ML20236U646

From kanterella
Jump to navigation Jump to search
PN-75-020:on 750512,CT Police Received Bomb Threat Directed at Facility.Licensee Implemented & Completed Searches at Units 1,2 and 3.Search Results Negative.Fbi Notified
ML20236U646
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/12/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-020, PN-75-20, NUDOCS 9807300361
Download: ML20236U646 (1)


Text

_ _ _ - _ _ _ _ _ _ - _ - _ - _ _ - _ - _ _ _ - _ _ _ _ _ - - - _ - _ _ _ _ - - _ - _ . - - _ _ _ .- - -

(

(,, ;! ( c 10 CFR 2.790 INFORMATION "

\

gc b PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l

, May 12, 1975 l

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-20 I

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation

~

and is basically all that is known by OIE staff as of 9:30 A.M. on dite of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS lm, .,

NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE'OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OF OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED. _

Facility: Millstone Unit 3 I Northeast Nuclear Energy Company Subjeet: BOMB THREAT IE was informed that the New Britain, Connecticut police received a bomb I W

threat directed at Millstone Unit 3 at 7 :20 A.M. , May 12,1975. The

' licensee assumed a site bomb threat and implemented and completed searches i at Units 1, 2 and 3. Search results'were negative. Local police and fire  !

' ( departtent personnel were at the site. Unit I is operating at 100% power. {

Units 2 & 3 are under construction. The bomb threat alert was called off at 8:25 A.M. The FBI and FPC were notified.  ;

Media interest is expected because of recent press coverage in the local area. The State of Connecticut has been and is being kept informed.

A press release is not planned.

Contact:

FADreheri IE x7261, HDThornburg, IE x7353, JGDavis, IE x7541 1

l 1

Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY l Commissioner Gilinsky Commissioner Rowder G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA T. J. McTiernan, AIA B. Huberman, PE L. V. Gossick, EDO D. F. Knuth$ IE J. A. Harris, PA B. C. Russhe, NRR -

H. H. Brown, ISP g[

K. R. Chapman, NMSS H. K, Shapar, ELD Transmitted: P Bldg /[8c'2d A; H St //.' /d o e ,; MD Bldg //, * )~ d4 7 0

  • PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE ii

, 10 CFR 2.790 INFORMATION

'. ^1 g' 9807300361 750512 l PDR I&E i

L._.________

PN-75-020 PDR .