies of Minor Change in List of Tech Specs Applicable in Plant Defueled Condition.Determined That Surveillance Requirements Table 4.1-1,Item 63 Not Required to Be Included in List of Tech Specs Applicable in Defueled Condition ML20056A1131990-07-30030 July 1990 Apprises of Status of Plans to Use 3 of 4 Emergency Diesel Generators as Peaking Power Supplies & Responds to Questions in .Util Obtained Authorization for Operation of Diesel Generators for No More than 90 Days Per Yr ML20056A2041990-07-30030 July 1990 Provides Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. Pressure & Differential Pressure Transmitters 1153 & 1154 Do Not Perform Any safety-related Function in Current Plant Mode ML20055J0311990-07-25025 July 1990 Forwards fitness-for-duty Performance Data for Facility from 900103-0630 ML20055J0331990-07-25025 July 1990 Notifies of Change in Operator/Senior Operator Status. Operators Terminating Employment & No Longer Require License ML20055H8081990-07-24024 July 1990 Forwards Decommissioning Financial Plan for Plant,Per 10CFR50.33(k)(2) & Requests Interim Exemption Re Requirement to Have Full Decommissioning Funding at Time of Termination of Operation,Per 10CFR50.12 ML20055H7561990-07-24024 July 1990 Requests Exemption from Performing Annual Exercise of Emergency Plan,Activation of Alert & Notification Sys & Distribution of Public Info Brochures,Per 10CFR50.12 Requirements ML20055F8421990-07-13013 July 1990 Forwards Application for Proposed Decommissioning of Plant. Util Needs Relief from Equipment Maint,Surveillance,Staffing & Other Requirements Not Necessary to Protect Public Health & Safety During Defueled Condition ML20055G9821990-07-12012 July 1990 Advises That Environ Exposure Controls Action Plan Will Be Provided by Sept 1990,per Insp Rept 50-312/90-02 ML20055E5111990-07-0606 July 1990 Notifies of Change in Operator/Senior Operator Status for D Rosenbaum & M Cooper,Effective 900622 & 29,respectively ML20055C3541990-02-14014 February 1990 Forwards Updated Response to Insp Rept 50-312/88-30. Calculations for Liquid Effluent Monitors Completed & in Use & Rev to Reg Guide 4.15 in Procedure RSAP-1702 Scheduled to Be Completed & Implemented by Apr 1990 ML20055C3511990-02-14014 February 1990 Forwards Addl Info Re 900306 Response to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Util Will Replace Only Relays Found Not to Meet Insp Criteria ML20248H2571989-10-0606 October 1989 Responds to NRC Re Addendum to Safety Evaluation Supporting Amend 92 to License DPR-54 Re Reactor Vessel Vent Valve Testing.No Testing of Reactor Vessel Vent Valves Will Be Performed ML20248H2391989-10-0606 October 1989 Requests Exemption from Requirements of 10CFR26 Re Fitness for Duty Programs Based on Present & Future Operational Configuration ML20248A8271989-09-25025 September 1989 Requests Permission to Submit Next Amend to Updated FSAR W/Decommissioning Plan Submittal.Extension Will Allow District to Incorporate Plant Closure Status in SAR Update to Reflect Plant Conditions Accurately ML20248D4611989-09-13013 September 1989 Responds to 890906 Request for Assessment of Util Compliance W/Ol & Associated Programs & Commitments,Per 10CFR50.54(f). Staffing Requirements for Emergency Preparedness Will Not Be Violated & Future Shortfalls Will Be Remedied ML20247G1991989-09-11011 September 1989 Requests Extension for Time Period Equivalent to That of Current Shutdown.Extension Would Result in Revised Final Expiration Date of Not Earlier than 900318.Plant Would Not Be Brought Above Cold Shutdown W/O NRC Prior Concurrence ML20247H3551989-09-0707 September 1989 Informs That Util Stands by Commitments of 890621 & 0829 Re Implementation of Closure Plan in Safe & Deliberate Manner in Compliance W/License & W/All Applicable Laws & Regulations ML20247H5541989-09-0101 September 1989 Responds to Violations Noted in Insp Rept 50-312/89-14. Corrective Actions:Stop Order on Fuel Movement Issued & Action Plan Generated on 890908 to Address Broader Issues 05000312/LER-1988-010, Forwards Rev 1 to LER 88-010,due to Change in Commitment Date for re-evaluating Fire Zones.Date Changed to 901001. Zones re-evaluated in Conjunction W/Mods to Fire Detection Annunciator Sys1989-08-23023 August 1989 Forwards Rev 1 to LER 88-010,due to