ML20154A539: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000285/1988012]]
{{Adams
| number = ML20154A539
| issue date = 08/31/1988
| title = Ack Receipt of 880725 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/88-12. Understands That Training Dept Will Verify Attendance at Required Training at End of Each Rotation
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Morris K
| addressee affiliation = OMAHA PUBLIC POWER DISTRICT
| docket = 05000285
| license number =
| contact person =
| document report number = NUDOCS 8809130003
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000285/1988012]]
 
=Text=
{{#Wiki_filter:-
                    s                                    ,                                          ;
                  4                                                                                  j
          **                                                              *
    .. ,        ,,
        '
                                                            As 3 i EIB                                t
            In Reply Refer To:                                                                      i
            Docket:    50-285/88-12                                                                t
                                                                                                      l
.
                                                                                                      t
i
            Omaha Public Power District
            ATTN:      Kenneth J. Morris, Division Manager
                      Nuclear Operations                                                            i
              1623 Harney Street                                                                      [
,
            Omaha, Nebraska 68102                                                                    ;
i                                                                                                    !
i          Gentlemen:                                                                              j
'
                      Thank you for your letter of July 25, 1988, in response to our letter and
1                                                                                                    :
            Notice of Violation dated June 23, 1988.        We have reviewed your reply and your    .
'
                                                                                                      l
            updated training administrative procedure. We find the corrective actions                [
!            responsive to the concerns raised in our Notice of Violation.      From                l
                                                                                                      :
            discussions with Messrs. J. Fluehr, Supervisor Operations and Technical Training        l
)            and J. Tesarek, Nuclear Training Engineer on August 9, 1988, we understand
j            that the training department will verify attendance at required training at
u
;
            the end of each rotation. We will review the implementation of your corrective          (
!
i            actions during a future inspection to determine that full compliance has been            (
i                                                                                                    ,
l            achieved and will be maintained,                                                        t
;
,i                                                                                                    :
                                                          Sincerely,                                  j
!
                                                            Original Signed By,                      j
l                                                            A.B. BEACH                              [
t
'                                                                                                    !
                                                          L. J. Callan, Director                      ;
l                                                        Division of Reactor Projects
)                                                                                                    [
                                                                                                      I
            cc:
I            Fort Calhoun Station                                                                    f
            ATTN: W. G. Gates, Manager
                                                                                                      t
                                                                                                      i
,
              P.O. Box 399                                                                            $
!            Fort Calhoun, Nebraska 68023
1                                              /
                                                                                                      !
                          C:0P kk          0      80 C:RPSB            0:
              R
              G3;tek      JEGid1Ardo      JLii %oan IFWesterman        LJCTha[n                      i
!            1 /A /88 </old              f /#/88 4/M/88                3/q/e8                      l
                                                                                                      f
!
i
                                                                                              gD{    ;
;
  !              M8"R888R
                O
                                8888h
                                    PDC
                                                                                                      ,
                                                                                                      }
<
                                                                                                  _-U
 
                                                                          ___ _____ __
                                                                                          l
                                                                                          1
        e
  *- .    g
                                                                                          !
          Omaha Public Powei District        -2-
          Harry H. Voigt, Esq.                                                            ,
          LeBoeuf, lemb, Leiby & MacRae
          1333 New Hampshire Avenue, hW                                                  '
        Washingt0n, D. C.    20036
          Nebraska Radiation Control Program Director
"
          bec to DMB (IE01)                                                              i
          bec distrib. by RIV:
          R.D. Martin, aA
                        s                  RPB-DRSS
                                                                                        *
          SectionChief(DRP/B)              MIS System
          RIV File                          DRP                                          i
          RSTS Operator                    Project Engineer, DRP/B
        Lisa Shea, RM/ALF                  P. Milano, NRR Project Manager
          DRS                              RRI
:        J. E. Gaglie',do                  G. Pick
j
                                                                                        i
!
,
l
!
                                                                                        L
                                                                                        '
,
                                                                                        >
                                                                                        :
                                                                                        i
                                                                                        ,
1
a                                                                                      !
I
                                                                                        i
l
                                                                                        l
1
                                                                                        P
}}

Revision as of 03:05, 15 November 2020

Ack Receipt of 880725 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/88-12. Understands That Training Dept Will Verify Attendance at Required Training at End of Each Rotation
ML20154A539
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8809130003
Download: ML20154A539 (2)


See also: IR 05000285/1988012

Text

-

s ,  ;

4 j

    • *

.. , ,,

'

As 3 i EIB t

In Reply Refer To: i

Docket: 50-285/88-12 t

l

.

t

i

Omaha Public Power District

ATTN: Kenneth J. Morris, Division Manager

Nuclear Operations i

1623 Harney Street [

,

Omaha, Nebraska 68102  ;

i  !

i Gentlemen: j

'

Thank you for your letter of July 25, 1988, in response to our letter and

1  :

Notice of Violation dated June 23, 1988. We have reviewed your reply and your .

'

l

updated training administrative procedure. We find the corrective actions [

! responsive to the concerns raised in our Notice of Violation. From l

discussions with Messrs. J. Fluehr, Supervisor Operations and Technical Training l

) and J. Tesarek, Nuclear Training Engineer on August 9, 1988, we understand

j that the training department will verify attendance at required training at

u

the end of each rotation. We will review the implementation of your corrective (

!

i actions during a future inspection to determine that full compliance has been (

i ,

l achieved and will be maintained, t

,i  :

Sincerely, j

!

Original Signed By, j

l A.B. BEACH [

t

'  !

L. J. Callan, Director  ;

l Division of Reactor Projects

) [

I

cc:

I Fort Calhoun Station f

ATTN: W. G. Gates, Manager

t

i

,

P.O. Box 399 $

! Fort Calhoun, Nebraska 68023

1 /

!

C:0P kk 0 80 C:RPSB 0:

R

G3;tek JEGid1Ardo JLii %oan IFWesterman LJCTha[n i

! 1 /A /88 </old f /#/88 4/M/88 3/q/e8 l

f

!

i

gD{  ;

! M8"R888R

O

8888h

PDC

,

}

<

_-U

___ _____ __

l

1

e

  • - . g

!

Omaha Public Powei District -2-

Harry H. Voigt, Esq. ,

LeBoeuf, lemb, Leiby & MacRae

1333 New Hampshire Avenue, hW '

Washingt0n, D. C. 20036

Nebraska Radiation Control Program Director

"

bec to DMB (IE01) i

bec distrib. by RIV:

R.D. Martin, aA

s RPB-DRSS

SectionChief(DRP/B) MIS System

RIV File DRP i

RSTS Operator Project Engineer, DRP/B

Lisa Shea, RM/ALF P. Milano, NRR Project Manager

DRS RRI

J. E. Gaglie',do G. Pick

j

i

!

,

l

!

L

'

,

>

i

,

1

a  !

I

i

l

l

1

P