ML20062G462

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Program Second 10-Yr Interval, Updated to Reflect Organizational Changes,Plant Mods & Improved Format
ML20062G462
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/15/1990
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062G467 List:
References
NUDOCS 9011290245
Download: ML20062G462 (7)


Text

_ __ _ __._. _ _ . . _ . _ _ _. _ ._. . _ _ _ _ _ _ _ _ _ ___ _ ~~

, '. i PHILADELPHIA ELECTRIC COMPANY-1 NUC;, EAR GROUP HEADQUARTERS

)

9% 65 CHESTERBROOK BLVD, WAYNE, PA 19087 5691

-(sis) sso sooo t

'l dcic Ler- 15, 1990 Docket Nos. 50-277

=50-278 License Nos. DPR-44 DPR U.S. Nuclear Regulatory Commission I Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power' Station, Units 2 and 3-Submittal of the Revised Edition of the i

" Inservice Inspection (ISI)~ Program Second Ten Year Interval" Dear Sir; l Enclosed is a revised-edition-of the " Inservice Inspection (ISI) Program Second Ten Year Interval"'for Peach Bottom Atomic-Power Station, Specification Units 2 andO.

M-733,.Rev. 3 which'has been issued as. Engineering

.The-original edition of the second interval ISI program has been' updated to reflect' organizational changes, plant modifications, and to-provide an improved format.

This is an administrative revision and does-not constitute a '

revision Relief to the implementation Requests discussed below,of the ISI program:except for-the- i i

In accordance with-10 CFR 50.'55a(g)(5 , Philadelphia Electric Company requests 1the-reviewrand approv)al of nine new Relief-Requests which are.includoc in the' revised edition-of the " Inservice Inspection (ISI) Program Second Ten Year Interval" (identified in-Attachment A ac. Category A Relief Requests). .We also request thet }

review and approval of revisions to six ReliefERequests which;were-previously suumitted and-approved by the NRC as part of the second' 10Relief C year interval Requests). ISI program'(identified in' Attachment A as Category. '

[hL

~

9011290245 001115 d 1

{DR ADOCK 05000277 ] l PDC "u,y ,

f

. :r'

U.S. Nuclear Regulatory Commission Novsabor 15, 1990 Submittal of the Reviced Edition of the P0ga 2 l Second. Interval ISI Program l .

Included in Appendix B of this revised edition of the ISI l program is the " Augmented Inspection Program-5" (Aug-5), " Snubber l Examination and Test Program". This program was developed based on recent industry inspection data and standards, and.is intended to replace the current PBAPS. Technical Specifications Surveillance Requirement 4.11.D. Philadelphia Electric Company will separately submit a license change request that deletes Surveillance Requirement 4.11.D. We request your review and approval of Aug-5 so i

that it may be implemented when the license change request is approved.

1

{ It should be noted that,the complete " Inservice Inspection t

(ISI) Program Second Ten Year Interval" document, which includes ISI tables and ASME Section XI drawings, is'available for reference at the Peach Bottom Atomic Power Station or the Philadelphia Electric Company Nuclear Group Headquarters.

If you have any questions regarding this issue, please do not hesitate to contact us.

Very truly yours,

. Or .

G. A. Hunger, Jr.

Manager, Licensing Nuclear Engineerit<g & Services l.

Enclosure cc: T. T. Martin, Administrator, Region.I, USNRC-J. J. Lyash, USNRC Senior Resident Inspector (w/l attachment)

G. Y. Suh. USNRC Project Manager, PB (w/3 attachments)

-- ..-. ~ . -

a

'PBAPS UNIT'2J& 3 SECOND-INTERVAL-

, UPDATED ISI.

PROGRAM SUBMITTAL ATTACHMENT A.

PAGE 1 OF.5-Summary of Changes to hhe PBAPS-2&3 Second Interval ISI Program Relief Request, This report identifies.all-relief requests applicable to the Peach Bottom Atomic Power Station, Units '2&3 Second Interval. ISI-Program, as identified in Specification M-733,_Rev0.; These Relief Requests are divided into three (3) categories as defined below:

Category A: New Relief Requests-not previously; submitted- I to the USNRC.

