ML17309A422: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:gccE~~TED DIS@1BUTION DEMONSTR04 SYSTEM"Is4,REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:8903210455 DOC.DATE89~~5~NOTARIZED:
{{#Wiki_filter:gccE~~TED DIS@1BUTION DEMONSTR04 SYSTEM"Is 4, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8903210455 DOC.DATE 89~~5~NOTARIZED:
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION DODGE,R.E.
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas6ElectricCorp.MECREDY,R.C.
Rochester Gas 6 Electric Corp.MECREDY,R.C.
Rochester GasSElectricCorp.RECIP.NAME RECIPIENT AFFXLXATXON DOCKET05000244
Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFXLXATXON DOCKET 05000244


==SUBJECT:==
==SUBJECT:==
Monthlyopera'w~.etforFeb1989forREGinnaNuclearPowerPlant.W89031ltr.DISTRIBUTXON CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Monthly opera'w~.e t for Feb 1989 for RE Ginna Nuclear Power Plant.W 89031 ltr.DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
S05000244RECIPIENT XDCODE/NAME PD1-3LASTAHLE,CINTERNAL:
S 05000244 RECIPIENT XD CODE/NAME PD1-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL EGGG S IMPSON g F LPDR NSIC COPIES LTTR ENCL 1 0 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB ll NRR DEEP RPB 10 01 EGS(G WILLIAMS g S NRC PDR COPIES LTTR ENCL 5 5 1 1 1 1 1 1 1 1 1 1 1 1 R I NOTE IO ALL"RIBS" RECIPIENIS'LEASE HELP US TO REZUCE WA<i~lCONI'ACT'IHE DOCXMENZ COFZROL DESK ROOM Pl-37 (EXT.20079)IO EZJMNATE YOUR NAME FRQH DIPHGBVTIGN LISTS H)R DOCUME&#xc3;ZS YOU DClN~T NEED)TOTAL NUMBER OF COPIES, REQUIRED: LTTR 22 ENCL 20 c OPERATING STATUS OPERATING DATA REPORT DOCKET NO.DATF March 15, 1989 COMPLETED BY g~Robert E.Dodge TFLFPHONF 315-524-4446 x-396 Ginna Station 1520 470 I~Unit Name: R.E.6!NNA NUCLEAR POWER PLANT 2.Reporting Period: Febru, 1989 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Nct hlWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes The reactor power level was maintained at 100%for the majority of the report period with some exceptions detailed on page 3 and 4 of the report.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Rcport, Give Reasons: 9.Power Level to Which Restricted, If Any (Nct MWc): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date Cumulative 168,840 133 101.98 1 687.55*130 666.88 8.5*184,038,785 60,500,324 57,411,430 77.398 77.40%73.755 6.33%11.Hours In Reporting Period 672 1,416 12.Number of Hours Reactor Was Critical 672 1 404.37 13~Reactor Reserve Shutdown Hours 0 0 14.Hours Gcncrator On-Line 672 1 395 15.Unit Rcservc Shutdown Hours 0 0 16.Gross Thermal Energy Generated (hlV/H)2, 068, 371 17.Gross Electrical Energy Generated (MV/H)341,325 700,995 18.Nct Flectrical Energy Generated (hlWH)324,877 666,972 19.Unit Service Factor 100%98.52%20.Unit Availability Factor 100%98.52%21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 0 1.48%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Annual Refueling and Maintenance Shutdown-March 17, 1989.45-55 days 25.If Shut Down At End Of Rcport.Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
AEOD/DOAARMTECHADVNRR/DOEA/EAB 11NUDOCS-ABSTRACT RGN1EXTERNALEGGGSIMPSONgFLPDRNSICCOPIESLTTRENCL10101122111111111111RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NRR/DLPQ/PEB llNRRDEEPRPB1001EGS(GWILLIAMSgSNRCPDRCOPIESLTTRENCL55111111111111RINOTEIOALL"RIBS"RECIPIENIS'LEASE HELPUSTOREZUCEWA<i~lCONI'ACT'IHEDOCXMENZCOFZROLDESKROOMPl-37(EXT.20079)IOEZJMNATEYOURNAMEFRQHDIPHGBVTIGN LISTSH)RDOCUME&#xc3;ZS YOUDClN~TNEED)TOTALNUMBEROFCOPIES,REQUIRED:
INITIA L CRITICA LITY INITIAL ELECTRICITY COhlMFRCIAL OPERATION"Cumnulative total conmencing January 1, 1975 8903210455 890228 PDR ADOCK 05000244 R PDC Forecast Achieved Atv.aSS 49 88 OPERATING DATA REPORT DOCKET NO.50 244 Mar h 15, 1989'OMPLETED BY REVISED Robert E.Dod e OPERhTING SThTUS l~Unic Name: R.E.GINNA NUCLEAR POWER PLANT 2 Rcporcing Period: January, 8 3.Licensed Thermal Power (MWt): 4.Nameplacc Racing (Gross MWe): 470 5.Design Electrical Racing (Net MWe): 490 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)TELFPHONE 315-524-4446 x-396 Gonna State.on Notes The reactor power level was maintained at 100%for the majority of the report period with some exceptions detailed on page 3 and 4 of the repor Since Last Rcpocc, Give Reasons:~9.Power Level to Which Restricted, lf hny (Net MWc): IO.Reasons For Restrictions, lf hny: This Month Yr:to-Date Cumulacive 732.37 723 1,061',710~*
LTTR22ENCL20 cOPERATING STATUSOPERATING DATAREPORTDOCKETNO.DATFMarch15,1989COMPLETED BYg~RobertE.DodgeTFLFPHONF 315-524-4446 x-396GinnaStation1520470I~UnitName:R.E.6!NNANUCLEARPOWERPLANT2.Reporting Period:Febru,19893.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NcthlWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):NotesThereactorpowerlevelwasmaintained at100%forthemajorityofthereportperiodwithsomeexceptions detailedonpage3and4ofthereport.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastRcport,GiveReasons:9.PowerLeveltoWhichRestricted, IfAny(NctMWc):10.ReasonsForRestrictions, IfAny:ThisMonthYr:to-Date Cumulative 168,840133101.981687.55*130666.888.5*184,038,785 60,500,324 57,411,430 77.39877.40%73.7556.33%11.HoursInReporting Period6721,41612.NumberofHoursReactorWasCritical6721404.3713~ReactorReserveShutdownHours0014.HoursGcncrator On-Line672139515.UnitRcservcShutdownHours0016.GrossThermalEnergyGenerated (hlV/H)2,068,37117.GrossElectrical EnergyGenerated (MV/H)341,325700,99518.NctFlectrical EnergyGenerated (hlWH)324,877666,97219.UnitServiceFactor100%98.52%20.UnitAvailability Factor100%98.52%21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate01.48%24.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):AnnualRefueling andMaintenance Shutdown-March17,1989.45-55days25.IfShutDownAtEndOfRcport.Period,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
