MONTHYEARIR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20220062023-03-0101 March 2023 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) ML23019A2482023-01-19019 January 2023 Inservice Inspection Request for Information ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22230C7392022-08-23023 August 2022 2022 Mid-Cycle Planning Letter IR 05000397/20210062022-03-0202 March 2022 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2021006) ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21230A3892021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21111A0282021-04-21021 April 2021 _ Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2021011) and Request for Information ML21104A3032021-04-0808 April 2021 Inspection Report 05000397/2021010, Information Request Biennial Problem Identification and Resolution Inspection ML21082A3042021-03-23023 March 2021 Request for Information: Columbia Generating Station, Dated March 11, 2021, Inspection Report 05000397/2021-002, Occupational Radiation Safety Inspection-1,2,3,PI IR 05000397/20200062021-03-0303 March 2021 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2020006) ML20353A1822020-12-18018 December 2020 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000397/2021001) and Request for Information IR 05000397/20200052020-09-0101 September 2020 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2020005) IR 05000397/20190062020-03-0303 March 2020 CGS2019006 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2019006) ML20049H2622020-02-18018 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000397/2020401) and Request for Information ML19266A5922019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000397/2019004) and Request for Information IR 05000397/20190052019-08-30030 August 2019 Updated Inspection Plan for Columbia Generating Station, Report 05000397/2019005 ML19100A4242019-04-10010 April 2019 Columba - Notification of NRC Design Bases Assurance Inspection Report (Teams) (05000397/2019011) and Initial Request for Information IR 05000397/20180062019-03-0404 March 2019 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2018006 ML18313A0942018-11-0808 November 2018 Notification of NRC Triennial Heat Sink Performance Inspection Report 05000397/2018004) and Request for Information IR 05000397/20180052018-08-31031 August 2018 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2018005) IR 05000397/20170062018-03-0101 March 2018 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2017006) IR 05000397/20170052017-08-28028 August 2017 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2017005) IR 05000397/20160062017-03-0101 March 2017 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2016006) ML16256A2682016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) ML16251A1342016-09-0707 September 2016 Notification of Inspection (NRC Integrated Inspection Report 05000397/2016004) and Request for Information ML16239A2412016-08-31031 August 2016 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) IR 05000397/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2016401) IR 05000397/20150062016-03-0202 March 2016 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2015006) ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information IR 05000397/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2015401) IR 05000397/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2015005) IR 05000397/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2014402) IR 05000397/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2014006) ML14219A7512014-08-0707 August 2014 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information IR 05000397/20130012014-03-0404 March 2014 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2013001) IR 05000397/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter Columbia Generating Station (Report 05000397-13-006) IR 05000397/20128012013-03-0404 March 2013 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012801) IR 05000397/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2012006) IR 05000397/20120012012-03-0505 March 2012 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012001) ML1124306472011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station ML1112907052011-05-0606 May 2011 Notification of Inspection (IR 05000397-11-004) and Request for Information ML1024403712010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station IR 05000397/20100012010-03-0303 March 2010 Annual Assessment Letter - Columbia Generating Station (Report 05000397-10-001) 2024-08-22
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2012001)
Dear Mr. Reddemann:
On February 14, 2012, the NRC completed its end-of-cycle performance review of Columbia Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs)
in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Columbia Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Columbia Generating Station during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC identifies substantive cross-cutting issues (SCCIs) to communicate a concern with the licensees performance in a cross-cutting area and to encourage the licensee to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme in the work practices component of the human performance cross-cutting area.
Specifically, four green findings were identified in the work practices component of the human performance cross-cutting area associated with failure to implement human error prevention techniques H.4(a). The NRC noted that previous and current improvement initiatives to address human performance issues have not been fully successful. Therefore, the NRC determined that an SCCI exists in this cross-cutting area. We plan to inspect your efforts to address this issue and request you provide us a letter informing us of your readiness for inspection of your corrective actions in this theme. The SCCI will remain open until we determine through our inspection that your corrective actions have been effective and the station has demonstrated sustained and measurable improvement. We will perform baseline inspections in this theme after you notify us in writing of your readiness for inspection. The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Wayne C. Walker Chief, Reactor Projects Branch A Division of Reactor Projects Docket No. 05000397 License No. NPF-21 Enclosure: Columbia Generating Station Inspection/Activity Plan cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Thomas.Blount@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Resident Inspector (Mahdi.Hayes@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)
Project Engineer (Jason.Dykert@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
CGS Administrative Assistant (Crystal.Myers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lisa.Quayle@nrc.gov)
DRA Secretary (Anita.Tannenbaum@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Geoff.Miller@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
OEDO RIV Coordinator, (Lydia.Chang@nrc.gov)
Director, DIRS, NRR (Fred.Brown@nrc.gov)
Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
NRR Project Manager (Balwant.Singal@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)
File located: R:\_Reactors\CGS EOC Letter 2011.doc SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy
/RA/ T.Blount for /RA/
2/28/2012 2/28/2012 2/29/2012
Page 1 of 1 Columbia Generating Stati 02/27/2012 14:28:11 Inspection / Activity Plan Report 22 04/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-177 - 2515/TI-177: ECCS GAS ACCUMULATION 2 2 05/07/2012 05/10/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System RS13 - RADIATION SAFETY 2 2 05/21/2012 05/25/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 05/21/2012 05/25/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 05/21/2012 05/25/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 2 05/21/2012 05/25/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 2 06/11/2012 06/15/2012 IP 7111105T Fire Protection [Triennial]
2 06/25/2012 06/29/2012 IP 7111105T Fire Protection [Triennial]
RS24 - RADIATION SAFETY 2 2 08/13/2012 08/17/2012 IP 2515/185 Follow-up on the Industry's Ground Water Protection Initiative 2 08/13/2012 08/17/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 08/13/2012 08/17/2012 IP 71124.04 Occupational Dose Assessment EP-1 - BIENNIAL EP EXERCISE 3 2 08/27/2012 08/31/2012 IP 7111401 Exercise Evaluation 2 08/27/2012 08/31/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 08/27/2012 08/31/2012 IP 71151-EP01 Drill/Exercise Performance 2 08/27/2012 08/31/2012 IP 71151-EP02 ERO Drill Participation 2 08/27/2012 08/31/2012 IP 71151-EP03 Alert & Notification System BRQ - BRQ INSPECTION 2 2 11/26/2012 11/30/2012 IP 7111111B Licensed Operator Requalification Program EB1-07T - TRIENNIAL HEAT SINK INSPECTION 1 2 03/25/2013 03/29/2013 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.