ML20137S311: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =
| stage = Other
}}
}}



Latest revision as of 09:16, 13 December 2021

Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S311
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8602180024
Download: ML20137S311 (2)


Text

- - _ ___ __ __-_

FE0111966 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please ncte that the training section will no longer be cumulative. Other changes are detailed in

! Enclosure 2. Enclosure 3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses recei ed 'after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking Syst 2m will be modified to reflect these changes, and submittals using j the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Mi}ler, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-548, Washington, DC 2055S.

A mee' ting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notific' of the details of this nieeting at a later date.

If you have any questions regarding these changes, please call our office.

1 l

~

ORIGINAL SIGNED BY LUIS A. REYES  !

I B602180024 860211 Luis A. Reyes, Chief PDR ADOCK 05000266 j v PDR Operations Branch l

l

Enclosures:

As stated See Attached Distribution i

RIII RIII RII Q

Roxworthy/mab cM ll en eye 02/11/86 g (,

9

=

~ MN J

'a 7 i-q;

/

' Wisconsin Electric Power Company 2 pt y 2 y Distribution cc w/ enclosures:

R. Bruno, Training Department cc w/o enclosures:

J. J. Zach, Plant Manager DCS/RSB (RIDS).

Licensing Fee. Management Branch

' Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wiscrisin Public Service Comission I

_ _ - - - - - - -