Peach Bottom Atomic Power Station u   :.        .
. ~.
A                                                                                                                 <
Peach Bottom Atomic Power Station u
V PECO NUCLEAR                                                       e,co ,m ,,,ccm ,,,,
A V
A Uhit of PECO Energy                                               y,y,V g4 9032 1
PECO NUCLEAR e,co,m,,,ccm,,,,
A Uhit of PECO Energy y,y,V g4 9032 1
717 456 7014 4
717 456 7014 4
J March 2,1999 1
J March 2,1999 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen Enclosed is the monthly operating repon for Peach Bottom Units 2 anc 3 for the month of February 1999 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen Enclosed is the monthly operating repon for Peach Bottom Units 2 anc 3 for the month of February 1999 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, Gordon L Johnston Director, Site Engineering Peach Bottom Atomic Power Station l
Sincerely, l
frJ GLJ/WJ/DEK/JC:dmk pc Enclosures cc:
Gordon L Johnston Director, Site Engineering Peach Bottom Atomic Power Station                                                                         l frJ GLJ/WJ/DEK/JC:dmk pc Enclosures cc:     N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC                                       i A.C. McMurtray, USNRC, Senior Resident inspector                               k' A.F. Kirby,111, Delmarva Power & Light
N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC i
                                " AO Records Center r
A.C. McMurtray, USNRC, Senior Resident inspector k'
cor 99-14022                                                                           0[ f 9903126216   ADOCK ONXXM,177 6
A.F. Kirby,111, Delmarva Power & Light
PDet R
" AO Records Center 0[ f r
cor 99-14022 9903126216 6 ADOCK ONXXM,177 PDet R


    *        ''                                                                                                                J
J Peach Bottom Atomm Power Station Unit 2 February 1 through February 28,1999 J
.                                              Peach Bottom Atomm Power Station Unit 2                                                       ,
    ,                                        February 1 through February 28,1999                                               !
J
: 1. Narrative Summarv of Operatina Experiences Unit 2 began the month of February at 100% power.
: 1. Narrative Summarv of Operatina Experiences Unit 2 began the month of February at 100% power.
The unit reduced power to 61% starting at 22:00 on February 19 for control rod scram time                     l
The unit reduced power to 61% starting at 22:00 on February 19 for control rod scram time
                - testing, reactor feedpump turbine testing, a control rod sequence exchange, and repair of a                 l moisture separator drain tank drain valve.
- testing, reactor feedpump turbine testing, a control rod sequence exchange, and repair of a moisture separator drain tank drain valve.
The unit retumed to 100% st 16:00 on February 20.
The unit retumed to 100% st 16:00 on February 20.
Unit 2 ended the month of February at 100% power.
Unit 2 ended the month of February at 100% power.
Line 44: Line 43:
1
1
[*.
[*.
4                                                                                                                Attachment to       l I
Attachment to 4
Monthly Operating Report for February 1999       I Paje 1     ,
Monthly Operating Report for February 1999 Paje 1 1
1
4 UNIT 2 REFUELING INFORMATION 1.
,                                                                                                                                    l 4
Name of facility:
UNIT 2 REFUELING INFORMATION
Peach Bottom Unit 2 2.
: 1.             Name of facility:
- Scheduled date for next refueling shutdown:
Peach Bottom Unit 2
Reload 13 is scheduled for September 29,2000.
: 2.           - Scheduled date for next refueling shutdown:
5 3.
!                                      Reload 13 is scheduled for September 29,2000.
Scheduled date for restart following refueling:
5
;            3.             Scheduled date for restart following refueling:
Restart following refueling forecast for October 27,2000.
Restart following refueling forecast for October 27,2000.
.                                                                                                                                    1
1 4.
: 4.             Will refueling or resumption of operation therefore require a technical epecification change             l or otherlicense amendment?
Will refueling or resumption of operation therefore require a technical epecification change or otherlicense amendment?
N/A                                                                                                     I 1
N/A 1
)                           If answer is yes, what, in general, wi;l these be?                                                     J
J
: 5.             Scheduled date(s) for submitting proposed licensing action and Jupporting information:
)
l N/A                                                                                                     j
If answer is yes, what, in general, wi;l these be?
: 6.             Important licensing considerations associated with refueling, e.g., new or different fuel design or     ,
5.
supplier, unreviewed design or performance analysis methods, significant changes in fuel design,       j new operating procedures:                                                                               j a, The reload included 292 GE-13 bundles which replaced an equal number of GE-11 bundles,               )
Scheduled date(s) for submitting proposed licensing action and Jupporting information:
N/A j
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, j
new operating procedures:
j a, The reload included 292 GE-13 bundles which replaced an equal number of GE-11 bundles,
)
This was the second reload of GE-13 fuel for the unit.
This was the second reload of GE-13 fuel for the unit.
m                                                                                                                   -        ..-
m


