ML20236V344

From kanterella
Jump to navigation Jump to search
PN-75-075:on 750822,bomb Threat Was Received.Search Procedures Implemented.Local Police & Fire Dept Notified
ML20236V344
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/22/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-075, PN-75-75, NUDOCS 9808030101
Download: ML20236V344 (1)


Text

f'o f %) la L G C

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE a

August 22, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-75 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 10:45 a.m.

date of this notification. IT SHOULD BL SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO

~

BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

~80TIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY

. , , , , . . , , WILL BE ISSUED IF WARRANTED.

1 Facility: Millstone Unit 1 l 1

Northeast Nuclear Energy Company

)

Subject:

BOMB THREAT 1 i

Region I was informed that the licensee received a bomb threat (source unknown at this time) at 10:00 a.m., August 22, 1975, directed at the.

  • Millstone site. Search procedures were implemented and at;e in progress.

The bomb reportedly is scheduled to explode at 12:00 noon, August 22, gg

- 1975. Local police and fire department personnel have been notified.

Unit 1 is operating at 90% power; Unit 2 has loaded fuel under license issued August 1. Unit 3 is under construction.

\.

The FBI and FPC were notified. l Media interest is expected because of recent press coverage in the local area. The State of Connecticut is being kept informed. A press release is not planned.

OIE received notification of this occurrence by telephone from the licensee at 10:05 a.m., 8/22/75.

Contact:

F.A. Dreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution :

Chairman Anders CommisE.ioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kamm'erer, CA l L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA l B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA l K. R. Chapman, NMS3 H. K. Shapar, ELD Transmitted: P Bldg //l/ft_ ; E St //l0/4 ; MNBB //.*1_[r,; Luge M f/,, b '

g\

ar

' 1

  • ~*

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l

9808030101 PDR I&E 750822 PN-75-075 PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . -_