PN-75-092:on 750915,nonisolable Leak in RCS Identified While Post Core Load Hot Functional Testing in Progress.Rcs Being Cooled Down to Make Repairs & Partial Draining of RCS Will Be Required
ML20236U910
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/16/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-092, PN-75-92, NUDOCS 9807310166
Download: ML20236U910 (1)


Text

i uoiN w/V q CAj y z'7 f.z-f P G % "

l l

_ PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE  ;

{ -'

q..  ;

September 16, 1975 F-

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-92 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 9
45 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS

. .30TIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

--NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facil1ty: Millstone Point 2 (DN 50-336)  !&

Northeast Nuclear Energy Company

Subject:

REACTOR COOLANT SYSTEM LEAK , i A nonisolable leak in the Reactor Coolant System (RCS) was identified l last night while post core load hot functional testing was in progress.

The leak is in the one inch delta P instrument line conne'eted to one of g

-- the RCS cold legs. The leak rate was less than one gallon per minute.

The RCS is being cooled down to make repairs, and partial draining of E

(

the RCS will be required. The cause of the leak has not been determined. j j i, This event has caused at least a two day delay in the licensee's sched- '

i uled date for initial criticality.

Media interest is expected because of close attention to Millstone opera-tions and status. The State of Connecticut has been and is being kept informed. A press release is not planned.

OIE received notification of this occurrence by telephone from Mr. E.

h/

Farrell, Lead Startup Engineer, at 8:05 a.m., 9/16/75.

Contact:

FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY. N Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA

)

L. V. G Esick, EDO D. F. Knuth, IE J . A. Harris , -PA-B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA j

K. R. Chapman, NHSS H. K. Shapar, ELD Transmitted: P Bldg //.7 5%. ; E S t #>OA. ; MNBB /cE kr. ; Luge r>,4 I

/

f = PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l

9807310166 750916 t PDR I&E 1 PN-75-092 PDR