Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
ML17285B232
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1990
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-080, GO2-90-80, NUDOCS 9005020002
Download: ML17285B232 (3)


Text

. ACCELERATOR) DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)

ESSION NBR:9005020002 DOC.DATE: 90/04/25 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BOUCHEY,G.D. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

SUBJECT:

Provides addi response to violations noted in Insp Repts 50-397/89-06 & 50-397/89-17.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL ACRS 2 AEOD AEOD/DEXIB 1 AEOD/TPAD DEDRO 1 NRR SHANKMAN,S NRR/DLPQ/LPEB10 1 NRR/DOEA DIR 11 NRR/DREP/PEPB9 D 1 NRR/DRIS/DIR NRR/DST/DIR 8E2 1 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 1 OE D OGC/HDS2 1 ~RE G FI RES/DSR/HFB/HFS .1 !TW'RC RNAL: LPDR 1 PDR NSIC 1 NOIR TO ALL "RIDS" RECIPIEKIS:

P~ HELP US TO REDUCE WASIZl CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 25, 1990 G02-90-080 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.

Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, LICENSE NO. NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION

Reference:

1) Letter, G02-89-202, GD Bouchey (SS) to NRC nNRC Inspection Reports 89-06 and 89-13", dated October 31, 1989
2) 'Letter, G02-89-147, GD Bouchey (SS) to NRC "NRC Inspec'tion Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs) 89-06 and 89-17. The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.

In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required. In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990. Although the changes to Plant Procedure (PPM) 1.3.7, "Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990. Accordingly, it is now anticipated that the procedure will be implemented by August 1, 1990.