ML20236U315
| ML20236U315 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/21/1975 |
| From: | Jennifer Davis, Dreher F, Thornburg H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PN-75-026, PN-75-26, NUDOCS 9807300037 | |
| Download: ML20236U315 (1) | |
Text
_ _ _ _
1 Q,g am) u m G hy 4
/CA p
.r. J PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE I
May 21, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
--PN-75-26 This preliminary notification constitutes EARLY notice of events of i
POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 10:30 a.m. on date of this notification.
IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO' TE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OF OCCURRENCE (BLUE SHEET) SUBSEQUENTLY
'WILL BE ISSUED IF WARRANTED.
$q Facility: Millstone Point 1 Northeast Nuclear Energy Company
Subject:
BLOWDOWN DUE TO FAILURE OF A SAFETY / RELIEF VALVE TO RESEAT s
DURING TESTING I
The licensee reported that at approximately 11:30 p.m. on } fay 20, 1975 during testing of a single safety / relief valve it stuck in the open s
._ position. The plant was operating at full power (1035 psi operating
~~
pressure). The reactor's cooldown nate was about 200 degrees F/ hour and the Technical Specification limit of 100 degrees F/ hour was
(
exceeded. The~ valve rescated at 160 psi and the plant was manually shutdown in accordance with the licensee's procedures. The failure 1
and consequences of this event are being investigated by the licensee.
Media interest is expected because of news attention being given to j
Millstone Point 1.
The State of Connecticut is being kept informed.
A press release
{
is not planned.
l 1
Contact:
FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:
Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kammerer, CA l
1 l
L. V. GorsIck, EDO D. F. Knuth, IE J. A. Harris, PA j
~
B. C. Rusche, TRR H. H. Brown, ISP i
K. R. Chapman, NMSS H. K, Shapar, ELD Transmitted: P Bldg /A,2 c
_ ; H St /C.)r m.; MD Bldg N'? h,
C/
y, M.-
(
PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE PN-75f37 75052g 026 PDR
\\
_