Change in Commitment Date for re-evaluating Fire Zones.Date Changed to 901001. Zones re-evaluated in Conjunction W/Mods to Fire Detection Annunciator Sys ML20246A4011989-08-16016 August 1989 Forwards Rev 5 to Inservice Testing Program Plan. Changes Identified Consistent W/Guidance Provided by Generic Ltr 89-04 NL-89-593, Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request1989-08-15015 August 1989 Forwards Plant Closure Organizational Charts & Administrative Procedure RSAP-0101,per 890802 Request ML20245H4781989-08-10010 August 1989 Requests Exemption from Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs Because on 890607,util Board of Directors Ordered That Plant Cease Operation ML20245H1781989-08-0909 August 1989 Notifies of Change in Operator/Senior Operator Status. J Dailey & J Reynolds Terminated Employment on 890721 & 890802,respectively ML20245L1831989-08-0808 August 1989 Informs That Official Correspondence Must Be Directed to Listed Individuals Due to Reorganization of Util Following 890606 Election ML20247L9221989-07-26026 July 1989 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-312/88-33.Corrective Action:Portable Shield Walls Inspected Every 6 Months to Ensure All Safety Factors Met & Area Surveys Conducted on Weekly Basis ML20247M4121989-07-24024 July 1989 Requests Exemption from 10CFR50,App E,Section IV.F.2 to Allow Util Not to Perform Annual Emergency Plan Exercise for 1989.Request Results from Transitional Mode of Plant from Operating Plant to Plant Preparing for Decommissioning NL-89-541, Requests That Completion Date for Addl Training of Personnel Involved in Performing Work on Environ Qualified Equipment Be Extended from 890616 to 8912151989-07-14014 July 1989 Requests That Completion Date for Addl Training of Personnel Involved in Performing Work on Environ Qualified Equipment Be Extended from 890616 to 891215 ML20246P4011989-07-14014 July 1989 Informs That Evaluation of Contracts & Agreements Identified No Restrictions on Employee Ability to Provide Info About Potential Safety Issues to NRC NL-89-547, Forwards Amend 110 to License DPR-54,issued on 890609, Identifying Discrepancy in Tech Spec Page X (Table of Contents) Which Does Not Reflect Changes Approved in Amend 1061989-07-0606 July 1989 Forwards Amend 110 to License DPR-54,issued on 890609, Identifying Discrepancy in Tech Spec Page X (Table of Contents) Which Does Not Reflect Changes Approved in Amend 106 ML20246A9751989-06-30030 June 1989 Advises That Concerns Addressed in Generic Ltr 89-08 Inapplicable,Since Util Intends to Defuel Reactor.Generic Ltr Will Be Reviewed Prior to Placing Facility in heatup-cooldown Operational Mode for Return to Power ML20246A5171989-06-30030 June 1989 Forwards Rancho Seco Closure Plan, Per 890621 Request for Addl Info Re Plan CEO-89-289, Notifies of Change in Operator/Senior Operator Status.Listed Operator/Senior Operator Terminated Employment on Listed Effective Date1989-06-27027 June 1989 Notifies of Change in Operator/Senior Operator Status.Listed Operator/Senior Operator Terminated Employment on Listed Effective Date NL-89-526, Lists Discrepancies Noted in Amend 109 to License DPR-54,per 890615 Discussion W/S Reynolds.Tech Specs Encl1989-06-22022 June 1989 Lists Discrepancies Noted in Amend 109 to License DPR-54,per 890615 Discussion W/S Reynolds.Tech Specs Encl ML20245H4181989-06-21021 June 1989 Discusses Util Plans Re Overall Closure of Plant,Per 890615 Meeting W/Nrc.Util Will Request Appropriate Changes to Tech Specs to Reflect Defueled Mode & Will Evaluate & Request Changes to Emergency Plan ML20245D9281989-06-21021 June 1989 Discusses Activities Underway Re Plan for Closure of Plant Discussed During 890615 Meeting W/Region V.Util Intends to Continue Use of Essential Programs,Such as Preventive Maint Program,For Sys within Scope of Closure Process ML20245A0981989-06-16016 June 1989 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. No Westinghouse Plugs Used at Plant ML20248B5751989-06-0202 June 1989 Advises That Util Anticipates That Final Analysis of Thermal Striping Will Conservatively Support Surge Line Lifetime Significantly Longer than June 1994 Date,Per NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification NL-89-468, Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request1989-05-30030 May 1989 Submits Justification for Absence of Functional Testing Requirement in Proposed Tech Spec 4.14(f) Re Snubber Svc Life Monitoring,Per 890517 Request ML20247N2601989-05-25025 May 1989 Requests Guidance Re Whether NRC Concurs W/Arbitrator Order Concerning Employee Access to Plant 1990-09-06
