February 1, 1999 | |||
a. | |||
, | |||
I | |||
: | |||
: | |||
. | |||
4- | |||
~ | |||
' | |||
Mr. G. Rainey, President | |||
' | |||
PECO Nuclear | |||
j. Nuclear Group Headquarters | |||
a | |||
Correspondence Control Desk | |||
P. O. Box 195 | |||
l Wayne, PA' 19087-0195 | |||
i | |||
* | |||
SUBJECT: NRC ENGINEERING TEAM INSPECTION 50-277/98-09 AND 50-278/98-09 | |||
4 | |||
AND NOTICE OF VIOLATION | |||
i | |||
j Dear Mr. Rainey: | |||
: | |||
j This letter refers to the engineering team inspection conducted November 16 through | |||
i December 4,1998, at the Peach Bottom Atomic Power Station. The inspection evaluated the | |||
i effectiveness of the engineering organization in supporting safe operation of your facility. The | |||
' | |||
inspection focused on the reactor core isolation cooling and 4kV electrical distribution systems' | |||
l operation under normal and emergency operation conditions. The inspection also addressed ; | |||
I the performance of engineering in . support of the operations and maintenance functions, with l | |||
' | |||
. | |||
emphasis on problem identification and corrective action implementation, and plant safety | |||
< | |||
evaluations. The enclosed report provides the results of the inspection. The preliminary -i | |||
> | |||
findings and conclusions were presented to Mr. Doering and others of your staff on j | |||
! December 11,1998. ! | |||
j. :! | |||
; | |||
j The team concluded that PECO provided effective engineering support to the station. In-depth | |||
review of the reactor core isolation cooling (RCIC) and_4Kv electrical distribution systems | |||
i determined that both systems were operable and capable of performing their design basis | |||
j functions and that the analyses and procedures supporting these systems were generally ; | |||
j' accurate. Also, based on several areas reviewed, the team concluded that plant problems are ! | |||
. being identified, root causes determined, corrective actions taken, and results monitored in a '; | |||
generally effective manner. : | |||
! | |||
Based on the results of this inspection, the NRC has determined that a violation of NRC l | |||
- requirements occurred. The violation is cited in the enclosed Notice of Violation, and the | |||
circumstances surrounding it are described in detail in the subject inspection. The team found ) | |||
two examples in which RCIC system design basis information was not properly translated into / | |||
procedures. | |||
100053 | |||
The NRC has concluded that information regarding the reason for the violation, the corrective | |||
fqol : | |||
' | |||
' | |||
actions taken and planned to correct the violation and prevent recurrence is already adequately - | |||
' | |||
addressed on the docket in inspection Report No. 50-277/98-09, 50-278/98-09 dated | |||
- January 29,1999. Therefore, you are not required to respond to this letter unless the | |||
description therein does not accurately reflect your corrective actions or your position. In that - | |||
case, or if you choose to provide additional information, you should follow the instructions | |||
specified in the enclosed Notice. | |||
9902090250 990201 | |||
PDR ADOCK 05000277 | |||
G PDR | |||
- | |||
! | |||
- .. . . - -- | |||
. . . . _ - | |||
. _ _ __ .__ . _ _ . _ _ _ . - _ _ _ . _ - _ . _ _ _ - - _ - . _ _ _ _ _ | |||
!. , | |||
. l | |||
. | |||
G. Rainey 2 | |||
l - We appreciate your cooperation. | |||
l | |||
Sincerely, | |||
- | |||
i | |||
Wayne D. Lanning, Director | |||
Division of Reactor Safety | |||
Docket Nos.: 50-277,50-278 ; | |||
License Nos: NPF-39, NPF-85 i | |||
