ML17285B343

From kanterella
Jump to navigation Jump to search
Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601
ML17285B343
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/18/1990
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-106, NUDOCS 9006260524
Download: ML17285B343 (3)


Text

P REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9006260524 DOC.DATE: 90/06/18 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises of appointment of AL Oxsen to position of Deputy Managing Director, effective 900601.

DISTRIBUTION CODE: MOOSD COPIES RECEIVED:LTR Q ENCL 0 SIZE:

TITLE: Changes of Personnel/Address NOTES RECIPIENT COPIES . RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDS LA PD5 PD SAMWORTH, R INTERNAL: ACRS AS LAP ASLBP IRM STEVENSON g L IRM TECH ADV OC OGC/HDS2 "RE FILE 01 SECY/DSB EXTERNAL: LPDR NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 June 18, 1990 Docket No. 50-397 G02-90-106 U. S. Nuclear Regulatory Commission Document Control Desk Nail Station Pl-137 Washington, DC 20555 Gentlemen:

The purpose of this letter is to advise. you that effective June 1, 1990, Nr. A. Lee Oxsen has been appointed to the position of Deputy Managing Director at Washington Public Power Supply System. In this position, Nr.

Oxsen replaces Mr. J.

h W. Shannon who will retire effective July 27, 1990.

For tHe past three years, Nr. Oxsen has been the Assistant Managing Director for Operations responsible for all aspects of operations and operational support for WNP-2. Prior to joining the Supply System he was Vice President of Nuclear Operations at the Boston Edison Company and spent more than 25 years with the General Electric Company. Nr. Oxsen will continue as the Acting Assistant Managing Director for Operations until a replacement is named. At such time, we will advise you of his replacement in this capacity.

Very truly yours, G. C. orensen, Manager Regulatory Programs (ND 280)

GCS/tlr cc: Mr ~ C. J. Bosted, NRC (901A)

Nr. J. B. Martin, RV NRC Nr. T. E. Murley, NRC Mr. R. B. Samworth, NRC 9pp618 PDR ADOCK 05ppp397 pDC H

v~