PN-75-055:750722,after Completion of Loss of Offsite Power Test,W/Diesels Shutdown,Six Inch Cast Carbon Steel Svc Water Line Severed.Saltwater Flooded a & B Diesel Rooms.Cause of Pipe Failure Being Investigated
ML20236U496
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/23/1975
From: Jennifer Davis, Dreher F, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PN-75-055, PN-75-55, NUDOCS 9807300207
Download: ML20236U496 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE I July 23, 1975 l []m!: -

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN-75-55 l

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation l and is basically all that is known by OIE staf f as of 3
00 p.m. on the date of this notification. IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT

. .110TIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY

' 'ILL BE ISSUED IF WARRANTED.

...s .. ,

Facility: Millstone 2 (DN 50-336) - (Late stages of preoperational testing)

Northeast Nuclear Energy Company

Subject:

COMPLETE SEVERENCE OF SERVICE WATER PIPE TO THE "A" DIESEL GENERATOR At 7 :30 p.m. , on July 22, 1975, after completion of the loss of offsite power test, with the diesels shutdown, the six inch cast carbon steel service water line severed. Two thousand gallons per minute of saltwater flooded the "A" Diesel Room to one foot depth. Several components includ-ing diesel control panel, fuel pumps, and air cotopressor ' vere flooded. ,__

- A heat exchanger head was damaged by pipe whip. E

.:. J::,e inch of water leaked to the "B'I Diesel Room. No damage to the diesel

(,

or its support systems was observed, but its operability is being checked.

The cause of the pipe f ailure is being investigated.

Media interest is not expected. The State of Connecticut has been informed.

A press release is not planned.

OIE (Region I) received notification of this occurrence by telephone from Mr. Kenyon at 8:00 a.m. on July 23, 1975.

Contact:

FADreher, IE.x7261 HDThornburg, IE x7353 JGDavis, IE x7541 Distribution: h!

Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Kamperer, CA y O

L. V. Gtiiiisick, EDO ' ' D. F. Knuth, IE J. A. Harris,.PA.

B. C. Rusche, NRR H. H. Brown, ISP T. J. McTiernan, AIA k l K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg.J.W o. ; E St 8:5Z.py MNBB Vich,; Luge m

([. PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE 9807300207 750723 I PDR IEE PN-75-055 PDR ,