Enclosures: NRC Inspection Report 50-277/98-09,50-278/98-09 | |||
and Notice of Violation | |||
cc w/encls: | |||
J. Hagan, Vice President, Nuclear Station Support l | |||
J. Doering, Vice President, Peach Bottom Atomic Power Station l | |||
l | |||
M. Wamer, Plant Manager, Peach Bottom Atomic Power Station i | |||
' | |||
G. D. Edwards, Chairman, Nuclear Review Board | |||
R. Boyce, Director, Nuclear Quality Assurance i | |||
A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co. j | |||
G. J. Lengyel, Manager, Experience Assessment l | |||
J. W. Durham, Sr., Senior Vice President and General Counsel | |||
H. C. Kresge, Manager, Extemal Operations, Connectiv | |||
N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv | |||
R. McLean, Power Plant Siting, Nuclear Evaluations | |||
D. Levin, Acting Secretary of Harford County Council I | |||
' | |||
R. Ochs, Maryland Safe Energy Coalition | |||
J. H. Walter, Chief Engineer, Public Service Commission of Maryland | |||
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance ; | |||
Mr. & Mrs. Kip Adams j | |||
Commonwealth of Pennsylvania ! | |||
State of Maryland | |||
TMI - Alert (TMIA) | |||
! | |||
, | |||
! | |||
l | |||
._ _ _ _ _ _ _ . . . __ .._. . _ _ _ .. _ _ _ _ . _ . | |||
* * | |||
. | |||
. | |||
3 | |||
Distribution w/ encl: | |||
Region i Docket Room (with concurrences) | |||
Nuclear Safety information Center (NSIC) | |||
NRC Resident inspector | |||
PUBLIC | |||
H. Miller, RA/J. Wiggins, DRA (1) | |||
W. Lanning, DRS | |||
W. Ruland, DRS | |||
J. Yerokun, DRS | |||
A. Lohmeier, DRS | |||
C. Cowgill, DRP | |||
D. Florek, DRP | |||
S. Barr, DRP | |||
C. O'Daniell, DRP | |||
DRS File | |||
Distribution w/ encl: (Via E-Mail) | |||
G. Shear, OEDO | |||
W. Dean, PDI-2, NRR | |||
inspection Program Branch, NRR (IPAS) | |||
M. Thadani, NRR | |||
B. Buckley, NRR | |||
R. Correia, NRR | |||
DOCDESK | |||
l | |||
. | |||
DOCUMENT NAME: G:\CMMEB\LOHMEIER\ LIM 9809. INS | |||
To receive a copy of this document, indicate in the box: wit | |||
"C" = Copy,h%gf'opy | |||
attachment / enclosure "E" = Copy with attachment / enclosure ppf c | |||
OFFICE Rl/DRS Rl/DRS , | |||
, Rl/DRP fj Q Rl/DRS ,, g .. | |||
l NAME Alohnyeier A// GMeypr [,j, / CAnderson "" JWigginsLG /GR | |||
DATE 12/wf98 $ 01M/99 ~)l M/ 01/p(/99 //qy/7f | |||
' | |||
l | |||
\ OFFICIAL fCORD COPY | |||
L | |||
}} | }} |
Latest revision as of 08:49, 1 January 2021
ML20202J808 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 02/01/1999 |
From: | Lanning W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
Shared Package | |
ML20202J815 | List: |
References | |
50-277-98-09, 50-277-98-9, NUDOCS 9902090250 | |
Download: ML20202J808 (3) | |
See also: IR 05000277/1998009
Text
. - - - - .. - . - - . . - . - -
j, "
February 1, 1999
a.
,
I
.
4-
~
'
Mr. G. Rainey, President
'
PECO Nuclear
j. Nuclear Group Headquarters
a
Correspondence Control Desk
P. O. Box 195
l Wayne, PA' 19087-0195
i
SUBJECT: NRC ENGINEERING TEAM INSPECTION 50-277/98-09 AND 50-278/98-09
4
AND NOTICE OF VIOLATION
i
j Dear Mr. Rainey:
j This letter refers to the engineering team inspection conducted November 16 through
i December 4,1998, at the Peach Bottom Atomic Power Station. The inspection evaluated the
i effectiveness of the engineering organization in supporting safe operation of your facility. The
'
inspection focused on the reactor core isolation cooling and 4kV electrical distribution systems'
l operation under normal and emergency operation conditions. The inspection also addressed ;
I the performance of engineering in . support of the operations and maintenance functions, with l
'
.