',061,710"*359,670 342,095 97.18%97.18%97.83%97.83%2.82%45-55 da s ll.Hours In Reporting Period 744 l2.Number of Hours Reactor Was Critical 732~37 l3.Reactor Reserve Shutdown Hours 14.Ilours Gcncrator On-Linc 15.Unit Rcservc Shutdown Hours l6.Gross Thermal Energy Generaced (MWH)l7.Gross Electrical Energy Generated (MWH)18.Ncc Fleccrical Fnergy Gencratcd (MWH)342, 095 l 9.Unit Service Factor 97.18%20.Unit hvailubilicy Factor 97.18%21.Unit Capacicy Factor (Using MDC Nec)97.83%22.Unit Capacicy Faccor (Using DER Net)23 Unit Forced Outage Rate 24.Shutdowns Scheduled Over Nexc 6 Months (Type, Dace and Duration of Each): Annual Refuelin and Maintenance Shutdown-March 17, 168,168 132,429.98 1,687.55 129,994.88 8 5*183,032,124**
INITIALCRITICALITYINITIALELECTRICITY COhlMFRCIAL OPERATION "Cumnulative totalconmencing January1,19758903210455 890228PDRADOCK05000244RPDCForecastAchievedAtv.aSS4988 OPERATING DATAREPORTDOCKETNO.50244Marh15,1989'OMPLETED BYREVISEDRobertE.DodeOPERhTING SThTUSl~UnicName:R.E.GINNANUCLEARPOWERPLANT2Rcporcing Period:January,83.LicensedThermalPower(MWt):4.Nameplacc Racing(GrossMWe):4705.DesignElectrical Racing(NetMWe):4906.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)TELFPHONE 315-524-4446 x-396GonnaState.onNotesThereactorpowerlevelwasmaintained at100%forthemajorityofthereportperiodwithsomeexceptions detailedonpage3and4ofthereporSinceLastRcpocc,GiveReasons:~9.PowerLeveltoWhichRestricted, lfhny(NetMWc):IO.ReasonsForRestrictions, lfhny:ThisMonthYr:to-Date Cumulacive 732.377231,061',710~*
60,158,999 57,086,553 77.30%77.31%73 63**73 63**6.36%1989 25.If Shuc Down hc End Of Report.Period, Escimatcd Date of Scartup: 26.Units ln Test Status (Prior co Commercial Operation):
',061,710
INITIhL CRITIChLITY INITlhL ELECTRICITY COMMFRCIh L OPF RhTION Forecasc Achieved*Cummulative total commencing January 1, 1975**Corrected previously submitted figure that was in error htv<is is ts
"*359,670342,09597.18%97.18%97.83%97.83%2.82%45-55dasll.HoursInReporting Period744l2.NumberofHoursReactorWasCritical732~37l3.ReactorReserveShutdownHours14.IloursGcncrator On-Linc15.UnitRcservcShutdownHoursl6.GrossThermalEnergyGeneraced (MWH)l7.GrossElectrical EnergyGenerated (MWH)18.NccFleccrical FnergyGencratcd (MWH)342,095l9.UnitServiceFactor97.18%20.Unithvailubilicy Factor97.18%21.UnitCapacicyFactor(UsingMDCNec)97.83%22.UnitCapacicyFaccor(UsingDERNet)23UnitForcedOutageRate24.Shutdowns Scheduled OverNexc6Months(Type,DaceandDurationofEach):AnnualRefuelinandMaintenance Shutdown-March17,168,168132,429.98 1,687.55129,994.88 85*183,032,124**
~'lf'f lp)7't J I, j AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE March 15 1989 COMPLETED BY Qr Robert E.Dodge TELEPHONE 1 3 15 524-4446 Ext.396 at Ginna MONTH Februar 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)489 17~489 2~485 18'88 3~485 19.489 4~489 20.489 5~489 21~490 6.412 22'90 7~418 23.490'~490 24'89 9~490 25'89 10'90 26.489 489 27'89 12~489'28.489 13.488 29'4.490 30.15.490 31.16.491 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month..Compute to the nearest whole megawatt.
60,158,999 57,086,553 77.30%77.31%7363**7363**6.36%198925.IfShucDownhcEndOfReport.Period,Escimatcd DateofScartup:26.UnitslnTestStatus(PriorcoCommercial Operation):
l)OCKET NO.~0 244 UNITNAMI:.
INITIhLCRITIChLITY INITlhLELECTRICITY COMMFRCIh LOPFRhTIONForecascAchieved*Cummulative totalcommencing January1,1975**Corrected previously submitted figurethatwasinerrorhtv<isists
R.E.GINNA NUCLEAR POWER PLANK UNIT SHUTDOWN AND POWER REDUCTIONS DAT COhiP LE1'ED I3Y+r Robert.ge REPORT hiONTH F MMY, 1989 1.I.LI:PiiONI:
~'lf'flp)7'tJI,j AVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEMarch151989COMPLETED BYQrRobertE.DodgeTELEPHONE 1315524-4446Ext.396atGinnaMONTHFebruar1989DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
315-524-4446 x-396 Ginna Station Ho.Date c 0 0~0 O~Pl C 0 0 0 nc So 0 E u o>cc 0EO C 0 O licensee Event Report 41 Ew 0 Vl Q 0 0'0 Q 0 O Couse 8a Corrective Action to Prevent Recurrence 89-2 2/6/89 36 INST RU Reactor power level reduced to approximately 70$because of turbine runback from E-H and Ground.1 F: Forced S: Scheduled Rtv.4/89 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction
DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 48917~4892~48518'883~48519.4894~48920.4895~48921~4906.41222'907~41823.490'~49024'899~49025'8910'9026.48948927'8912~489'28.48913.48829'4.49030.15.49031.16.491INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month..Computetothenearestwholemegawatt.
'-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)hiethod: 14fanual 2-hianual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit I-Same Source NARRATXVE  
l)OCKETNO.~0244UNITNAMI:.
 
