ML20155F368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:-.
                                                                                bm0
.
                                        APR 15 1386
  Docket No. 50-266
  Docket No. 50-301
  Wisconsin Electric Power Company
  ATTN: Mr. C. W. Fay
            Vice President
            Nuclear Power Department
  231 West Michigan, Room 308
  Milwaukee, WI 53201
  Gentlemen:
  This refers to the routine safety inspection conducted by Messrs. R. L. Hague
  and R. J. Leemon of this office from February 1,1986 through March 31, 1986,
  of activities at Point Beach Nuclear Plant, Unit 1 and 2, authorized by NRC
  Operating Licenses'No. DPR-24 and No. DPR-27 and to the discussion of our
  findings with J. J. Zach at the conclusion of the inspection.
  The enclosed copy of our inspection report identifies areas examined during
  the inspection. Within these areas, the inspection consisted of a selective
  examination of procedures and representative records, observations, and
  interviews with personnel.
  No violations of NRC requirements were identified during the course of this
  inspection.
  In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
  this letter and the enclosed inspection report will be placed in the NRC
  Public Document Room.
  We will gladly discuss any questions you have concerning this inspection.
                                            Sincerely,
                                            CRIGINAL Fili FD 27 W. G. GULDEMOND
                                            W. G. Guldemond, Chief
                                            Projects Branch 2
  Enclosure: Inspection Reports
      No. 50-266/86003(DRP);
      No. 50-301/86003(DRP)
  See Attached Distribution
  RIII
          ''
                    rig
          []        Gt  mond
              8604220031 860415
              PDR    ADOCK 05000266
 
n
    .
  .
        Wisconsin Electric Power Company 2
        Distribution
        cc w/ enclosure:
        J. J. Zach, Plant Manager
        DCS/RSB (RIDS)
        Licensing Fee Management Branch
        Resident Inspector, RIII
        John J. Duffy, Chief
            Boiler Section
        Ness Flores, Chairperson
            Wisconsin Public Service
          ' Commission
        .
      C+
}}
}}

Latest revision as of 15:14, 17 December 2020

Forwards Safety Insp Repts 50-266/86-03 & 50-301/86-03 on 860201-0331.No Violation Noted
ML20155F368
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/15/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Foy C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20155F371 List:
References
NUDOCS 8604220031
Download: ML20155F368 (2)


See also: IR 05000266/1986003

Text

-.

bm0

.

APR 15 1386

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. L. Hague

and R. J. Leemon of this office from February 1,1986 through March 31, 1986,

of activities at Point Beach Nuclear Plant, Unit 1 and 2, authorized by NRC

Operating Licenses'No. DPR-24 and No. DPR-27 and to the discussion of our

findings with J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

CRIGINAL Fili FD 27 W. G. GULDEMOND

W. G. Guldemond, Chief

Projects Branch 2

Enclosure: Inspection Reports

No. 50-266/86003(DRP);

No. 50-301/86003(DRP)

See Attached Distribution

RIII

rig

[] Gt mond

8604220031 860415

PDR ADOCK 05000266

n

.

.

Wisconsin Electric Power Company 2

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

' Commission

.

C+