]

Category B: Relief Requests previously submitted and-approved by the'USNRC as part of the'second  ;

10 year' interval-ISI program transmitted via-letter dated June 28, 1984.

Category C: Relief Requests.previously submitted'and,,

approved.by,the USNRC as part.of the second 10 year interval ISI program transmitted'via letter' dated June 28,.1984, whichshave been L revised. These revisions _ include changes of scope,.by addition or' deletion _of welds /

components, or changes to alternate

  • provisions from-that originally submitted.-

The Relief Requests are listed by their:new identification . ,

numbers, examination category, and item 'numbersor svbject topic,' l as applicable. Categories B and C includeEa description which '

identifies the original Relief Request number as: transmitted.by letter dated June 28, 1984._ The description also includes a  !

summary of any changes in the scope or alternate provisions, as  !

applicable -

)

A copy of each Relief Request is contained in Appendix A of the 3 ISI Program Documentr,. Specification M-733','RevisionLO.

Category A: (New Relief Requests): I Relief Request No. Exam Category / Subject ' Item No.  !

RR-07 C-F Pressure retaining welds C5.10 l in piping C5.ll-C5;12~ J C5.20 C5.21' .

C5.22' J C5.30 C5.31 i C5.32 l l

Q'

PBAPS UNIT.2 & 3 .

SECOND INTERVAL- -l
  • ~. 11PDATED ISI i PROGRAM SUBMITTAL i

. Attachment A1 .

Page 2 of 5 RR-08 C-A Pressure retaining welds in C1.10 )

pressure vessels-

! RR-11 Class 2 piping and components

~

N/A beyond the last shutoff valve 1

' in open-ended portions of systems RR-12 Class 3 piping and' components N/A beyond the last shutoff valve in open-ended. portions.of systems i

~

RR-13 B-D' Full penetration nozzle to B?.90 vessel welds in'the RPV RR-14 ASME Code Case (s) authorization -1/A request u

RR-15 C-C Integral. attachments for. C3.10 vessels, piping, pumps and C3.20 valves C3.30 i C3.40 RR-16 C-H Class 2 pressure, retaining C7.10 components _ C7.20 ,

C7.30 C7.40 l

C7.50 C7.60 C7.70 C7.80 RR-17 D-A, D-B, D-C" Class.3 pressuie~ D1.10 ' .

t

-retaining components D2.10 D3.10:

l' Category B: (Original Relief Requests)

Relief Request No. Exam Category / Subject Item No~. g RR-04 B-P. Class.1 pressure B15.11 q' retaining components B15.51-B15.61 i B15.'71

Description:

- Submittedrand: approved.per SER, datedL

. April 8, 1986,.as Relief-Request 12.4.4 of,the second 10 year Interval ISI Program transmitted via letter dated June 28, 1984.1  ;

i I

h PBAPS--UNITL2 s 3

  • . SECONDiINTERVAL:

i UPDATED ISI l PROGRAM SUBMITTAL' Attachment'A-Page:3lof 5 RR-09 D-B Class 3 pressure retaining. D2.10 components inithe High Pressure Service Water, "

the Emergency-Service Water, and the Emergency' '

Cooling Systems i

Description:

Submitted and' approved per SER,; dated Aprils 8, 1986, as Relief Request'4.4.1Loffthe second 10 Year Interval ISI Program, ,,

transmitted'via letter dated' June 28,-1984'. g

.)

Category C: (Revised Original Relief' Requests)

Relief Request No. Exam Category /Subfect Item No.

