ACCESSION NBR:8903210455 DOC.DATE 89~~5~ NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

MECREDY,R.C. Rochester Gas S Electric Corp.

RECIP.NAME RECIPIENT AFFXLXATXON

SUBJECT:

Monthly opera 'w~.e Power Plant.W 89031 tltr.

for Feb 1989 for RE Ginna Nuclear DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PD1-3 PD 5 5 STAHLE,C 1 0 INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 1

2 1

1 2

1 AEOD/DSP/TPAB NRR/DLPQ/PEB NRR DEEP RPB ll 10 1

1 1

1 1

1 NUDOCS-ABSTRACT 1 1 01 1 1 RGN1 1 1 EXTERNAL EGGG S IMPSON g F 1 1 EGS(G WILLIAMS S g 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I NOTE IO ALL "RIBS" RECIPIENIS'LEASE HELP US TO REZUCE WA<i~l CONI'ACT 'IHE DOCXMENZ COFZROL DESK ROOM Pl-37 (EXT. 20079) IO EZJMNATE YOUR NAME FRQH DIPHGBVTIGN LISTS H)R DOCUMEÃZS YOU DClN~T NEED)

TOTAL NUMBER OF COPIES, REQUIRED: LTTR 22 ENCL 20

c OPERATING DATA REPORT DOCKET NO.

DATF March 15, 1989 COMPLETED BY g~ Robert E. Dodge TFLFPHONF 315-524-4446 x-396 OPERATING STATUS Ginna Station I ~ Unit Name: R.E. 6!NNA NUCLEAR POWER PLANT Notes The reactor power level

2. Reporting Period: Febru, 1989 was maintained at 100% for
3. Licensed Thermal Power (MWt): 1520 the majority of the report
4. Nameplate Rating (Gross MWe): period with some exceptions
5. Design Electrical Rating (Nct hlWe):

470 detailed on page 3 and 4 of

6. Maximum Dependable Capacity (Gross MWe): the report.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct MWc):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 672 1,416 168,840
12. Number of Hours Reactor Was Critical 672 1 404.37 133 101.98 13 ~ Reactor Reserve Shutdown Hours 0 0 1 687.55*
14. Hours Gcncrator On-Line 672 1 395 130 666.88
15. Unit Rcservc Shutdown Hours 0 0 8.5*
16. Gross Thermal Energy Generated (hlV/H) 2, 068, 371 184,038,785
17. Gross Electrical Energy Generated (MV/H) 341,325 700,995 60,500,324
18. Nct Flectrical Energy Generated (hlWH) 324,877 666,972 57,411,430
19. Unit Service Factor 100% 98.52% 77.398
20. Unit Availability Factor 100% 98.52% 77.40%
21. Unit Capacity Factor (Using MDC Net) 73.755
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 1.48% 6.33%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refueling and Maintenance Shutdown - March 17, 1989. 45-55 days

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COhlMFRCIAL OPERATION "Cumnulative total conmencing January 1, 1975 Atv. aSS 8903210455 890228 49 88 PDR ADOCK 05000244 R PDC

OPERATING DATA REPORT DOCKET NO. 50 244 Mar h 15, 1989'OMPLETED BY REVISED Robert E. Dod e TELFPHONE 315-524-4446 x-396 OPERhTING SThTUS Gonna State.on l Unic Name:

~ R.E. GINNA NUCLEAR POWER PLANT Notes 2 Rcporcing Period: January, 8 The reactor power level

3. Licensed Thermal Power (MWt): was maintained at 100%
4. Nameplacc Racing (Gross MWe): for the majority of the
5. Design Electrical Racing (Net MWe):

470 report period with some

6. Maximum Dependable Capacity (Gross MWe):

490 exceptions detailed on

7. Maximum Dependable Capacity (Net MWe):

page 3 and 4 of the repor

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcpocc, Give Reasons: ~
9. Power Level to Which Restricted, lf hny (Net MWc):

IO. Reasons For Restrictions, lf hny:

This Month Yr:to-Date Cumulacive ll. Hours In Reporting Period 744 168,168 l2. Number of Hours Reactor Was Critical 732 37~ 732.37 132,429.98 l3. Reactor Reserve Shutdown Hours 1,687.55

