System Energy Resources, Inc. Docket No. 50-416 I Grand Gulf License No. NPF 29 l i During the Nuclear Regulatory Commission (NRC) inspection conducted on I 1988 ! | |||
! August 20 - September In accordance with the 23,"Gener,al Statement of Policy and Procedure for NR ; | |||
Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below: | |||
, Technical Specification (TS) 6.8.1.a requires that procedures shall be : | |||
established,i lesented and maintained covering the applicable procedures ! | |||
: recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i Februa 1978. Protec- ! | |||
tive T ing System inistrative Procedure states for 01-5 06-1, /superinten tha shift supervisor Revision 21, dent to ! | |||
, evalua the tagging, out of breakera and determine the effect on plart i operation by all affected components. > | |||
;i i Contary to the above, the licensee failed to follow Ahinistrative ; | |||
Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I affect on other equipment and plant operation. This resulted in a loss of . | |||
! instrument air inside containment and a reactor scram on September 5, ! | |||
! 1988. ! | |||
i I This is a Severity Level IV violation (SupplementI), ! | |||
i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc. is I | |||
! hereby required to submit a written statement or explanation to the Nucle,ar ! | |||
: Regulatory Commission ATTN: Document Control Desk i j with a copy to the Re,flional Administrator Region If, Washington, DC 20555and a co! | |||
Resident Jnspector wit tin 30 days of the date of the letter transmitting this l Notice. This reply should be clearly marked as a "Reply to a Notice of l 1 | |||
Violation" and should include (for each violation): (1)admissionordenialof | |||
; the violation, (2) the reason for the violation if admitted, (3) the corrective i | |||
! steps which have been taken and the results at.hieved, (4) the corrective steps l | |||
! which will be taken to avoid further violations, and (5) the date when full l l compliance will be achieved. Where good cause is shown, consideration will be ! | |||
given to extending the response time. If an adequate reply is not received l l within the time specified in this Notice, an order may be issued to show cause i j why the Ifcense should not be modified suspended, or revokec8 or why such other i | |||
; actionasmaybepropershouldnotbef,aken, j FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l | |||
ReactorProjectsiranch1 - | |||
:; DivisionofReactorProjects f i | |||
l Dated at Atlanta Georgia ; | |||
j this 6th day of October 1988 ; | |||
SS10210484 881006 DR ADOCKO'500g6 | |||
,}} | |||
Revision as of 20:54, 30 December 2020
| ML20204E981 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/06/1988 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20204E979 | List: |
| References | |
| 50-416-88-19, NUDOCS 8810210484 | |
| Download: ML20204E981 (1) | |
Text
. - _ _ - _ _ _ _ _ _ _ _ _ . _ _
1 o
f ..
ENCLOSURE 1 ;
System Energy Resources, Inc. Docket No. 50-416 I Grand Gulf License No. NPF 29 l i During the Nuclear Regulatory Commission (NRC) inspection conducted on I 1988 !
! August 20 - September In accordance with the 23,"Gener,al Statement of Policy and Procedure for NR ;
Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:
, Technical Specification (TS) 6.8.1.a requires that procedures shall be :
established,i lesented and maintained covering the applicable procedures !
- recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i Februa 1978. Protec- !
tive T ing System inistrative Procedure states for 01-5 06-1, /superinten tha shift supervisor Revision 21, dent to !
, evalua the tagging, out of breakera and determine the effect on plart i operation by all affected components. >
- i i Contary to the above, the licensee failed to follow Ahinistrative ;
Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I affect on other equipment and plant operation. This resulted in a loss of .
! instrument air inside containment and a reactor scram on September 5, !
! 1988. !
i I This is a Severity Level IV violation (SupplementI), !
i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc. is I
! hereby required to submit a written statement or explanation to the Nucle,ar !
- Regulatory Commission ATTN: Document Control Desk i j with a copy to the Re,flional Administrator Region If, Washington, DC 20555and a co!
Resident Jnspector wit tin 30 days of the date of the letter transmitting this l Notice. This reply should be clearly marked as a "Reply to a Notice of l 1
Violation" and should include (for each violation): (1)admissionordenialof
- the violation, (2) the reason for the violation if admitted, (3) the corrective i
! steps which have been taken and the results at.hieved, (4) the corrective steps l
! which will be taken to avoid further violations, and (5) the date when full l l compliance will be achieved. Where good cause is shown, consideration will be !
given to extending the response time. If an adequate reply is not received l l within the time specified in this Notice, an order may be issued to show cause i j why the Ifcense should not be modified suspended, or revokec8 or why such other i
- actionasmaybepropershouldnotbef,aken, j FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l
ReactorProjectsiranch1 -
- DivisionofReactorProjects f i
l Dated at Atlanta Georgia ;
j this 6th day of October 1988 ;
SS10210484 881006 DR ADOCKO'500g6
,