Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:M79254, TAC:M79255
| stage = Approval
}}
}}


Line 30: Line 32:
==SUBJECT:==
==SUBJECT:==
REQUEST FOR REllEF FROH INSERVICE INSPECTION REQUIREMENTS FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC N05. H79254 AND M79255)
REQUEST FOR REllEF FROH INSERVICE INSPECTION REQUIREMENTS FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC N05. H79254 AND M79255)
By letter dated November 15, 1990, Philadelphia Electric Company (PECo) provided a revised edition of the " Inservice Inspection (ISI) Program Second Ten Year Interval' for Peach Bottom Atomic Power Station, Units 2 and 3. In the letter, PECo submitted 17 relief requests for information or review and approval. Nine of the relief requests were new, six were revised and two were unchanged, in a letter dated March 19, 1992, the licensee withdrew relief request RR-07 and further revised five relief requests. By letter dated April 16, 1992, PEco provided an additional relief request revision.
By {{letter dated|date=November 15, 1990|text=letter dated November 15, 1990}}, Philadelphia Electric Company (PECo) provided a revised edition of the " Inservice Inspection (ISI) Program Second Ten Year Interval' for Peach Bottom Atomic Power Station, Units 2 and 3. In the letter, PECo submitted 17 relief requests for information or review and approval. Nine of the relief requests were new, six were revised and two were unchanged, in a {{letter dated|date=March 19, 1992|text=letter dated March 19, 1992}}, the licensee withdrew relief request RR-07 and further revised five relief requests. By {{letter dated|date=April 16, 1992|text=letter dated April 16, 1992}}, PEco provided an additional relief request revision.
The NRC staff (the staff) has completed its evaluation of the subject relief requests. The staff has concluded that, pursuant to 10 CFR 50.55a(g)(6)(1),
The NRC staff (the staff) has completed its evaluation of the subject relief requests. The staff has concluded that, pursuant to 10 CFR 50.55a(g)(6)(1),
certain requirements of the Code are impractical to )erform at Peach Bottom Atomic Power Station, Units 2 and 3, and relief may >e granted for the issues described in Requests for Relief Nos. RR-02, RR-03, RR-08, RR-11, RR-13, RR-15, RR-16 and RR-17 with the conditions stated in Section 2 of the enclosed safety evaluation. Relief remains granted for issues described in Requests for Relief Nos. RR-01, RR-04, RR-05, RR-06, RR-09, and RR-10. The staff determined that Request for Relief No. RR-14 was not required. Request for Relief No. RR-12 is denied for reasons described in the safety evaluation, s
certain requirements of the Code are impractical to )erform at Peach Bottom Atomic Power Station, Units 2 and 3, and relief may >e granted for the issues described in Requests for Relief Nos. RR-02, RR-03, RR-08, RR-11, RR-13, RR-15, RR-16 and RR-17 with the conditions stated in Section 2 of the enclosed safety evaluation. Relief remains granted for issues described in Requests for Relief Nos. RR-01, RR-04, RR-05, RR-06, RR-09, and RR-10. The staff determined that Request for Relief No. RR-14 was not required. Request for Relief No. RR-12 is denied for reasons described in the safety evaluation, s

Latest revision as of 11:15, 22 August 2022

Forwards SE Granting Relief from Inservice Insp Requirements for Facilities
ML20126H892
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/23/1992
From: Chris Miller
Office of Nuclear Reactor Regulation
To: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20126H897 List:
References
TAC-M79254, TAC-M79255, NUDOCS 9301050351
Download: ML20126H892 (4)


Text

- _ - _ _ - _ - _ _ - - _ _ _ _ - - _ _ _ - - _ _ _ - _ _ . _ _ - _ _ _ _ _

0

6. . g 4 + ym Riog\

3\ n UNITED STATES 3.l

.. i NUCLEAR REGULATORY COMMISSION I WASHINGTON. D C. 70%6

\- ....*

/ December 23, 1992 Docket Nos. 50-277 and 50-288 Mr. George J. Beck Manager-iicensing, MC 52A-5 Philadelphia Electric Company Nuclear Group Headquarters.

