ML20140G026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:. -                 - -       .-                 ..     _ . - . . ..   . -   .   ..   .             .-
{{#Wiki_filter:. -
- -
.-
..
_ . - . . ..
. -
.
..
.
.-
I.
I.
cod
w
w
  4
.
                                                                                                  cod          .
4
k
,
,
    k
April 30,1997
                                                    April 30,1997
l
l
l
l
l
l
l          Mr. J. H. Mueller
          Site Vice President
          Zion Generating Station
          Commonwealth Edison Company
            101 Shiloh Boulevard
          Zion, IL 60099
                                                                                                                '
          SUBJECT:          NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS 50-295/97008
                              (DRS); 50-304/97008(DRS) AND NOTICE OF VIOLATION                                    !
                                                                                                                  l
          Dear Mr. Mueller:
                                                                                                                  l
          On March 21,1997, the NRC completed an inspection at your Zion Generating Station                      i
          Units 1 and 2. The enclosed report presents the results of that inspection.
          Areas examined during the inspection are identified in the report. Within these areas, the
          inspection consisted of a selective examination of procedures and representative records,
l          interviews with personnel, and observation of activities in progress.
l          This inspection was to perform the emergency preparedness core inspection in NRC
          Inspection Procedure 82701 and review the status of previous open inspection findings.
          The report's Executive Summary provides an overview of our assessment of your
          performance in Emergency Preparedness, an aspect of Plant Support. At the conclusinn of                l
          the inspection the findings were discussed with those members of your staff identified in
          the report.
l
l
          The overall effectiveness of your emergency preparedness facilities, equipment, training,
Mr. J. H. Mueller
l         and functional organization was good. Plant personnel had performed conservatively                     I
Site Vice President
          during actual activations of the Emergency Plan, and emergency response facilities were
Zion Generating Station
          well-maintained. Quality assurance oversight of the program was also generally good.
Commonwealth Edison Company
          Based on the results of this inspection, the NRC has determined that a violation of NRC
101 Shiloh Boulevard
Zion, IL 60099
SUBJECT:
NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS 50-295/97008
'
(DRS); 50-304/97008(DRS) AND NOTICE OF VIOLATION
Dear Mr. Mueller:
On March 21,1997, the NRC completed an inspection at your Zion Generating Station
i
Units 1 and 2. The enclosed report presents the results of that inspection.
Areas examined during the inspection are identified in the report. Within these areas, the
inspection consisted of a selective examination of procedures and representative records,
l
interviews with personnel, and observation of activities in progress.
l
This inspection was to perform the emergency preparedness core inspection in NRC
Inspection Procedure 82701 and review the status of previous open inspection findings.
The report's Executive Summary provides an overview of our assessment of your
performance in Emergency Preparedness, an aspect of Plant Support. At the conclusinn of
the inspection the findings were discussed with those members of your staff identified in
the report.
l
The overall effectiveness of your emergency preparedness facilities, equipment, training,
l
and functional organization was good. Plant personnel had performed conservatively
I
during actual activations of the Emergency Plan, and emergency response facilities were
well-maintained. Quality assurance oversight of the program was also generally good.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred relative to failure to assess the adequacy of offsite interface during
,
,
'
'
          requirements occurred relative to failure to assess the adequacy of offsite interface during
the annual review of the Emergency Preparedness program. This violation is cited in the
          the annual review of the Emergency Preparedness program. This violation is cited in the
enclosed Notice of Violation (Notice), and the circumstances surrounding it are described
          enclosed Notice of Violation (Notice), and the circumstances surrounding it are described
in detail in the subject inspection report.
          in detail in the subject inspection report.
\\
                                                                                                        \
l
                                                                                                            l
t
,                                                                                                       t
,
!
!
;
9705060213 970430
          9705060213 970430
/ 3[
            DR    ADOCK0500g5                                                            t/ 3[
ADOCK0500g5
;
DR
t
,
,
                                                              *
*
                                                                            b
b


