{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONS'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS), ACCESSION NBR:9001050011 DOC.DATE: 89/12/28 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
 
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION LIEBERMAN,J.
 
Ofc of Enforcement
'(Post 870413)SUBJECT: Confirms 891222 telcon re authorization to extend response time for EA 89-130.DISTRIBUTION CODE'E14D COPIES RECEIVED'LTR L ENCL Q SIZE'ITLE:
Enforcement Action Non-2.790-Licensee Response NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: AEOD/DOA DEDRO RR/DREP/NUDOCS-ABSTRACT'E FILE 01 RGN5 FILE 03 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1'1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DSP/TPAB NRR/DOEA/OEAB11 NRR/PMAS/ILRB12 E F~02.GN2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS; PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL- WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George$Vashington N'ay~Richland, 1Vashington 99352 December 28, 1989 Docket No.50-397 G02-89-233 Mr.James, Lieberman Director, Office of Enforcement U.S.Nuclear Regulatory Commission Attn: Document Control Desk l(ashington, DC 20555 Subject: EXTENSION OF RESPONSE TIME FOR EA 89-130 Reference:
Letter, J.B.Martin to G;C.Sorensen, EA 89-130 (NRC Inspection Report Nos~50-397/89-21, 50-397/89-22, and 50-397/89-28), dated December 21, 1989.
 
==Dear Mr.Lieberman:==
This is, to confirm your conversation with Supply System counsel on December 22, 1989, in which you authorized an extension of the Supply System's response to EA 89-130 until February 20, 1990.Me appreciate your prompt assi stance in this matter.Very truly yours, P.C.Sorensen, Manage (MD 280)Regulatory Programs GCS/tmd cc: fir.Mr.Mr.Mr.Mr.C.J.Bosted, Resident NRC Inspector (901A)C.Eschels, EFSEC B.H.Faulkenberry, NRC RV N.S.Reynolds, BCP&R R.B.Samworth, NRC~OC>10500II PLtf>>ADOCK 05000397 PL~C lo
}}
}}

Latest revision as of 00:52, 17 May 2019

Confirms 891222 Telcon Re Authorization to Extend Response Time for Enforcement Action EA-89-130 Until 900220,per Insp Repts 50-397/89-21,50-397/89-22 & 50-397/89-28
ML17285A922
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/28/1989
From: SORENSEN G C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: LIEBERMAN J
NRC OFFICE OF ENFORCEMENT (OE), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
EA-89-130, GO2-89-233, NUDOCS 9001050011
Download: ML17285A922 (2)


Text

ACCELERATED DISTRIBUTION DEMONS'TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS), ACCESSION NBR:9001050011 DOC.DATE: 89/12/28 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION LIEBERMAN,J.

Ofc of Enforcement

'(Post 870413)SUBJECT: Confirms 891222 telcon re authorization to extend response time for EA 89-130.DISTRIBUTION CODE'E14D COPIES RECEIVED'LTR L ENCL Q SIZE'ITLE:

Enforcement Action Non-2.790-Licensee Response NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: AEOD/DOA DEDRO RR/DREP/NUDOCS-ABSTRACT'E FILE 01 RGN5 FILE 03 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1'1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DSP/TPAB NRR/DOEA/OEAB11 NRR/PMAS/ILRB12 E F~02.GN2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS; PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL- WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George$Vashington N'ay~Richland, 1Vashington 99352 December 28, 1989 Docket No.50-397 G02-89-233 Mr.James, Lieberman Director, Office of Enforcement U.S.Nuclear Regulatory Commission Attn: Document Control Desk l(ashington, DC 20555 Subject: EXTENSION OF RESPONSE TIME FOR EA 89-130 Reference:

Letter, J.B.Martin to G;C.Sorensen, EA 89-130 (NRC Inspection Report Nos~50-397/89-21, 50-397/89-22, and 50-397/89-28), dated December 21, 1989.

Dear Mr.Lieberman:

This is, to confirm your conversation with Supply System counsel on December 22, 1989, in which you authorized an extension of the Supply System's response to EA 89-130 until February 20, 1990.Me appreciate your prompt assi stance in this matter.Very truly yours, P.C.Sorensen, Manage (MD 280)Regulatory Programs GCS/tmd cc: fir.Mr.Mr.Mr.Mr.C.J.Bosted, Resident NRC Inspector (901A)C.Eschels, EFSEC B.H.Faulkenberry, NRC RV N.S.Reynolds, BCP&R R.B.Samworth, NRC~OC>10500II PLtf>>ADOCK 05000397 PL~C lo