Correspondence Control Desk P.O. Box No. 195 Wayne, Pennsylvania 19007-0195

Dear Mr. Beck:

SUBJECT:

REQUEST FOR REllEF FROH INSERVICE INSPECTION REQUIREMENTS FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC N05. H79254 AND M79255)

By letter dated November 15, 1990, Philadelphia Electric Company (PECo) provided a revised edition of the " Inservice Inspection (ISI) Program Second Ten Year Interval' for Peach Bottom Atomic Power Station, Units 2 and 3. In the letter, PECo submitted 17 relief requests for information or review and approval. Nine of the relief requests were new, six were revised and two were unchanged, in a letter dated March 19, 1992, the licensee withdrew relief request RR-07 and further revised five relief requests. By letter dated April 16, 1992, PEco provided an additional relief request revision.

The NRC staff (the staff) has completed its evaluation of the subject relief requests. The staff has concluded that, pursuant to 10 CFR 50.55a(g)(6)(1),

certain requirements of the Code are impractical to )erform at Peach Bottom Atomic Power Station, Units 2 and 3, and relief may >e granted for the issues described in Requests for Relief Nos. RR-02, RR-03, RR-08, RR-11, RR-13, RR-15, RR-16 and RR-17 with the conditions stated in Section 2 of the enclosed safety evaluation. Relief remains granted for issues described in Requests for Relief Nos. RR-01, RR-04, RR-05, RR-06, RR-09, and RR-10. The staff determined that Request for Relief No. RR-14 was not required. Request for Relief No. RR-12 is denied for reasons described in the safety evaluation, s

u

. \b fl LL a . . ,, (

Q L) 9301050351 921223 DR ADOCK 0500 7 rhl

Mr. George J. Beck December 23, 1992 If you have any questions, do not nesttate to contact the Project Manager, Joseph W. Shea, at (301) 504-2426.

Sincerely,

/S/

Charles L. Miller, Director Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page D111R111UllE Docket file NRC & Local PDRs PDI-2 Reading THurley/FHiraglia JPartlow BGrimes JLieberman SVarga JCalvo Chiller JShea M0'Brien OGC JStrosnider JNorberg lHclellan ESullivan EJordan, 3701 Gill 11(8)

ACRS(10)

OPA OC/LfDCB VMcCree EWenzinger, RGN-1 BRuland, RGN-!

  • Previously Concurred 0FFICE ito!!satTA Pdi)2/PH OGC nr EHCB/BC* EMcB/BC* Pol-2/D NAME PkDf [e'n J5kektr5 f ld*i , JStrosnider JNorberg CHilk DATE 3/ s92 Q,/h92 l 7'/}$ /92 11/20/92 12/01/92 /7/73/92 OffICIALRL00RijCOPF DOCUMENT NAME: PB79254. GEN

s Mr. George J. Beck December 23, 1992 If you have any questions, do not hesitate to contact the Project Manager, Joseph W. Shea, at (301) 504-2426.

Sincerely, h( n $ QY Charles L. Hiller, Director Project Directorate 1-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page

Mr. George J. Beck Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Hr. Thomas H. Gerusky, D' rector Sr. V.P. & General Counsel Bureau of Radiation Protection Philadelahia Electric Company Pennsylvania Department of 2301 Har(et Street, S26-1 Environmental Resou'.ces Philadelphia, Pennsylvania 19101 P. O. Box 2063 Philadelphia Electric Company A11H: Mr. D. B. Hiller, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township Route 1 Box 208 R. D. #1 Delta Pennsylvania 17314 Delta, Pennsylvania 17314 Public Service Commission of Philadelphia Electric Company Maryland ATTN: Regulatory Engineer Al-25 Engineering Division Peach Bottom Atomic Power Station ATIN: Chief Engineer Route 1 Box 208 231 E. Baltimore Street Delta, Pennsylvania 17314 Baltimore, MD 21202-3486 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta. Pennsylvania 17314 B-3, Tawes States Office Building Annapolis, Maryland 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Comission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Roland Fletcher Department of Environment 201 West Preston Street Baltimore, Maryland 21201 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 1