emphasis on problem identification and corrective action implementation, and plant safety
<
evaluations. The enclosed report provides the results of the inspection. The preliminary -i
>
findings and conclusions were presented to Mr. Doering and others of your staff on j
! December 11,1998. !
j. :!
j The team concluded that PECO provided effective engineering support to the station. In-depth
review of the reactor core isolation cooling (RCIC) and_4Kv electrical distribution systems
i determined that both systems were operable and capable of performing their design basis
j functions and that the analyses and procedures supporting these systems were generally ;
j' accurate. Also, based on several areas reviewed, the team concluded that plant problems are !
. being identified, root causes determined, corrective actions taken, and results monitored in a ';
generally effective manner. :
!
Based on the results of this inspection, the NRC has determined that a violation of NRC l
- requirements occurred. The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding it are described in detail in the subject inspection. The team found )
two examples in which RCIC system design basis information was not properly translated into /
procedures.
100053
The NRC has concluded that information regarding the reason for the violation, the corrective
fqol :
'
'
actions taken and planned to correct the violation and prevent recurrence is already adequately -
'
addressed on the docket in inspection Report No. 50-277/98-09, 50-278/98-09 dated
- January 29,1999. Therefore, you are not required to respond to this letter unless the
description therein does not accurately reflect your corrective actions or your position. In that -
case, or if you choose to provide additional information, you should follow the instructions
specified in the enclosed Notice.
9902090250 990201
PDR ADOCK 05000277
G PDR
-
!
- .. . . - --
. . . . _ -
. _ _ __ .__ . _ _ . _ _ _ . - _ _ _ . _ - _ . _ _ _ - - _ - . _ _ _ _ _
!. ,
. l
.
G. Rainey 2
l - We appreciate your cooperation.
l
Sincerely,
-
i
Wayne D. Lanning, Director
Division of Reactor Safety
Docket Nos.: 50-277,50-278 ;
Enclosures: NRC Inspection Report 50-277/98-09,50-278/98-09
and Notice of Violation
cc w/encls:
J. Hagan, Vice President, Nuclear Station Support l
J. Doering, Vice President, Peach Bottom Atomic Power Station l
l
M. Wamer, Plant Manager, Peach Bottom Atomic Power Station i
'
G. D. Edwards, Chairman, Nuclear Review Board
R. Boyce, Director, Nuclear Quality Assurance i
A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co. j
G. J. Lengyel, Manager, Experience Assessment l
J. W. Durham, Sr., Senior Vice President and General Counsel
H. C. Kresge, Manager, Extemal Operations, Connectiv
N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Levin, Acting Secretary of Harford County Council I
'
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance ;
Mr. & Mrs. Kip Adams j
Commonwealth of Pennsylvania !
State of Maryland
TMI - Alert (TMIA)
!
,
!
l
._ _ _ _ _ _ _ . . . __ .._. . _ _ _ .. _ _ _ _ . _ .
- *
.
.
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
NRC Resident inspector
PUBLIC
H. Miller, RA/J. Wiggins, DRA (1)
W. Lanning, DRS
W. Ruland, DRS
J. Yerokun, DRS
A. Lohmeier, DRS
C. Cowgill, DRP
D. Florek, DRP
S. Barr, DRP
C. O'Daniell, DRP
DRS File
Distribution w/ encl: (Via E-Mail)
G. Shear, OEDO
W. Dean, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
DOCDESK
l
.
DOCUMENT NAME: G:\CMMEB\LOHMEIER\ LIM 9809. INS
To receive a copy of this document, indicate in the box: wit
"C" = Copy,h%gf'opy
attachment / enclosure "E" = Copy with attachment / enclosure ppf c