      . - _ . . _ . _     _._ _                     __ _ _,- _ _ _ - _ - _ _ . _ ._._ _ . _-- _ . _ _ _ _ _ _ . _
. - _ . . _ . _
                                                                                                                                                                      I
_._ _
  ,'*
__ _ _,- _ _ _ - _ - _ _ . _ ._._ _ . _-- _ . _ _ _ _ _ _ . _
                                                                                                                                                                      l
, ' *
  b
b
  ~
~
                                                                                                                                                                      :
'a
  'a       J. H. Mueller                                                                                       -2-
J. H. Mueller
                                                                                                                                        April 30,   1997
-2-
                                                                                                                                                                      \
April 30,
                                                                                                                                                                      '
1997
            In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,
\\
            the enclosure (s), and your response (s) to this letter will be placed in the NRC Public
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,
            Document Room.                                                                                                                                             ,
'
                                                                                                                                                                      1
the enclosure (s), and your response (s) to this letter will be placed in the NRC Public
                                                                                                Sincerely,                                                             l
Document Room.
                                                                                                /s/ Geoffrey E. Grant
,
                                                                                                Geoffrey E. Grant, Director
1
                                                                                                Division of Reactor Safety
Sincerely,
            Docket Nos. 50-295; 50-304
/s/ Geoffrey E. Grant
            Licenses No. DPR-39; DPR-48
Geoffrey E. Grant, Director
            Enclosures:               1. Notice of Violation
Division of Reactor Safety
                                      2. Inspection Reports 50-295/97008(DRS); 50-304/97008(DRS)
Docket Nos. 50-295; 50-304
            cc w/encis:               T. J. Maiman, Senior Vice President,
Licenses No. DPR-39; DPR-48
                                        Nuclear Operations Division
Enclosures:
                                      D. A. Sager, Vice President,
1. Notice of Violation
                                        Generation Support
2. Inspection Reports 50-295/97008(DRS); 50-304/97008(DRS)
                                      H. W. Keiser, Chief Nuclear
cc w/encis:
                                        Operating Officer                                                                                                             l
T. J. Maiman, Senior Vice President,
                                      R. Starkey, Plant General Manager                                                                                               !
Nuclear Operations Division
                                      R. Godley, Regulatory Assurance
D. A. Sager, Vice President,
                                        Supervisor
Generation Support
                                      I. Johnson, Acting Nuclear
H. W. Keiser, Chief Nuclear
                                        Regulatory Services Manager
Operating Officer
                                      Document Control Desk - Licensing
R. Starkey, Plant General Manager
                                      Richard Hubbard                                                                                                                 !
R. Godley, Regulatory Assurance
                                      Nathan Schloss, Economist,                                                                                                       '
Supervisor
                                        Office of the Attorney General
I. Johnson, Acting Nuclear
                                      Mayor, City of Zion
Regulatory Services Manager
                                      State Liaison Officer, Wisconsin
Document Control Desk - Licensing
                                      State Liaison Officer
Richard Hubbard
                                      Chairman, Illinois Commerce Commission
Nathan Schloss, Economist,
            Distribution:
'
            Docket File w/encls                               SRis, Zion, Braidwood,                                         Rlli Enf. Coordinator w/encls
Office of the Attorney General
            PUBLIC IE-35 w/encIs                                 Byron w/encls                                               R. A. Capra, NRR w/encls
Mayor, City of Zion
            OC/LFDCB w/encls                                 G.     E. Grant, Rlli w/encIs                                 TSS w/encls
State Liaison Officer, Wisconsin
            DRP w/encls                                       LPM, NRR w/encls                                               CAA1 w/encls
State Liaison Officer
            DRS w/encls                                       A. B. Beach, Rlil w/encls
Chairman, Illinois Commerce Commission
Distribution:
Docket File w/encls
SRis, Zion, Braidwood,
Rlli Enf. Coordinator w/encls
PUBLIC IE-35 w/encIs
Byron w/encls
R. A. Capra, NRR w/encls
OC/LFDCB w/encls
G. E. Grant, Rlli w/encIs
TSS w/encls
DRP w/encls
LPM, NRR w/encls
CAA1 w/encls
DRS w/encls
A. B. Beach, Rlil w/encls
L
L
            Rill PRR w/encls                                 C. D. Pederson, Rlll w/encls
Rill PRR w/encls
!           DOCUMENT NAME: G:DRS\ZIO97008.DRS
C. D. Pederson, Rlll w/encls
!
DOCUMENT NAME: G:DRS\\ZIO97008.DRS
i
i
v.
*. .
y .e es. 4
m. we.m. i. m. wn: c - c,y wmiout .ti.*n.nu.nm
r - c,y wm> mi.*
nu.nm
-
-
            v.        *. .      y .e es. 4      m. we.m. i. m. wn: c - c,y wmiout .ti.*n.nu.nm                                    r - c,y wm> mi.* nu.nm
r -n..ev
              r -n..ev
i
i             OFFICE             Rill                         E     Rill                             l s,     R O fgj       lV   Rill     _l
OFFICE
l             NAME               JFoster:jp dg                       RJickling g(                               JC M                 MLeach/GW
Rill
                                                                                                    "
E
              DATE                04/ ///07                           04/7 /97                                   Off/Q /97
Rill
                                '                                                                                      '
l s, R O fgj
                                                                                                                                        04/20/97 ( )(J _
lV
Rill
_l
l
NAME
JFoster:jp dg
RJickling g(
JC M
MLeach/GW
DATE
04/ ///07
04/7 /97
Off/Q /97
04/20/97 ( )(J _
"
' DEsp.gof
'
'// z '''/ f
f
!
!
                                    DEsp.gof
__
                                          '// z '''/ f              f
.
                                                                                                    __                      _. _                 ._      _ _ - . _ .
._
_
- .
.
}}
}}

