PN-75-126:on 751113,licensee Reported Facility Shutdown,To Locate Source of Unidentified Leakage Measured at 2.2 Gpm. Source Determined to Be Cracked Weld in One Inch Unisolatble Instrument Line
ML20236X022
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/14/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-126, NUDOCS 9808070060
Download: ML20236X022 (1)


Text

r 8D9C p:AG[W f~

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE l

November 14, 1975 i

hi PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-126 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 11:30 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

~ " NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facility:, Millstone Point 1 (DN 50-245) '

Northeast Nuclear Energy Company i

Subject:

UNSCHEDULED SHUTDOWN AND IDENTIFICATION OF UNISOLATABLE LEAK IN INSTRUMENT LINE l

The licensee reported that the facility was shutdown at 11:00 p.m. on i November 13, 1975, to locate the source of unidentified leakage measured l at 2.2 gpm (technical specification requirement 2.5 gpm). The source was determined to be a cracked weld in a one inch unisolatable instrument line. This line, one of five, provides the pressure indication for Lov M.

Pressure Coolant Injection detection logic. The reactor must be placed in cold shutdown for repairs.

' f

.= l l

1 Media interest is expected because of close attention being given to this facility and to plant availability considerations. The State of Connecticut has been informed. A press release is being made by the licensee.

OIE received notification of this occurrence by telephone from licensee at 10:17 a.m., 11/14/75.

Contact:

FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 1 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Fennedy C. C. Kammerer, CA l

L. V. Gossick, EDO D . F . Kri*uth , IE J. A. Harris, PA B. C. Jhrsche, NRR - - J. La Fleur, ISP T. J. McTiernaq, AIA K. R. Chapman, NMSS H. K. Shapar, ELD g Transmitted: P Bldge.2Jeop-; H St g.Y@ MNBB c /9 r,4 LugeM74I!