ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9006290221 DOC.DATE: 90/06/20 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILXATXON SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards WPPSS-FTS-129, "BWR Transient Analysis Model."
DISTRIBUTION CODE'001D COPIES RECEIVED'LTR ENCL
~
SIZE: a2 ~~+
TITLE: OR Submittal:
General Distribution NOTES:
RECIPXENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC B
G F LE 01 EXTERNAL: L NSXC COPXES LTTR ENCL 1
1 5
5 6
6 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 27 ENCL '5
ti
~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 June 20; 1990 G02-90-109 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 NOTIFICATION OF REQUEST FOR NRC REVIEW OF TOPICAL REPORT WPPSS-FTS-129, "BWR TRANSIENT ANALYSIS MODEL"
Reference:
Letter dated March 29,
- 1990, from G.
C. Sorensen (Supply System) to NRC, Nuclear Plant No. 2, Operating License NPF-21 Notification of Request for NRC Review of Topical Report WPPSS-FTS-127, "Qualification of Core Physics Methods for BWR Design and Analysis".
Letter, No. G02-90-061 The Supply System requests the Nuclear Regulatory Commission's review and approval of Topical Report WPPSS-FTS-129, Rev.
0, "BWR Transient Analysis Model".
This report contains the description and qualification of a
BWR transient analysis model based on RETRAN-02 computer code.
The Supply System intends to use this model for core reload analysis and plant operational support.
As mentioned in the referenced letter, the Supply System's reload methodology is described in a series of three reports:
1)
"Qualification of Core Physics methods for BWR Design and Analysis" (submitted on March 29, 1990) 2)
"BWR Transient Analysis" (submitted by this letter) 3)
"Applications of Steady State and Transient Analysis to Reload Licensing Evaluation" (to be submitted in January 1991)
Page Two NOTIFICATION OF RE/VEST FOR NRC REVIEW OF TOPICAL REPORT WPPSS-FTS-129 The models and methods described in these topicals are intended to be used to design and analyze the WNP-2, Cycle 8 reload scheduled to begin operation in June of 1992.
If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, G.
C.
S rensen
- Manager, Regulatory Programs YYY:dw
Enclosure:
BWR Transient Analysis Model (18 copies) cc:
JB Martin -
NRC RV NS Reynolds - BCP8R RB Samworth -
NRC DL Williams - BPA/399 NRC Site Inspector - 901A
~