14. Ilours Gcncrator On-Linc 723 129,994.88
15. Unit Rcservc Shutdown Hours 8 5*

l6. Gross Thermal Energy Generaced (MWH) 1,061',710~* ',061,710 "* 183,032,124**

l7. Gross Electrical Energy Generated (MWH) 359,670 60,158,999

18. Ncc Fleccrical Fnergy Gencratcd (MWH) 342,095 342, 095 57,086,553 l 9. Unit Service Factor 97.18% 97.18% 77.30%
20. Unit hvailubilicy Factor 97.18% 97.18% 77.31%
21. Unit Capacicy Factor (Using MDC Nec) 97.83% 97.83% 73 63**
22. Unit Capacicy Faccor (Using DER Net) 97.83% 73 63**

23 Unit Forced Outage Rate 2.82% 6.36%

24. Shutdowns Scheduled Over Nexc 6 Months (Type, Dace and Duration of Each):

Annual Refuelin and Maintenance Shutdown March 17, 1989 45 - 55 da s

25. If Shuc Down hc End Of Report. Period, Escimatcd Date of Scartup:
26. Units ln Test Status (Prior co Commercial Operation): Forecasc Achieved INITIhL CRITIChLITY INITlhL ELECTRICITY COMMFRCIh L OPF RhTION
  • Cummulative total commencing January 1, 1975 htv <is is ts
    • Corrected previously submitted figure that was in error

~

lf 'f lp) 7

't J

I, j

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 15 1989 COMPLETED BY Qr Robert E. Dodge TELEPHONE 1 3 15 524-4446 Ext. 396 at Ginna MONTH Februar 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 2 3

~

~

489 485 485 17 18 19.

'88

~ 489 489 489 20. 489

'90 4 ~

5~ 489 21 ~ 490

6. 412 22 7 ~ 418 490 23.

24 '89

'89 490'

'90

~

490 25

'89 9 ~

10 26. 489 489 27 12 ~ 489 '28. 489

13. 488 29 490 30.

'4.

15. 490 31.
16. 491 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.. Compute to the nearest whole megawatt.

l)OCKET NO. ~0 244 UNITNAMI:. R.E. GINNA NUCLEAR POWER PLANK UNIT SHUTDOWN AND POWER REDUCTIONS DAT COhiP LE1'ED I3Y MMY, 1989

+r Robert . ge REPORT hiONTH F 1.I.LI:PiiONI: 315-524-4446 x-396 Ginna Station Ho. Date c

0 Pl C

0 Sou0 E o licensee Event Ew 0 0

0

' Couse 8a Corrective 0 0 0 > cc Q Action to

~

0 0 0 O~ nc 0EO C Report 41 Vl Q O

Prevent Recurrence 0

O 89-2 2/6/89 36 INSTRU Reactor power level reduced to approximately 70$ because of turbine runback from E-H and Ground.

1 F: Forced Reason: hiethod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance or Test 2-hianual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

Training & License Examination

'-Operator F-Administrative G-Operational Error (Explain)

Rtv. 4/89 4949 H-Other (Explain) Exhibit I - Same Source

NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 5 198 COMPLETED BY p~ Robert E. Dodge TELEPHONE 1 315 524-4446 EXT. 396 at Ginna MONTH Februar 1989 The unit operated at 100% reactor power level for the majority of the report period, with a few exceptions as follows:

On 2/6/89 the reactor power level was reduced to 704 because of turbine runback from E-H and ground. The reactor power level was restored to 1004 on 2/7/89.

On 2/13/89 the reactor power level was reduced to 984 to perform Periodic Tests of the Auxiliary Feedwater System.

On 2/13/89 the reactor power level was reduced to 994 to perform Periodic Tests of the Standby Auxiliary Feedwater System Flow Check.

e GINNA STATION MAINTENANCE REPORT

SUMMARY

FEBRUARY g 1 989 During the month of February, routine maintenance and inspections were completed. Major safety related work included:

a ~ lA Spent Fuel Pit Recirc Pump minor maintenance and coupling repair I

b. g2 SPING Monitor P.M. Inspection c ~ Snubber Inspection per M-40

~ ~

N(W

< zzs /irzziirzz ba1 ~ OetA1C A HO

'rrzgy iz(zzzz

/////tu /////II/57 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TCLEPHONE ARcA cooe isa 546.2700 GINNA STATION March 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for February, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1989.

Very truly yours, Robert C. Mec ed General Production Manager'uclear RCM/eeh Attachments cc: Mr. William T. Russell NRC (1)