Latest revision as of 16:28, 11 December 2024

Forwards Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21 & NOV
ML20140G026
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/30/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20140G029 List:
References
50-295-97-08, 50-295-97-8, 50-304-97-08, 50-304-97-8, NUDOCS 9705060213
Download: ML20140G026 (2)


See also: IR 05000295/1997008

Text

. -

- -

.-

..

_ . - . . ..

. -

.

..

.

.-

I.

cod

w

.

4

k

,

April 30,1997

l

l

l

l

Mr. J. H. Mueller

Site Vice President

Zion Generating Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS 50-295/97008

'

(DRS); 50-304/97008(DRS) AND NOTICE OF VIOLATION

Dear Mr. Mueller:

On March 21,1997, the NRC completed an inspection at your Zion Generating Station

i

Units 1 and 2. The enclosed report presents the results of that inspection.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of a selective examination of procedures and representative records,

l

interviews with personnel, and observation of activities in progress.

l

This inspection was to perform the emergency preparedness core inspection in NRC

Inspection Procedure 82701 and review the status of previous open inspection findings.

The report's Executive Summary provides an overview of our assessment of your

performance in Emergency Preparedness, an aspect of Plant Support. At the conclusinn of

the inspection the findings were discussed with those members of your staff identified in

the report.

l

The overall effectiveness of your emergency preparedness facilities, equipment, training,

l

and functional organization was good. Plant personnel had performed conservatively

I

during actual activations of the Emergency Plan, and emergency response facilities were

well-maintained. Quality assurance oversight of the program was also generally good.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred relative to failure to assess the adequacy of offsite interface during

,

'

the annual review of the Emergency Preparedness program. This violation is cited in the

enclosed Notice of Violation (Notice), and the circumstances surrounding it are described

in detail in the subject inspection report.

\\

l

t

,

!

9705060213 970430

/ 3[

ADOCK0500g5

DR

t

,

b

. - _ . . _ . _

_._ _

__ _ _,- _ _ _ - _ - _ _ . _ ._._ _ . _-- _ . _ _ _ _ _ _ . _

, ' *

b

~

'a

J. H. Mueller

-2-

April 30,

1997

\\

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter,

'

the enclosure (s), and your response (s) to this letter will be placed in the NRC Public

Document Room.

,

1

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Nos. 50-295; 50-304

Licenses No. DPR-39; DPR-48

Enclosures:

1. Notice of Violation

2. Inspection Reports 50-295/97008(DRS); 50-304/97008(DRS)

cc w/encis:

T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

R. Starkey, Plant General Manager

R. Godley, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

'

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/encls

SRis, Zion, Braidwood,

Rlli Enf. Coordinator w/encls

PUBLIC IE-35 w/encIs

Byron w/encls

R. A. Capra, NRR w/encls

OC/LFDCB w/encls

G. E. Grant, Rlli w/encIs

TSS w/encls

DRP w/encls

LPM, NRR w/encls

CAA1 w/encls

DRS w/encls

A. B. Beach, Rlil w/encls

L

Rill PRR w/encls

C. D. Pederson, Rlll w/encls

!

DOCUMENT NAME: G:DRS\\ZIO97008.DRS

i

v.

  • . .

y .e es. 4

m. we.m. i. m. wn: c - c,y wmiout .ti.*n.nu.nm

r - c,y wm> mi.*

nu.nm

-

r -n..ev

i

OFFICE

Rill

E

Rill

l s, R O fgj

lV

Rill

_l

l

NAME

JFoster:jp dg

RJickling g(

JC M

MLeach/GW

DATE

04/ ///07

04/7 /97

Off/Q /97

04/20/97 ( )(J _

"

' DEsp.gof

'

'// z / f

f

!

__

.

._

_

- .

.