ENCLOSURE 1                                    ;
l NOTICE OF VIOLATION l
System Energy Resources, Inc.                                        Docket No. 50-416  I Grand Gulf                                                          License No. NPF 29 l                                                                                                                        i During the Nuclear Regulatory Commission (NRC) inspection conducted on                  I 1988                                                    !
!                                August    20 - September In accordance        with the      23,"Gener,al Statement of Policy and Procedure for NR ;
Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:
,                                      Technical Specification (TS) 6.8.1.a requires that procedures shall be            :
established,i        lesented and maintained covering the applicable procedures    !
:                                      recocaended              ndix "A" of Regulatory Guide 1.33 Revision 2, dated      i Februa        1978.                                                        Protec- !
tive T        ing System inistrative Procedure states for            01-5 06-1, /superinten tha shift supervisor  Revision 21, dent to !
,                                    evalua        the tagging, out of breakera and determine the effect on plart      i operation by all affected components.                                              >
;i i                                    Contary to the above, the licensee failed to follow Ahinistrative                  ;
Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any          I affect on other equipment and plant operation. This resulted in a loss of          .
!                                      instrument air inside containment and a reactor scram on September 5,              !
!                                    1988.                                                                              !
i                                                                                                                        I This is a Severity Level IV violation (SupplementI),                                !
i                              Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc.              is I
!                              hereby required to submit a written statement or explanation to the Nucle,ar              !
:                              Regulatory Commission          ATTN:  Document Control Desk                              i j                              with a copy to the Re,flional Administrator Region If, Washington, DC 20555and a co!
Resident Jnspector wit tin 30 days of the date of the letter transmitting this            l Notice. This reply should be clearly marked as a "Reply to a Notice of                    l 1
Violation" and should include (for each violation): (1)admissionordenialof
;                              the violation, (2) the reason for the violation if admitted, (3) the corrective          i
!                              steps which have been taken and the results at.hieved, (4) the corrective steps          l
!                              which will be taken to avoid further violations, and (5) the date when full              l l                              compliance will be achieved. Where good cause is shown, consideration will be            !
given to extending the response time. If an adequate reply is not received                l l                              within the time specified in this Notice, an order may be issued to show cause            i j                              why the Ifcense should not be modified suspended, or revokec8 or why such other          i
;                              actionasmaybepropershouldnotbef,aken,                                                    j FOR THE NUCL    REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l
ReactorProjectsiranch1                        -
:;                                                                          DivisionofReactorProjects                    f i
l                              Dated at Atlanta Georgia                                                                  ;
j                              this 6th day of October 1988                                                              ;
SS10210484 881006 DR        ADOCKO'500g6
,}}

Latest revision as of 21:54, 30 December 2020

Notice of Violation from Insp on 880820-0923.Violation Noted:Failure to Follow Administrative Procedure 01-5-06-1 to Evaluate Whether Opening Breaker Had Any Effect on Other Equipment & Plant Operation
ML20204E981
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/06/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20204E979 List:
References
50-416-88-19, NUDOCS 8810210484
Download: ML20204E981 (1)


Text

. - _ _ - _ _ _ _ _ _ _ _ _ . _ _

1 o

f ..

ENCLOSURE 1  ;

l NOTICE OF VIOLATION l

System Energy Resources, Inc. Docket No. 50-416 I Grand Gulf License No. NPF 29 l i During the Nuclear Regulatory Commission (NRC) inspection conducted on I 1988  !

! August 20 - September In accordance with the 23,"Gener,al Statement of Policy and Procedure for NR ;

Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

, Technical Specification (TS) 6.8.1.a requires that procedures shall be  :

established,i lesented and maintained covering the applicable procedures  !

recocaended ndix "A" of Regulatory Guide 1.33 Revision 2, dated i Februa 1978. Protec- !

tive T ing System inistrative Procedure states for 01-5 06-1, /superinten tha shift supervisor Revision 21, dent to !

, evalua the tagging, out of breakera and determine the effect on plart i operation by all affected components. >

i i Contary to the above, the licensee failed to follow Ahinistrative  ;

Procedure 01-5-06-1 to evaluate whether opening breaker 52-1P3113 had any I affect on other equipment and plant operation. This resulted in a loss of .

! instrument air inside containment and a reactor scram on September 5,  !

! 1988.  !

i I This is a Severity Level IV violation (SupplementI),  !

i Pursuant to the provisions of 10 CFR 2.201, System Energy Resources, Inc. is I

! hereby required to submit a written statement or explanation to the Nucle,ar  !

Regulatory Commission ATTN: Document Control Desk i j with a copy to the Re,flional Administrator Region If, Washington, DC 20555and a co!

Resident Jnspector wit tin 30 days of the date of the letter transmitting this l Notice. This reply should be clearly marked as a "Reply to a Notice of l 1

Violation" and should include (for each violation): (1)admissionordenialof

the violation, (2) the reason for the violation if admitted, (3) the corrective i

! steps which have been taken and the results at.hieved, (4) the corrective steps l

! which will be taken to avoid further violations, and (5) the date when full l l compliance will be achieved. Where good cause is shown, consideration will be  !

given to extending the response time. If an adequate reply is not received l l within the time specified in this Notice, an order may be issued to show cause i j why the Ifcense should not be modified suspended, or revokec8 or why such other i

actionasmaybepropershouldnotbef,aken, j FOR THE NUCL REGULATORY COMIS$10N AC Da id N. Vefrelli Chief l

ReactorProjectsiranch1 -

DivisionofReactorProjects f i

l Dated at Atlanta Georgia  ;

j this 6th day of October 1988  ;

SS10210484 881006 DR ADOCKO'500g6

,