Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990
ML17285B117
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/19/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-056, GO2-90-56, NUDOCS 9003280068
Download: ML17285B117 (5)


Text

I t

ACCELERATED DISTjUBUTION DEMONSTIRATION SYSIKM t

REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

~ ~

ACCESSXON NBR: 9003280068 DOC. DATE: 90/03/19 NOTARIZED: NO DOCKET ~Ã FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397, AUTH. NAME AUTHOR AFFXLIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control. Desk)

SUBJECT:

Followsup util 900102 ltr re implementation of fitness-for-NOTES'IZE:duty program.

DISTRIBUTION CODE: IE15D TITLE: Fitness for RECXPIENT COPIES RECEIVED:LTR Duty Inspection Report COPIES ENCL RECXPXENT COPIES S

ID CODE/NAME LTTR E CL ID CODE/NAME LTTR E CL , A PD5 LA 1 PD5 PD 1 SAMWORTH,R 1 'D INTERNAL: RR~Ry'D REG FILE 01

~~S-ABSTRACT RGN5 02

'D EXTERNAL: LPDR NRC PDR NSIC R

- 'D

/

Al D

NOTE TO ALL "RIDS" RECIPIENTS:

S PLEASE HELP US TO REDUCE WASTEI CONTACT THE. DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL'

C'8 g 8 E

r'$

.1

%a

,xJ I

II

's f 3c

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 March 19, 1990 Docket No. 50-397 G02 056 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 llashington, DC 20555 Gentlemen:

Subject:

FITNESS FOR DUTY PROGRAM IMPLEMENTATION STATUS

Reference:

Letter, G. C. Sorensen to NRC Document Control Desk, Certification of Implementation of Fitness for Duty Program, dated January 2, 1990.

The referenced letter identified certain areas of the Supply System's Fitness for Duty Program Implementation Plan which were not complete as of January 3, 1990, and committed to complete those areas by the end of January 1990.

As of this date, all items identified as incomplete on January 3, 1990, have been completed. Those items for which corrective actions were required were identified as a result of a Supply System assessment of the FFD Program in December 1989. Although not all identified deficiencies were corrected by January 31, 1990 (the last issues were completed 3/9/90),

implementation was in accordance with the specified rule.

The deficiencies identified in the 1989 assessment related to documentation and were discussed with members of the NRC staff in a meeting on January 19, 1990. Observation of the actual practice demonstrated that the program was accomplishing ,its objectives of providing reasonable assurance that Supply System and contractor personnel associated with 'l<NP-2 are reliable, trustworthy, and not under the influence, of any substance, legal or illegal, or mentally impaired from any cause which in any way adversely affects their ability to safely and competently perform their duties.

900328006S 9003i9 PDR ADOCK 05000397 P ., = PDC

.U.S. Nuclear Regulatory Commission Page 2 March 19, 1990 FITNESS FOR DUTY PROGRAM IMPLEMENTATION STATUS Should you have any questions, please contact Mr. C. M. Hanson at (509) 377-2276.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs (MD 280)

GCS/tlr cc: Mr. C. Bosted, Resident NRC Inspector (901A)

Mr. J. B. Martin, Region V NRC Mr. R. J. Pate, Region V NRC Mr. H. S. Reynolds, Bishop, Cook, Purcell 8 Reynolds Mr. R. 8 Same~orth, NRC

~

Mr. D. L. Williams, BPA (399)

0 p 1