PNO-75-089:on 750912,plant Was Taken Offline,Following Analysis of Gas Samples Obtained on 750911,which Indicated Presence of Combustibles in Main Transformer
ML20236U888
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/12/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-089, PN-75-89, NUDOCS 9807310138
Download: ML20236U888 (1)


Text

S[){Q 0 8 W D $

l PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSUP2 f September 12, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-89

.e This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 10:30 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO

. .EE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY

.- ..WILL BE ISSUED IF WARRANTED.

Facility: Millstone Point 1 Northeast Nuclear Energy Company 4

Subject:

FORCED OUTAGE DUE TO MAIN TRANSFORMER PROBLDIS The licensee reported to our Region 1 Office that the plant was taken offline ,

at 2:00 a.m. September 12, 1975, following analysis of gas samples obtained l' September 11, which indicated presence of combustibles in the main trans-former at levels representative of significant internal transformer electri-cal problems. Following :Lsolation of the transformer and evaluation of the N problem, the licensee will determine feasibility of comencing annual re- ,

m. fueling outage originally scheduled for October 4, 1975. Time requirements

( for transformer maintenance are unknown at this time. Our Regional Office 1 estimates a delay of several weeks. I 1

Media interest is eq ected because of press sensitivity with respect to the l Millstone site. The State of Connecticut has been and is being kept informed.

A press release is not planned in that the licensee is informing the press.

OIE received notification of this occurrence by telephone from licensee at 9:12 a.m., 9/12/75. /p-

Contact:

FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:

l Chairman Anders Commissioner Mason . S. J. Chilk, SECY l Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE '

Commissioner Kennedy C . C . Kamprer , CA

  • ~

L. V. Gersick, EDO D. F. Knuth, IE J. A. Harris, P.A . .

B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg #/c24; H St //.h; MNBB //.Y7a; Luge / w, i

7 PRELIMINARY NOTIFICATION - NOT FOR FUBLIC DISCLOSURE 9807310138 750912 PDR I&E PN-75-089 PDR .

I

. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._____