R.E.GINNANUCLEARPOWERPLANKUNITSHUTDOWNANDPOWERREDUCTIONS DATCOhiPLE1'EDI3Y+rRobert.geREPORThiONTHFMMY,19891.I.LI:PiiONI:
==SUMMARY==
315-524-4446 x-396GinnaStationHo.Datec00~0O~PlC000ncSo0Euo>cc0EOC0OlicenseeEventReport41Ew0VlQ00'0Q0OCouse8aCorrective ActiontoPreventRecurrence 89-22/6/8936INSTRUReactorpowerlevelreducedtoapproximately 70$becauseofturbinerunbackfromE-HandGround.1F:ForcedS:Scheduled Rtv.4/894949Reason:A-Equipment Failure(Explain)
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE March 5 198 COMPLETED BY p~Robert E.Dodge TELEPHONE 1 315 524-4446 EXT.396 at Ginna MONTH Februar 1989 The unit operated at 100%reactor power level for the majority of the report period, with a few exceptions as follows: On 2/6/89 the reactor power level was reduced to 704 because of turbine runback from E-H and ground.The reactor power level was restored to 1004 on 2/7/89.On 2/13/89 the reactor power level was reduced to 984 to perform Periodic Tests of the Auxiliary Feedwater System.On 2/13/89 the reactor power level was reduced to 994 to perform Periodic Tests of the Standby Auxiliary Feedwater System Flow Check.
B-Maintenance orTestC-Refueling D-Regulatory Restriction
e GINNA STATION MAINTENANCE REPORT
'-Operator Training&LicenseExamination F-Administrative G-Operational Error(Explain)
 
