Pages that link to "PNO-I-89-028, on 890411,shutdown Initiated from Full Power When RCS Unidentified Leak Rate Reached 1.5 Gpm.Charging Flow Control Valves Closed to Limit Amount of Boron Injected.Caused by Crack on Leakage Monitoring Valve"
Jump to navigation
Jump to search
The following pages link to PNO-I-89-028, on 890411,shutdown Initiated from Full Power When RCS Unidentified Leak Rate Reached 1.5 Gpm.Charging Flow Control Valves Closed to Limit Amount of Boron Injected.Caused by Crack on Leakage Monitoring Valve:
Displayed 50 items.
- ML20249B142 (← links)
- ML20249B109 (← links)
- ML20249B090 (← links)
- ML20249B009 (← links)
- ML20249A952 (← links)
- ML20249A880 (← links)
- ML20249A872 (← links)
- ML20249A815 (← links)
- ML20249A777 (← links)
- ML20249A747 (← links)
- ML20249A589 (← links)
- ML20249A556 (← links)
- ML20248L106 (← links)
- ML20248K941 (← links)
- ML20248F179 (← links)
- PNO-I-89-080, on 890922,NRC Presented Preliminary Results of Requalification Exams Indicating Failure of Two Crews. Licensee Preparing Justification for Continued Operation for Region I Mgt Review (← links)
- PNO-I-89-039, on 890527,unidentified RCS Leakage Exceeded 2.5 Gpm & Plant Shutdown Initiated.Rcs Pressure Increased to 46 Gpm.Containment Entry Planned on 890530,after Deinerting. Maint Team Insp Initiated (← links)
- PNO-I-89-063, on 890721,NRC Team Insp of Allegations Re Facility Completed.Insp Dealt W/Approx 120 Concerns from Three Allegers.Preliminary Results Indicate 44 Allegations Unsubstantiated & 19 Not within Charter of Insp Team (← links)
- PNO-I-89-076, on 890906,contaminated Equipment Located in Unrestricted Areas.Equipment Included Hydrolaze Unit & Tools.Licensee Initiated Survey as Result of Ongoing Internal Assessment (← links)
- ML20236X090 (← links)
- ML20236X022 (← links)
- ML20236V344 (← links)
- ML20236V145 (← links)
- ML20236V107 (← links)
- ML20236U930 (← links)
- ML20236U910 (← links)
- ML20236U888 (← links)
- ML20236U869 (← links)
- ML20236U646 (← links)
- ML20236U511 (← links)
- ML20236U496 (← links)
- ML20236U315 (← links)
- ML20236U143 (← links)
- ML20236U009 (← links)
- ML20236T971 (← links)
- ML20236J752 (← links)
- PNO-I-98-026, on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release (← links)
- ML20236F192 (← links)
- ML20236F137 (← links)
- ML20236F121 (← links)
- ML20236F065 (← links)
- ML20236F019 (← links)
- ML20217A062 (← links)
- ML20216J947 (← links)
- PNO-I-87-052, on 870605,reactor Trip Occurred Due to Closure of All Four Msivs.Caused by Loss of One of Two Safeguards Electrical Buses.On 870606,MSIV a Failed Part Stroke Testing.Reactor in Cold Shutdown for MSIV Repair (← links)
- PNO-I-86-095, on 861130,unit Scrammed from 100% Power Due to Malfunction of Main Transformer,Loss of Generator Load & Turbine Overspeed.Transformer Disassembly in Progress to Determine Cause of Event (← links)
- ML20211F840 (← links)
- PNO-I-87-037, on 870425,util Employee Arrested Offsite for Possession of Coccaine W/Intent to Sell.Employee Authorization to Enter Vital Areas Terminated 1 H After Arrest (← links)
- PNO-I-85-071A, on 850927,Hurricane Gloria Located at Northampton,Ma Moving in Northeasterly Direction.Status Downgrade to Tropical Storm Expected Early Evening on 850927.Salem Unit 1 & Millstone Complex Suffered Damage (← links)
- PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% (← links)