PN-75-099:on 750930,nonisolable Leak in RCS Identified While Post Core Load Hot Functional Testing in Progress.Rcs Being Cooled Down to Make Repairs
ML20236U869
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/01/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-099, PN-75-99, NUDOCS 9807310126
Download: ML20236U869 (1)


Text

. _ _ _ _ _ _ _ _ - _ - _ - _ _ _ -

$$ &%'~r%& ( W j / 0.d l y:- y PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE g=._

October 1, 1975 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -PN-75-99 -

,. This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation ' '

and is basically all that is known by OIE staff as of 9:30 a.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facility: Millstone Point 2 (DN 50-336)

Northeast Nuclear Energy Company.

Subject:

REACTOR COOLANT SYSTEM LEAK A nonisolable leak in the Reactor Coolant System (RCS) was identified I last night while post core load hot functional testing was in progress.  !

The leak is in a one inch delta P instrument line connected to one of I the RCS cold legs. The leak rate was less than one gallon per minute. I The RCS is being cooled down to make repairs. This is similir to the '

18bi leak reported on September 16, 1975. The cause of the leak has not been determined. This event will qause a one or two day delay in the ["

dif; licensee's scheduled date for initial criticality, i'

Media interest is expected because of close attention to Millstone opera-tions and status. The State of Connecticut has been and is being kept -

informed. A press release is not planned.

OIE received notification of this occurrence by telephone at 9:00 a.m.,

10/1/75,.from Mr. R. L. Spessard, a Region I inspector who is onsite.

Contact:

FADreher, IE x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution:

Chairman Anders Commissioner Mason S. J. Chilk, SECY

[

/

Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE ,

Commissioner Kennedy C. C. Kammerer, CA' d l A::-

L. V. Gossick, EDO D. F. Knuth, IE J. A. Harris, PA O B. C. Rusch'e, NRR K. R. CRs) man, NMSS

  • H. H. Brown, ISP H. K. Shapar ELD T. J. McTiernan, AIA Q l Transmitted: P Bldg //k; E St /Ok; HNBB //k ; Luge _A L

i

. PRELIMINARY NOTIFICATION - NOT FOR FUBLIC DISCLOSUP2

( Tiik E=

9807310126 751001 i PDR I4iE i, PN-75-099 PDR ,