[Table view] |
Text
, ~ e, m i:{CWv5y
[%J YSMUD
- f SACRAMENTO MUNICIPAL UTILITY DISTRICT Cl 6201 S Street, P.O. Box 15830. SacrernantogA 95813; (916) 452 3211 AN ELECTRIC SYSTEM SERVING E HEARJ Ofl,C$1F NIA
%Cla:;y;;;
JEW 86-023 May 16,1986 J B MARTIN ADMINISTRATOR U S NUCLEAR REGULATORY COMMISSION REGION V 0FFICE OF-INSPECTION AND ENFORCEMENT 1450 MARIA LANE SUITE 210 WALNUT CREEK CA 94596 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT NO 1 RESPONSE TO IE BULLETIN NO. 85-03; MOTOR OPERATED VALVE COMMON MODE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS IE Bulletin 85-03 requires nuclear power plants with operating licenses to develop and implement a program to ensure that valve operator switches of motor operated valves (MOV's) in the'high pressure coolant injection / core spray and 9mergency feedwater systems are selected, set, and maintained.
properly. The-attached reprt details the District's program to address IE Bulletin 85-03 action items. Also, the District is expanding certain elements of this program to cover other -important plant MOV's.
The District has completed Action Item a of IE Bulletin 85-03 (review and documentation of the design basis for the operation of each identified
~
valve) and presents this information in'the attached report. The report
- also outlines the program to address IE Bulletin 85-03 Action Items b
- - through d and completion of~the written report as required by Action Item f. The schedule for completing these items is also included in the attached report. In addition, the District will incorporate the items of IE Notice 86-29, " Effects of Changing Valve Motor-0perator Switch Settings."
i 8605280023 860516 <
PDR ADOCK 05000312 G PDR- L.
I I L
L 3^ O
T e J
I J. B. Martin May 16,1986 If you have any questions, pleite call Jerry Delezenski of my staff at (209) 333-2935, extension 4909.
_J ~Ef WARD Y/
ASSISTANT GENERAL MANAGER, NUCLEAR Sworn to and subscribed before me this day of May, 1986 g2'd
'?s PATRICIA K. GEISLER
) TS;q many rueue.-caurons:4
- kg< ratscir.u. orrece is SAChA51 ENTO COUNTY -
l My convnission bpires February 16,1984
+ u - o n - ... . ,
Attachment
ATTACHMENT T0 JEW LETTER 86-023 Dated May'16, 1986 I. E. BULLETIN NO. 85-03 MOTOR OPERATED VALVE COMMON MODE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS Program for Compliance to IEB 85-03 i
i a
i i
i
i '
TABLE OF CONTENTS
- 1. INTRODUCTION 1 II. DISCUSSION 1 III. PROGRAN DESCRIPTION 2
- 1. Valve data collection and establishing current conditions 4
- 2. Operator refurbishment 5
- 3. Analytical determination of torque and thrust 5
- 4. Setting of switches using the analytical values 6
- 5. Testing to confirm the valve will perform when required to mitigate an accident 6
- 6. Revision of procedures to ensure the switches are correctly set, maintained and altered as required in a controlled manner 7 IV. SCHEDULE 8 TABLE 1 9 e
_j_
8
- 1. INTRODUCTION IE Bulletin 85-03 requires that a written report be submitted to the NRC within 180 days of bulletin issuance. This report documents the design basis operating conditions for motor operated valves in the High Pressure Injection (HPI) and Auxiliary Feedwater ( AFW) Systems which are required to function in order to mitigate any Design Basis Accident.
This submittal defines a program and schedule for checking, documenting, verifying, and maintaining proper switch settings for the active motor operated valves identified in these two systems.
II. DISCUSSION A study (ERPT-E0181) has been conducted on each of the Rancho Seco Updated Safety Analysis Report (USAR) Chapter 14 accidents to identify the motor operated valves which are required to function in order to mitigate each event. The high pressure injection and auxiliary feedwater valves required for accident mitigation are listed on the attached Table 1. Also, listed on Table 1 is the maximum credible differential pressure imposed upon each valve.
