Revised Monthly Operating Rept for Jan 1989 for Re Ginna Nuclear Power Station
ML17251A427
Person / Time
Site: Ginna 
Issue date: 01/31/1989
From: Dodge R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17251A428 List:
References
NUDOCS 8904120327
Download: ML17251A427 (1)


Text

OPERATING DATA REPORT DOCKET NO S

DhTE Mar 15 1989 COMPLETED BY

~

REVISED Robert E.

Dod e

OPERATING STATUS I. Unic Name:

R E. <INNA NUCLEAR POWER PLANT

2. Reporcing period.
Januar, 9
3. Licensed Thermal Power (MWc):

1520

4. Nameplate Racing (Gross MWe)t 470
5. Design Elecuical Rating (Net MWe):

490

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe)c
8. IfChanges Occur in Capacicy Ratings (Items Number 3 TELFPHONE 315-524-4446 x-396 irma Station Notes The reactor power level was maintained at 100%

for the majority of the report period with some exceptions detailed on page 3 and 4 of the repor Through 7) Since Last Repocc, Give Reasons:

9. Power Level to Which Restricted, If hny (Net MWc):

l0. Reasons For Resuiccions, lf hny:

This Month Yr..to.Date Cumulacive ll. Hours In Reporting Period 744 744 l2. Number of Hours Reaccor Was Cticical 732 ~ 37 732 ~ 37 l3. Reactor Reserve Shutdown Hours l4. Ilours Gcncrator On Linc 723 lS. Unit Reserve Shutdown Hours 0

16. Gross Thermal Energy Generated (MWH) 1,061,71()+*

1,061,710*<<

l7. Gross Flecuical Energy Generated (MWH) 359,670 l8. Nec Electrical Enecgy Generated (MWH) 342,095 342, 095 l9. Unit Service Factor 97.18%

97.18%

20. Unit hvailabilicy Factor 97.18%

97.18%

21. Unic Capacicy Faccoc (Vsiag MDC Net) 97.83%

97.83%

22. Unit Capacicy Factor (Using DER Net) 97.83%

97.83%

23. Unic Forced Outage Rate
2. 82%

2.82%

24. Shutdowns Scheduled Over Nexc 6 Months (Type, Date and Duracioa of Each):

Annual Refuelin and Maintenance Shutdown - March 17, 45 - 55 da s

168,168 132,429.98 1,687.55 129,994.88 8.5*

183,032,124**

60,158,999 57,086,553 77.30%

77.31%

73.63**

73'3**

6.36%

1989

25. If Shut Do<<n hc End Of Report. Period, Escimated Dace of Scarcup:
26. Units ln Tesc Status (Prior co Commercial Operation):

INITIAL CRITICALITY INITIALELECTRICITY COMMFRCIALOPERATION F ocecast bchieved

  • Cummulative total commencing January 1,

1975

    • Corrected previously submitted figure that was in error 8904120327 8901~>

PDR ADOCK 05000244 f

"r R

PDR g..",

L

~cv 415 494s