H-Other(Explain) hiethod:14fanual2-hianual Scram.3-Automatic Scram.4-Other(Explain)
==SUMMARY==
ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)ExhibitI-SameSource NARRATXVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEMarch5198COMPLETED BYp~RobertE.DodgeTELEPHONE 1315524-4446EXT.396atGinnaMONTHFebruar1989Theunitoperatedat100%reactorpowerlevelforthemajorityofthereportperiod,withafewexceptions asfollows:On2/6/89thereactorpowerlevelwasreducedto704becauseofturbinerunbackfromE-Handground.Thereactorpowerlevelwasrestoredto1004on2/7/89.On2/13/89thereactorpowerlevelwasreducedto984toperformPeriodicTestsoftheAuxiliary Feedwater System.On2/13/89thereactorpowerlevelwasreducedto994toperformPeriodicTestsoftheStandbyAuxiliary Feedwater SystemFlowCheck.
FEBRUARY g 1 989 During the month of February, routine maintenance and inspections were completed.
eGINNASTATIONMAINTENANCE REPORTSUMMARYFEBRUARYg1989DuringthemonthofFebruary, routinemaintenance andinspections werecompleted.
Major safety related work included: a~b.c~lA Spent Fuel Pit Recirc Pump-minor maintenance and coupling repair I g2 SPING Monitor-P.M.Inspection Snubber Inspection per M-40  
Majorsafetyrelatedworkincluded:
~~<zzs/irzziirzz A HO'rrzgy iz(zzzz/////tu/////II/57 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K N(W ba1~OetA1C 14649-0001 TCLEPHONE ARcA cooe isa 546.2700 GINNA STATION March 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-
a~b.c~lASpentFuelPitRecircPump-minormaintenance andcouplingrepairIg2SPINGMonitor-P.M.Inspection SnubberInspection perM-40  
~~<zzs/irzziirzz AHO'rrzgyiz(zzzz/////tu/////II/57 ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.KN(Wba1~OetA1C14649-0001 TCLEPHONE ARcAcooeisa546.2700GINNASTATIONMarch15,1989USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555-


==Subject:==
==Subject:==
Monthly Report for February, 1989 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244


MonthlyReportforFebruary, 1989Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244
==Dear Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1989.Very truly yours, Robert C.Mec ed General Manager'uclear Production RCM/eeh Attachments cc: Mr.William T.Russell NRC (1)}}
==DearSir:==
PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofFebruary, 1989.Verytrulyyours,RobertC.MecedGeneralManager'uclear Production RCM/eehAttachments cc:Mr.WilliamT.RussellNRC(1)}}

Revision as of 11:12, 6 July 2018

Monthly Operating Rept for Feb 1989 for Re Ginna Nuclear Power Plant
ML17309A422
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1989
From: DODGE R E
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17251A428 List:
References
NUDOCS 8903210455
Download: ML17309A422 (9)


Text

gccE~~TED DIS@1BUTION DEMONSTR04 SYSTEM"Is 4, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8903210455 DOC.DATE 89~~5~NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas 6 Electric Corp.MECREDY,R.C.

Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFXLXATXON DOCKET 05000244

SUBJECT:

Monthly opera'w~.e t for Feb 1989 for RE Ginna Nuclear Power Plant.W 89031 ltr.DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

S 05000244 RECIPIENT XD CODE/NAME PD1-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL EGGG S IMPSON g F LPDR NSIC COPIES LTTR ENCL 1 0 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB ll NRR DEEP RPB 10 01 EGS(G WILLIAMS g S NRC PDR COPIES LTTR ENCL 5 5 1 1 1 1 1 1 1 1 1 1 1 1 R I NOTE IO ALL"RIBS" RECIPIENIS'LEASE HELP US TO REZUCE WA<i~lCONI'ACT'IHE DOCXMENZ COFZROL DESK ROOM Pl-37 (EXT.20079)IO EZJMNATE YOUR NAME FRQH DIPHGBVTIGN LISTS H)R DOCUMEÃZS YOU DClN~T NEED)TOTAL NUMBER OF COPIES, REQUIRED: LTTR 22 ENCL 20 c OPERATING STATUS OPERATING DATA REPORT DOCKET NO.DATF March 15, 1989 COMPLETED BY g~Robert E.Dodge TFLFPHONF 315-524-4446 x-396 Ginna Station 1520 470 I~Unit Name: R.E.6!NNA NUCLEAR POWER PLANT 2.Reporting Period: Febru, 1989 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Nct hlWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes The reactor power level was maintained at 100%for the majority of the report period with some exceptions detailed on page 3 and 4 of the report.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Rcport, Give Reasons: 9.Power Level to Which Restricted, If Any (Nct MWc): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date Cumulative 168,840 133 101.98 1 687.55*130 666.88 8.5*184,038,785 60,500,324 57,411,430 77.398 77.40%73.755 6.33%11.Hours In Reporting Period 672 1,416 12.Number of Hours Reactor Was Critical 672 1 404.37 13~Reactor Reserve Shutdown Hours 0 0 14.Hours Gcncrator On-Line 672 1 395 15.Unit Rcservc Shutdown Hours 0 0 16.Gross Thermal Energy Generated (hlV/H)2, 068, 371 17.Gross Electrical Energy Generated (MV/H)341,325 700,995 18.Nct Flectrical Energy Generated (hlWH)324,877 666,972 19.Unit Service Factor 100%98.52%20.Unit Availability Factor 100%98.52%21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 0 1.48%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Annual Refueling and Maintenance Shutdown-March 17, 1989.45-55 days 25.If Shut Down At End Of Rcport.Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

INITIA L CRITICA LITY INITIAL ELECTRICITY COhlMFRCIAL OPERATION"Cumnulative total conmencing January 1, 1975 8903210455 890228 PDR ADOCK 05000244 R PDC Forecast Achieved Atv.aSS 49 88 OPERATING DATA REPORT DOCKET NO.50 244 Mar h 15, 1989'OMPLETED BY REVISED Robert E.Dod e OPERhTING SThTUS l~Unic Name: R.E.GINNA NUCLEAR POWER PLANT 2 Rcporcing Period: January, 8 3.Licensed Thermal Power (MWt): 4.Nameplacc Racing (Gross MWe): 470 5.Design Electrical Racing (Net MWe): 490 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)TELFPHONE 315-524-4446 x-396 Gonna State.on Notes The reactor power level was maintained at 100%for the majority of the report period with some exceptions detailed on page 3 and 4 of the repor Since Last Rcpocc, Give Reasons:~9.Power Level to Which Restricted, lf hny (Net MWc): IO.Reasons For Restrictions, lf hny: This Month Yr:to-Date Cumulacive 732.37 723 1,061',710~*