The maximum dif ferential pressure on each valve was determined by evaluating the systems (HPI, AFW) parameters of each valve. In addition to evaluating the Chapter 14 accidents, the Normal and Emergency Operating Procedures were reviewed to ensure the most severe differential pressure conditions were identified.
1 The method af evaluation of each event was to establish the initial conditions of each component prior to the event. The changes to the
, system parameters due to the event were then evaluated for changes (position and parameter) on the valves of interest. Numerous motor operated valves in the high pressure injection and auxiliary feedwater system are commanded to a specific position by automatic protection systems. These automatic position changes plus other manual operator commanded (even spurious) position changes were evaluated to determine which condition produced the maximum differential pressure upon each valve for each valve function (open or closed).
The valves listed in Table 1 are those motor operated valves in the HPI and AFW Systems which are required to be positioned or repositioned to provide the system desiga function (i.e. supply fluid) during each evaluated operating circumstance and each accident of Chapter 14 of the Rancho Seco Unit 1 USAR.
III. PROGRAM DESC.'IPTION IE Bulletin 85-03 describes a phased program. The first phase is to determine the dif ferer tial pressure conditions for each motor operated valve and to establish a second phase program. The phase 2 portion of IE Bulletin 85-03 will involve the following steps:
- 1) Valve data collection and establishing current conditions.
- 2) Operator refurbishment.
- 3) Analytical determination of the operator thrust and torque.
- 4) Setting of the switches using the analytical values.
- 5) Testing to confirm the valve will perform when required to mitigate an accident.
- 6) Revision of procedures to ensure the switches are correctly set, maintained, and altered as required in a controlled manner.
Prior to initiating the above activities, a training program will be conducted for Maintenance (Electrical and Mechnical), Quality, and Engineering and Operations personnel who will be directly involved in the motor operator work. Thii training program will provide a
. familiarization with motor operators in general.
Specific attention will be given to how the torque and limit switches function, the switch setting methodology, and what occurs when a i switch trips. The training program will provide an opportunity for the maintenance personnel to get hands-on experience prior to going into the program. The training program will also cover the use of analysis and test equipment to determine final switch settings and l
l operator thrust.
l The Valve Actuator Training program provides maintenance personnel with the necessary hands-on practice to troubleshoot and repair the problems.
l Hands-on training includes supervised assembly and disassembly of motor operator, practice for diagnosing limit and torque switch settings, trouble shooting, and repairs.
- 1) Valve Data Collection and Establishina Current Conditions The current switch settings will be obtained by removing the limit switch compartment cover on each motor operator and recording the limit switch positions by manually moving the valve using the handwheel. The torque switch setting and the torque load on the handwheel will be recorded. The Name Plate data, valve stem thread pitch, lif t, operator and valve type and size, and valve pressure rating will be recorded. Using the data obtained and using the analytical method to determine stem load, the hand wheel torque will be converted into a stem load. This will constitute the current condition for the operator. Using the data collected and the operating conditions determined in Phase 1, the analytical load required to be placed on the stem for the most adverse operating condition will be determined and documented. The analytical methodology will be documented in calculations using SMUD Nuclear Engineering procedures and will be used to determine and revise the switch settings. The switch settings will be documented on controlled Engineering drawings and will form part of the configuration control for the Rancho Seco Nuclear Power Plant. The analytical "most adverse" load will be compared to the current condition and compared against the allowable conditions for the valve, against the allowable thrust and torque for the operator, and against the allowable motor usage torque to determine if the operator is properly sized.
, 4 T
, 2) Operator Refurbishment i
In order to ensure the motor operator is. in proper working condition, i the motor operators'will be refurbished. Each motEr operator will be partially disassembled and inspected to determine the extent of disassembly and repair required. Once the operators have been inspected, each motor operator will be refurbished as identified by the inspection. This will ensure the operator is in an acceptable condition mechanically. This work will be conducted in accordance with the manufacturer's requirements using procedures with appropriate i
quality inspection points.
L l 3) Analytical Determination of Toraue and Thrust i
The maximum allowable load on the valves will be determined by an 4
analytical method using thrust and torque values obtained through the valve vendors. Valve manufacturers and motor operator vendors will be requested to furnish the loads for the listed conditions and the maximum loads for the valves.
