Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01
ML17285B086
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Partlow J
Office of Nuclear Reactor Regulation
References
GL-90-01, GL-90-1, GO2-90-033, GO2-90-33, NUDOCS 9003160125
Download: ML17285B086 (14)


Text

ACCELERATED D REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003160125 DOC.DATE: 90/03/01 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION PARTLOW,J.G. Associate Director for Projects (Post 870411)

SUBJECT:

Forwards compilation of responses to regulatory impact -'

survey questionnaire,per GL 90-01.

D DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: "

TITLE: OR Submittal: General Distribution S NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD5 LA 1 1 PD5 PD 1 1 SAMWORTH,R ~,5 5 D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1' '

NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS2 0 M&iE 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

D NOTE TO ALL "RIDS" RECIPIENTS:

F

,S PLEASE HELP US TO REDUCE WASIH CONTACT THE, DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 "

I ',]Ii

(

t 0 S

,V C

P 1I J

l

ii WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 1, 1990 Docket No. 50-397 G02-90-033 Nr. James G. Partlow Associate Director of Projects Office of Nuclear Reactor Regulations U.S. Nuclear Regulatory Commission

'washington, DC 20555

Subject:

NUCLEAR PROJECT NO. 2 RESPONSE TO NRC REGULATORY IMPACT SURVEY Enclosed is a compilation of MNP-2 responses to the Regulatory Impact Survey questionnaire transmitted in Generic Letter 90-01, dated January 18, 1990.

Me have included responses to the various types of operational inspections, audits, and evaluations and trust that our input will provide insight into the time spent by individuals on NRC regulatory programs and initiatives.

G. C. Sorensen, Manager Regulatory Programs (MD-280)

LDN/tmd Enclosures

,oI

'.,9003ibOi25 90030i

. PDR -. ADDCK 05000397 P PDC

IRC Re ulator lm act Serve

1. of inspection, audit or evaluation: NRC TEAM INSPECTIONS--

Type SSFI, SSOMI, ETC.

2. Based on actual experience over the past several years, about how often is this activity conducted'?

1 TO 2 PER YEAR

3. Operations/ areas covered:

OPERATIONS, COVERING VARIOUS PLANT SYSTEMS'ND OUTAGE MODIFICATION.

4. Extent of'the activity (how many people, for how long) 4 TO 15 NRC INSPECTORS FOR 2 TO 4 WEEKS
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item <1.
a. Plant Department Heads 8% (number involved) 7
b. Plant Manager lt C. Corporate Department Heads (number,involved)
d. Corp'orate Vice Presidents (number involved)
e. Chief Nuclear Officer

0 RC Re ulator Im act Surve

1. Type of inspection, audit or evaluatio'n: NRC INSPECTIONS--

RESIDENT, REGIONAL, AND HEADQUARTERS

2. Based on actual experience over the past several years, about how often is this activity conducted?

HEAD UARTERS--2 TO 3 TINES PER YEAR

3. Dp u /C~

ALL ASPECTS OF PLANT OPERATIONS.

4. Extent of the activity (how many people, for how long)

DAILY FOR RESIDENT, 1 TO 2 INSPECTORS FOR A WEEK FOR REGIONAL INSPECTIONS, 1 TO 2 INSPECTORS FOR 3 TO 4 DAYS FOR HEADQUARTERS.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item ~1.
a. Plant Department Heads 10K (number involved) 7
b. Plant Manager g<

C. Corporate Department Heads 1> (number involved)

d. Corporate Yice Presidents (number involved)
e. Chief Nuclear Officer

Type RC Re a'ulator Im of inspection, audit or evaluation:

act Surve INPO EVALUATIONS

2. Based on actual experience over the past several years, about how often is this activity conducted?

3 TIMES PER YEAR

3. tip i /C~

PLANT OPERATIONS, CORPORATE SUPPORT, d:

TRAINING

4. Extent of the activity (how many people, for how long) 4 PEOPLE FOR 1 WEEK PER VISIT
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item ~l.
a. Plant Department Heads BX (number involved) 6
b. Plant Manager c~ Corporate Department Heads (number involved)
d. Corporate Yice Presidents (number involved)
e. Chief Nuclear Officer

~ ~

ulster act Serve QIRC Re s'="" '" '

Im

1. Type of inspection, audit or evaluatio'n: INSURERS (ANI)

ASME CODE REQUIRED AUDITS

2. Based on actual experience over the past several years, about how often is this activity conducted?

2 PER YEAR

3. Operations/ d:

ASME CODE COMPLIANCE

4. Extent of the activity (how many people, for how long)

ONE PERSON PER EACH 3 DAY VISIT

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item ~1.
a. Plant Department Heads I< (number involved)
b. Plant Manager
c. Corporate Department Heads 'number involved)
d. Corp'orate Yice Presidents (number involved)
e. Chief Nuclear Officer

~ y 0 ~ ~

1. Type QRC COMPLIANCE INSPECTIONS Re u """'"

ulator lm of'nspection, audit or evaluation:

act Serve STATE OF WASHINGTON--

often

2. Based on actual experience over the past several years, about how is this activity conducted?

QUARTERLY

~ NPDES DISCHARGE PERMITS SITE

3. Operations/Construction areas covered:

CERTIFICATION AGREEMENT..CONDITIONS, RCRA"HAZARDOUS WASTE STORAGE 5 HANDLING (INCLUDING MIXED-WASTE), OFFSITE RADIOLOGICAL iMONITORING, ENVIRONMENTAL (NON-RAD)

MONITORING PROGRAMS.

4. Extent of the activity (how many people, for how long) 2 TO 4 INSPECTORS FOR ONE DAY FOUR TIMES A YEAR.
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item ~1.
a. Plant Department Heads SS (number involved) 2
b. Plant Manager l<
c. Corporate Department Heads (number involved)
d. Corporate Yice Presidents (number involved)
e. Chief Nuclear Officer

~ ~ ~

QRC Re ulator lm act Surya

1. Type of inspection, audit or evaluation: NRC REQUIRED A AUDITS
2. Based on actual experience over the past several years, about how often is this activity conducted?

1 5 TIMES P E R YEAR

3. Operations/ d:
4. Extent of the activity (how many people, for how long)

EACH AUDIT-- 2 TO 3 AUDITORS FOR 1 1/2 WEEKS.

5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item >1.
a. Plant Department Heads (number involved)
b. Plant Nanager C. Corporate Department Heads (number involved)
d. Corporate Vice Presidents (number involved)
e. Chief Nuclear Officer
f. gA Department Head 80K

~ ~

p OIRC Re ulator lm act Serve r

r r OTHER SELF-ASSESSMENTS--

INTERNAL PROGRAM REVIEWS/AUDITS

2. Based on actual experience over the past several years, about how often is this activity conducted?

3 Op ti /~

CONTINUOUS ONGOING A'CTI VITY d: ERA MANAGEMENT OVERSIGHT, ENGINEERING ASSESSMENTS,, QC INSPECTIONS, REGULATORY COMPLIANCE

4. Extent of the activity (how many people, for how long) 62 PEOPLE PER YEAR
5. Approximate percentage of total time (on an annual basis) which the following managers must spend in direct involvement before, during, and in response to the activity described in Item <l.
a. Plant Department Heads lDX (number involved) 7
b. Plant Manager 4"
c. Corporate Department Heads (number inyolved)
d. Corp'orate Vice Presidents (number involved)
e. Chi ef Nucl ear Offi cer 2X