',061,710"*359,670 342,095 97.18%97.18%97.83%97.83%2.82%45-55 da s ll.Hours In Reporting Period 744 l2.Number of Hours Reactor Was Critical 732~37 l3.Reactor Reserve Shutdown Hours 14.Ilours Gcncrator On-Linc 15.Unit Rcservc Shutdown Hours l6.Gross Thermal Energy Generaced (MWH)l7.Gross Electrical Energy Generated (MWH)18.Ncc Fleccrical Fnergy Gencratcd (MWH)342, 095 l 9.Unit Service Factor 97.18%20.Unit hvailubilicy Factor 97.18%21.Unit Capacicy Factor (Using MDC Nec)97.83%22.Unit Capacicy Faccor (Using DER Net)23 Unit Forced Outage Rate 24.Shutdowns Scheduled Over Nexc 6 Months (Type, Dace and Duration of Each): Annual Refuelin and Maintenance Shutdown-March 17, 168,168 132,429.98 1,687.55 129,994.88 8 5*183,032,124**

60,158,999 57,086,553 77.30%77.31%73 63**73 63**6.36%1989 25.If Shuc Down hc End Of Report.Period, Escimatcd Date of Scartup: 26.Units ln Test Status (Prior co Commercial Operation):

INITIhL CRITIChLITY INITlhL ELECTRICITY COMMFRCIh L OPF RhTION Forecasc Achieved*Cummulative total commencing January 1, 1975**Corrected previously submitted figure that was in error htv<is is ts

~'lf'f lp)7't J I, j AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE March 15 1989 COMPLETED BY Qr Robert E.Dodge TELEPHONE 1 3 15 524-4446 Ext.396 at Ginna MONTH Februar 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)489 17~489 2~485 18'88 3~485 19.489 4~489 20.489 5~489 21~490 6.412 22'90 7~418 23.490'~490 24'89 9~490 25'89 10'90 26.489 489 27'89 12~489'28.489 13.488 29'4.490 30.15.490 31.16.491 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month..Compute to the nearest whole megawatt.

l)OCKET NO.~0 244 UNITNAMI:.

R.E.GINNA NUCLEAR POWER PLANK UNIT SHUTDOWN AND POWER REDUCTIONS DAT COhiP LE1'ED I3Y+r Robert.ge REPORT hiONTH F MMY, 1989 1.I.LI:PiiONI:

315-524-4446 x-396 Ginna Station Ho.Date c 0 0~0 O~Pl C 0 0 0 nc So 0 E u o>cc 0EO C 0 O licensee Event Report 41 Ew 0 Vl Q 0 0'0 Q 0 O Couse 8a Corrective Action to Prevent Recurrence 89-2 2/6/89 36 INST RU Reactor power level reduced to approximately 70$because of turbine runback from E-H and Ground.1 F: Forced S: Scheduled Rtv.4/89 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction

'-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)hiethod: 14fanual 2-hianual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit I-Same Source NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE March 5 198 COMPLETED BY p~Robert E.Dodge TELEPHONE 1 315 524-4446 EXT.396 at Ginna MONTH Februar 1989 The unit operated at 100%reactor power level for the majority of the report period, with a few exceptions as follows: On 2/6/89 the reactor power level was reduced to 704 because of turbine runback from E-H and ground.The reactor power level was restored to 1004 on 2/7/89.On 2/13/89 the reactor power level was reduced to 984 to perform Periodic Tests of the Auxiliary Feedwater System.On 2/13/89 the reactor power level was reduced to 994 to perform Periodic Tests of the Standby Auxiliary Feedwater System Flow Check.

e GINNA STATION MAINTENANCE REPORT

SUMMARY

FEBRUARY g 1 989 During the month of February, routine maintenance and inspections were completed.

Major safety related work included: a~b.c~lA Spent Fuel Pit Recirc Pump-minor maintenance and coupling repair I g2 SPING Monitor-P.M.Inspection Snubber Inspection per M-40

~~<zzs/irzziirzz A HO'rrzgy iz(zzzz/////tu/////II/57 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K N(W ba1~OetA1C 14649-0001 TCLEPHONE ARcA cooe isa 546.2700 GINNA STATION March 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-

Subject:

Monthly Report for February, 1989 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1989.Very truly yours, Robert C.Mec ed General Manager'uclear Production RCM/eeh Attachments cc: Mr.William T.Russell NRC (1)