ML20205B233: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,
Georgia Power Company flouta 2, Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114
  ' Southem Company Services, Inc.
Post Office Box 2625 -
Birmingham. Alabama 35202 Telephone 2 5 870-6011 Vogtle Proj.ect August 30, 1985                                                                            1 Director of Nuclear _ Reactor Regulation                                  File: X3BL01 Attention: i Ms. Elinor G.~ Adensas, Chief                                Log:  GN-693 Licensing Branch l4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 1: EQUIPMENT QUALIFICATION
 
==Dear Mr. Denton:==
 
As required by Standard Review Plan 3.10 (paragraph III.2), we are submitting the enclosed draf t Seismic Qualification Report (SQR) for your review. The SQR is a Master List of Vogtle asfety-related equipment by systems. It also provides a qualification summary and status as well as installation status.
The report indicates that the Vogtle qualification program is approximately 85% complete and installation (nounting) is approximately 70% complete of which 25% is ready for sevice.
Two copies of the SQR are being submitted directly to your consultant in preparation for a pre-audit meeting.
If your staff requires any additional information, please do not hesitate to call me.
Sincerely ,
(    . i
! J. A. Bailey Project Licensing Manager I
Enclosure JAE/JMM/sm l xc:          D. O. Foster                J. E. Joiner, Esquire i              M. A. Miller (3)            B. W. ' Churchill, Esquire
!              R. A. Thomas.                B. Jones, Esquire (w/o encl.)          qf G. Bockhold, Jr.            T. Johnson (w/o encl.)
L. T. Gucwa                  C. D. Teper (w/o encl.)            i g gj
* L. Fowler                    Clarke Kido (1)
Jag Singh (1)                Vogtle Project File
!              B5091i0078 850830 PDR      ADOCK 05000424 00244_ E                            PDR L}}

Latest revision as of 07:42, 30 December 2020

Forwards Draft Vols 1 & 2 of Seismic Qualification of Safety-Related Equipment, Per SER Open Item 1.Rept Indicates That Qualification Program Approx 85% Complete, Installation Approx 70% & 25% of Sys Ready for Svc
ML20205B233
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/30/1985
From: Bailey J
GEORGIA POWER CO.
To: Adensam E, Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20205B235 List:
References
GN-693, NUDOCS 8509110078
Download: ML20205B233 (1)


Text

,

Georgia Power Company flouta 2, Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114

' Southem Company Services, Inc.

Post Office Box 2625 -

Birmingham. Alabama 35202 Telephone 2 5 870-6011 Vogtle Proj.ect August 30, 1985 1 Director of Nuclear _ Reactor Regulation File: X3BL01 Attention: i Ms. Elinor G.~ Adensas, Chief Log: GN-693 Licensing Branch l4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 1: EQUIPMENT QUALIFICATION

Dear Mr. Denton:

As required by Standard Review Plan 3.10 (paragraph III.2), we are submitting the enclosed draf t Seismic Qualification Report (SQR) for your review. The SQR is a Master List of Vogtle asfety-related equipment by systems. It also provides a qualification summary and status as well as installation status.

The report indicates that the Vogtle qualification program is approximately 85% complete and installation (nounting) is approximately 70% complete of which 25% is ready for sevice.

Two copies of the SQR are being submitted directly to your consultant in preparation for a pre-audit meeting.

If your staff requires any additional information, please do not hesitate to call me.

Sincerely ,

( . i

! J. A. Bailey Project Licensing Manager I

Enclosure JAE/JMM/sm l xc: D. O. Foster J. E. Joiner, Esquire i M. A. Miller (3) B. W. ' Churchill, Esquire

! R. A. Thomas. B. Jones, Esquire (w/o encl.) qf G. Bockhold, Jr. T. Johnson (w/o encl.)

L. T. Gucwa C. D. Teper (w/o encl.) i g gj

  • L. Fowler Clarke Kido (1)

Jag Singh (1) Vogtle Project File

! B5091i0078 850830 PDR ADOCK 05000424 00244_ E PDR L