ACCELERATED DIS>RIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9009070015 DOC. DATE: 90/08/27 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards fitness-for-duty program performance data for I 900103-0630.

DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 ENG,P.L. 1 1 D INTERNAL: ACRS 1 1 NRR/DRIS/RSGB 1 1 D NUDOCS-ABSTRACT 1 1 RGN5 . 02 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

/

0 4

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 August 27, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

NUCLEAR PLANT NO. 2 PERFORMANCE DATA REPORT - JANUARY 3-JUNE 30r 1990

Reference:

10CFR26.71(d), Fitness for Duty Programs Recordkeeping Requirements Gentlemen:

Enclosed is the Supply System'.s Performance Data Personnel Subject to CFR26 Report for the period January 3-June 30, 1990 as required by 10CFR26.71(d).

Questions regarding the information in this report should be directed to E. B. (Burns) Mixon, Project Human Resources Manager, at (509) 377-2276.

ccrc Very truly yours, G. C. Sorensen, Manager (MD 280)

Regulatory Programs GCS/djc Enclosure Mr. C. J. Bosted, NRC Resident Inspector Mr. J. B. Martin, NRC-Region V Mr. R. Pate, NRC-Region V Mr. N. S. Reynolds, BCPGR Mr. D. L. Williams, BPA (MD 399) 90 0827 00397 qooO>> 0015 ocx <+o poc pgP.

l/y

P~ -p O

- 'i (

t~ e ."s 0

FITNESS FOR DUTY PROGRAM Performance Data Personnel Subject to CFR 26

'WASHINGTON PUBLIC POWER SUPPLY SYSTEM June 30 1990 COMPANY 6 MONTHS ENDING 3000 Geor e Washin ton Wa Richland ltA 99352 LOCATION E. B. Nixon I'/Iana er Pro ect Human Resources 509 3 -22 6 CONTACT NAME PHONE (INCLUDE AREA CODE)

CUTOFFS: SCREEN/CONRRMATION (ng/ml) IXXI APPENDIX A TO 10CFR 26 MARIJUANA 100/ 15 AMPHETAMINES 1QQQ/ 500 COCAINE 300/ 150 PHENCYCLIDINE 25/ 25 OPIATES 300/ 300 ALCOHOL (% BAC)

LONG-TERM SHORT-TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH UNESCORTED

'ACCESS 1688 *

¹ ¹

¹ ¹ REFERRED ACCESS ¹ ¹ ¹ ¹ CATEGORIES TESTED POSITIVE TO EAP RESTORED TESTED POSITIVE TESTED POSITIVE PRE-EMPLOYMENT 651 363 , 6 PRE-BADGING 22 PERIODIC FOR CAUSE POST ACCIDENT RANDOM 783 104 47 FOLLOW-UP Blind OTHER Samples 149 25 TOTAL 1317 27 224 704

  • Includes Long Term/Short Term Contr actor Personnel 6/7IF69

RANDOM TESTING PROGRAM RESULTS INDIVIDUALS TESTED 1989 1990 1991 1992 1993

¹ POSITIVE

¹ NEGATIVE 782 150

% POSITIVE 0.0013 0.0067%

GRAPH OF

% POSITIVE CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES MARIJUANA COCAINE OPIATES AMPHETAMINES PHENCYCLIDINE ALCOHOL 6/7/89