ML17286A280

From kanterella
Jump to navigation Jump to search
Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d)
ML17286A280
Person / Time
Site: Columbia 
Issue date: 08/27/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009070015
Download: ML17286A280 (6)


Text

ACCELERATED DIS>RIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9009070015 DOC. DATE: 90/08/27 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000397

SUBJECT:

Forwards fitness-for-duty program performance data for I

900103-0630.

DISTRIBUTION CODE:

A021D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7 NOTES:

RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.

COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 PD5 PD 1

1 COPIES LTTR ENCL 1

1 D

INTERNAL: ACRS NUDOCS-ABSTRACT RGN5 02 1

1 1

1 1

1 NRR/DRIS/RSGB 1

1 D

EXTERNAL: NRC PDR 1

1 NSIC 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

/

0 4

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 August 27, 1990 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

Reference:

Gentlemen:

NUCLEAR PLANT NO.

2 PERFORMANCE DATA REPORT - JANUARY 3-JUNE 30r 1990 10CFR26.71(d),

Fitness for Duty Programs Recordkeeping Requirements Enclosed is the Supply System'.s Performance Data Personnel Subject to CFR26 Report for the period January 3-June 30, 1990 as required by 10CFR26.71(d).

Questions regarding the information in this report should be directed to E. B.

(Burns) Mixon, Project Human Resources

Manager, at (509) 377-2276.

Very truly yours, G.

C. Sorensen, Manager (MD 280)

Regulatory Programs GCS/djc Enclosure ccrc Mr. C.

Mr. J.

Mr. R.

Mr. N.

Mr. D.

J. Bosted, NRC Resident Inspector B. Martin, NRC-Region V

Pate, NRC-Region V

S. Reynolds, BCPGR L. Williams, BPA (MD 399) 0827 qooO>>

ocx <+o poc 0015 90 00397 pgP.

l/y

P~ -p O

- 'i (

t~

e."s 0

FITNESS FOR DUTY PROGRAM Performance Data Personnel Subject to CFR 26

'WASHINGTON PUBLIC POWER SUPPLY SYSTEM COMPANY 3000 Geor e Washin ton Wa Richland ltA 99352 LOCATION E.

B. Nixon I'/Iana er Pro ect Human Resources CONTACT NAME June 30 1990 6 MONTHS ENDING 509 3

-22 6

PHONE (INCLUDEAREA CODE)

CUTOFFS: SCREEN/CONRRMATION (ng/ml)

IXXI APPENDIX A TO 10CFR 26 MARIJUANA 100/

15 AMPHETAMINES 1QQQ/ 500 COCAINE OPIATES 300/ 150 PHENCYCLIDINE 300/ 300 ALCOHOL (% BAC) 25/

25 TESTING RESULTS LICENSEE EMPLOYEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL AVERAGE NUMBER WITH UNESCORTED

'ACCESS CATEGORIES 1688 *

¹ TESTED

¹ POSITIVE

¹ REFERRED TO EAP

¹ ACCESS

¹ RESTORED TESTED

¹ POSITIVE

¹ TESTED

¹ POSITIVE PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE 363 22 651

, 6 POST ACCIDENT RANDOM FOLLOW-UP Blind OTHER Samples TOTAL 783 149 25 1317 27 104 224 47 704

  • Includes Long Term/Short Term Contr actor Personnel 6/7IF69

RANDOMTESTING PROGRAM RESULTS INDIVIDUALS TESTED

¹ POSITIVE 1989 1990 1991 1992 1993

¹ NEGATIVE

% POSITIVE GRAPH OF

% POSITIVE 782 150 0.0013 0.0067%

CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES MARIJUANA COCAINE OPIATES AMPHETAMINES PHENCYCLIDINE ALCOHOL 6/7/89