ML17285B286

From kanterella
Jump to navigation Jump to search
Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991
ML17285B286
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/22/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-094, GO2-90-94, NUDOCS 9005300131
Download: ML17285B286 (3)


Text

~ACCELERATED D TRJBUTION DEMONS TlON SYSTEM

'4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005300131 DOC.DATE: 90/05/22 NOTARIZED: NO DOCKET 477 FACIL:50-397 WPPSS Nuclear Project, Unit, 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that submittal of ITS scheduled for Mar 1991 6 implementation tenatively scheduled for Oct 1991.

DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR g ENCL ~ SIZE:

TITLE: OR Submittal: General Distribution NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD SAMWORTH,R INTERNAL: ACRS NRR/DET/ECMB 9H NRR/DOEA/OTSBll NRR/DST 8E2 NRR/DST/SELB 8D NRR/DST/SICB 7E NRR/DST/SRXB 8E NUDOCS-ABSTRACT OC FJ()!B OGC/HDS2 G FILE 0 RES/DSIR/EIB EXTERNAL: LPDR 1 NRC PDR NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (B)CL 2C079) TO ELIMINATEYOUR NAME FROM DISI'R(BUT(ON LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Hay 22, 1990 G02-90-094 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 SCHEDULE FOR IMPLEMENTING THE IMPROVED TECHNICAL SPECIFICATION (ITS) PROGRAM

Reference:

Letter, G02-89-223, GC Sorensen (SS) to NRC, same subject dated December 14, 1989 The reference letter informed the Staff that the Supply System had commenced a plant specific effort to develop an Improved Technical Specification (ITS) for WNP-2 based on standards developed by the Boiling Water Reactor Owners Group and the NRC Interim Policy Statement on Technical Specification Improvements.

Tentative submittal was scheduled for September 1990. Subsequent review of Industry/NRC review schedules on the lead plant ITS submittals has caused a revision of this schedule such that the WNP-2 ITS submittal is now scheduled for March 1991 with implementation tentatively scheduled for October 1991.

Very truly yours, G. C. $ rensen, Hanager Regulatory Programs PLP/bk cc: JB Hartin - NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A D Hoffman - EXCEL 9O05300iSi 900522 05000397 ()