The methodology and data base will be obtained through site records, standard operator sizing procedures available from the operator manufacturers, and from direct infonnation received from the valve manufacturers. The use of this analytical methodology will establish a load and a corresponding handwheel torque required to achieve the load. The limit switch settings will be established as a standard j percent open for the open torque switch bypass setting. This position j
will be standardized for all valves to eliminate confusion in setting the switches.
E e-
- 4) Setting of the Switches Using the Analytical Values f
Following operator refurbishment (2 above), the torque and limit switch settings will be made on the operators. The torque switch settings will be input through the actuator handwheel and set to a-specific value of handwheel torque. The open torque bypass switch setting will be a fixed percentage of disc motion for all motor operated valves. The open limit switch settings will be adjusted to ensure the valves are not back seated. The three-way valves will be set to torque out.in both the open and closed directions. The x handwheel torque values and corresponding torque switch settings will be recorded along with the limit switch positions.
- 5) Testing to Confirm the Valve Will Perform When Required to Mitiaate an
. A_gcident Once the operators have been refurbished and the new switch settings fixed, the motor operated valves will receive a-flow and delta p test as close to the limiting operating conditions identified as is
, practical. Those' valves that'_do not receive a full: flow and delta p' test will have an analytical justification provided to. compare the
~
analytical load versus the test load to . identify the margin available. The test program will record as appropriate, valve stroke time, confirmation of switch operation, inlet and outlet pressures, flow, and system alignment. Adequate system, equipment, and personnel-safety precautions will be maintained during the tests to prevent injury or equipment damage.
i + -
- 6) Revision of Procedures to Ensure the Switches Are Correctly Set.
Maintained. and Altered as Required in a Controlled Manner The District will prepare / revise Nuclear Engineering Precedures to ensure that correct switch settings are determined and maintained throughout the-life of the plant. The switch settings will be documented on controlled engineering drawings and will form part of' the configuration control for the Rancho Seco Nuclear Power Plant.
Applicable industry standards will be considered in the preparation of these procedures. The valves will be periodically tested to ensure the proper load is being applied by the valve motor operator. The bypass ~ limit switch setting and open limit switch setting will also be verified by test. The torque / load numerical settings will be verified on a schedule consistent with valve usage.
IV. SCHEDULE The following is the schedule for completion of our program for compliance with IE Bulletin 85-03.
Scheduled Comoletion Date
- 1) Determination of the differential Complete pressures for the MOV'S covered in the IE8 85-03 program
- 2) Submittal of program and schedulefto Complete the NRC
- 3) Training of Personnel:
a) Maintenance Complete b) Quality Complete c) Operations 9/5/86
- 4) Preparation / Revision of Procedures 8/29/86
- 5) Valve data collection 8/4/86
- 6) Analytical determination of torque 8/18/86 and thrust
- 7) Setting of switches 8/29/86
- 8) Operator refurbishment (All of 11/2/87 these MOV'S except SFV-30801 and
~
HV-23004 are included in the upgraded maintenance program required for EQ)-
- 9) Testing 11/13/87 10)-Submittal of Final Report to the..NRC 1/15/88 or within 60 ,'
days of-program . . -
completion ,
1001E
.. ' TABLE 1, LIST OF MOV'S AND THEIR DIFFERENTIAL PRESSURES INCLUDED IN IEB 85-03 System Valve Number Function P P Opening Closine AFW SFV -'20577 AFW Bypass 1340 1340 20578 HV - 31826 AFW Cross Connect 1340 1340 31827 SFV - 30801 AFW Pump Turbine 1100 Isolation HV - 20569 Main Steam to AFW 1100 1100 20596 Turbine HPI SFV - 23809, 10, HPI Isolation Valves 2960 2765 i 11, 12 SFV - 22005, 06, Letdown Isol. Valves 2150 2105 23, 25 HV - 22007, 22008 SFV - 24004 RCP Seal Return 2150 2150 SFV - 23645, 23646 MU Pump Recirc. 2400 2960 SFV - 23604 Makeup Isolation 2960 2960 SFV - 23508 MU Tank Isolation 20 20 SFV - 25003, 25004 BWST Isolation 20 20 SFV - 23616- RCP Seal Injection 2960 HV - 26105, 26106 R.B. Sump Isolation 20 HV - 26007, 26008 LPI - HPI X-Connect 190 HV - 23004 'Three-way Valve 143 1001E