I RR-Ol' B-A Class-1-pressure . Bl .11L l retainingfcircumferenti'alf 1B1'.12i i and longitudinal shell. q welds in the-RPV1 '

.3

Description:

Submitted and approved per SER, dated- :j

. April 8, 1986, asLRelief' Request 2.4.lEof;the Second 10 Year-Interval ISI Program,.

transmitted viaLletter dated June 28, 1984.' l Alternate provisions:section hasibeen revised to include the examination) of a portion'of another circumferential/ longitudinal weld in 1 the belt line region-in' order to' accomplish i

-the equivalent of"100% of the' length of one; b weld.. J

~ ~

RR-02 B-L-2 Pump Casings" I B12.20' l

Description:

Submitted andrapproved per,SER,'datdd:  ;

April 8, 1986','as Relief Request:2.4.2;5?of  ;

the SecondT10 Year Interval ISI< Program,._ i transmitted.via11etter datedDJune'28=,~1984

, 7 j H The alternate: Provisions-section has been ' '

l revisedLto delete the proposed: UTewall l thickness surveillance ~ program. All other-

alternate provisions remain the same as- 1 originally submitted. 1 i

L 1

4 I

4 w- , j i

I PBAPS UNIT'2 & 31

  • SECOND INTERVAL' -i

.. '.* UPDATED ISI: ,

. PROGRAM. SUBMITTAL -

. Attachment A

Page 4 of.5 RR-03 B-M-2 Valve Bodies B12.50  !

Description:

Submitted and approved per SER dated  ;

April 8, 1986, as Relief Request 2.4.3 of the-Second'10 Year Interval ISI Program ,

transmitted via letter dated June 28, 1984. '

The Alternate Provisions section has been; revised to delete the proposed UT wall ,  !

thickness surveillance program. All other alternate provisions remain the same as- .!

originally submitted.

l RR-05 B-J Class 1 pressure- 1B9.10- i retaining welds in' -B9.11 piping B9.12 B9.20.

u 'B9.21 B9.22 4 B9.30- {

B9.31 i B9.32 B9.40-4

Description:

Submitted and, approved per SER, dated April 8, 1986, as Relief Requests-2.4.6, 2.4.7, and-2.4.8 of.the-Second 10 searJInterval IS1.

Program, transmitted via letter dated June 28, 1984. Scope / identification of welds. .

applicable to this relief request has been- )

revised. Total number of welds' requiring relief has been reduced as a result'of system modifications and pipe ~ replacement activities - -

which has provided_ greater accessibility for examination. Alternate provisions nQw(

require an additional' Code Category.B-J weld-be selected if examination of any selected circumferential weld is completely! 1 impractical 1(e.g., examination 0% complete).

i t'

e

-)

%' i t

PBAPS UNIT 2 & 3;-

, SECOND: INTERVAL l

.- UPDATED ISI'

, -PROGRAM SUBMITTAL.

1 Attachment A 1Page 5:of.5 i

RR-06 B-K-1 Class:1' integral B10.10-attachments for piping;and B10.20' -, .

pumps

Description:

Submitted and approved'per.SER,> dated April l

8,-1986,cas Relief' Requests 2.4.9,-2.4.10, and12.4.11 of'the-Second 10 Year Interval ISI'

' Program, transmitted'via. letter dated-June; ,

28,-1984. Scope / identification of integral' t i

attachments' applicable to this Relief Request has-beenLrevised.' Total number of' attachments requiring. relief has been reduced i as a result =of system modifications.and_ pipe replacement activities which has provided- o greater accessibility,for; examination.

RR-10 F-C Component, Standard-supports- F3.50i

.t'

Description:

Submitted _and.approvedperSERldatedEAprib 8, 1986, as Relief Request 5.3.1 of-the 1 Second110. Year' Interval >ISI. Program,- _ .

transmitted via letter dated: June- 28, 1984; The AlternateLProvisions'Section of!the new-relief request hasibeen' revised to11nclude'a

,~

new' snubber' examination and(te'st program:toi >

be implemented upon?USFRC' approval of~_ '

Augmented Inspection Program"AUG-Sland a l Tech. Spec.' Revision.-

  • l

'l Note: Relief Requests 2.4.2.4 and 2.4.5, previously submitted and approved, are not required = '

under the new SecondLInterval'ISI-Program ~.