      --      ..          .  . . -            -        -~           --      - - . . -  . . .    . . -        - ..  - _ ~
-~
d Dockit No. 50-277           !
- _ ~
Attachment to Monthly Operating           ;
d Dockit No. 50-277 Attachment to Monthly Operating Report for February 1999 Page 2
Report for February 1999           l Page 2       )
)
UNIT 2 REFUELING INFORMATION (Continued) l
UNIT 2 REFUELING INFORMATION (Continued) 7.
: 7. The numbec of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:                       d (a) Core - 764 Fuel Assemblies (b) Fuel Pool- 3012 Fuel Asse.nblies,52 Fuel Rods
The numbec of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
: 8. The present licensed spent fuel pool storage capacity aN the size of any increase in licensed storage capacity that has been requer,ted or is planned, in number of fuel assemblies:
d (a) Core - 764 Fuel Assemblies (b) Fuel Pool-3012 Fuel Asse.nblies,52 Fuel Rods 8.
The present licensed spent fuel pool storage capacity aN the size of any increase in licensed storage capacity that has been requer,ted or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
: 9. The projected date of the tast refueling that can be discharged to the spent fuel pool assuming the present capacity 1
9.
September 2002 without full core offload capability.                                               ;
The projected date of the tast refueling that can be discharged to the spent fuel pool assuming the present capacity 1
i September 1998 with full core offload capability.                                                 I i
September 2002 without full core offload capability.
l l
i September 1998 with full core offload capability.
i l
l


4 OPERATING DATA REPORT t
4 OPERATING DATA REPORT t
DOCKET NO. 50 -277 DATE MARCH 2,1999 COWUETED BY PECO ENERGY COMPANY D. M KILGORF.
DOCKET NO. 50 -277 DATE MARCH 2,1999 COWUETED BY PECO ENERGY COMPANY D. M KILGORF.
PtANT ENGINEERING a
PtANT ENGINEERING ENGINEERING DMS40N a
ENGINEERING DMS40N I
I PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOM UNIT 2
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS                                                                                                                                                       PEACH BOTTOM UNIT 2
: 1. UNIT NAME:
: 1. UNIT NAME:                                                                                                                                                                 FEBRUARY,1999
FEBRUARY,1999 l
: 2. REPORTING PERIOD:                                                                                                                                                                       1119 l
: 2. REPORTING PERIOD:
: 3. DESIGN ELECTRICAL RATING (NET MWE):                                                                                                                                                     1159
1119
: 4. MAXIMUM CEPENDABLE CAPACITY (OROSS MWE):                                                                                                                                                 1093 5 MAX! MUM DEPENDABLE CAPACITY (NET MWE):
: 3. DESIGN ELECTRICAL RATING (NET MWE):
YR-TO-DATE                                   CUMULATNE THIS MONTH 146,963 2 1                                                                                                                                                                 1,416.0 672 0 j        6. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                                                                               0.0                         0.0 0.0
1159
: 7. REACTOR RESERVE SHUTDOWN HOURS                                                                                                                                                           144,779.8 672.0                                                1.416.0
: 4. MAXIMUM CEPENDABLE CAPACITY (OROSS MWE):
: 8. HOURS GENERATOR Om                                                                                                                                                 0.0                         0.0 0.0
1093 5 MAX! MUM DEPENDABLE CAPACITY (NET MWE):
: 9. UNIT RESErNE SHUTDOWN HOURS                                                                                                                   1,578.019                                130.270.291 ,
THIS MONTH YR-TO-DATE CUMULATNE 672 0 1,416.0 146,963 2 1
747,123
: 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 j
0.0 0.0
: 7. REACTOR RESERVE SHUTDOWN HOURS 144,779.8 1.416.0 672.0
: 8. HOURS GENERATOR Om 0.0 0.0 0.0
: 9. UNIT RESErNE SHUTDOWN HOURS 130.270.291 747,123 1,578.019
: 10. NET ELE'CTRICAL ENERGY GENERATED (MWH)
: 10. NET ELE'CTRICAL ENERGY GENERATED (MWH)
  ~%
~%
e'       s
e' s
  * * '        s   , _ . ,
s


                                                                                                                                                                                                                                                                                                                                                      ~'
~'
UNIT SHUTDCM/NS                                                                                                   .
UNIT SHUTDCM/NS UNITNARE PEACHBOTTOMUNIT2 DATE MARCH 2.1999 COhPLETEDBY PECOENERGYCC9FANY D. M. IGLGORE PUWT ENGINEERING ENGINEERING DMSDON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4563412 REPORT MONTH FEBRUARY.1999 NETHOD OF CAUSE AND CORRECTNE TYPE 00 RATION REASON SHUTTING DOWN ACTIONTO '
UNITNARE PEACHBOTTOMUNIT2
NO.
* DATE MARCH 2.1999 COhPLETEDBY PECOENERGYCC9FANY D. M. IGLGORE PUWT ENGINEERING ENGINEERING DMSDON PEACH BOTTOM ATOMIC POWER STATION FEBRUARY.1999                                                                                                                                                                              TELEPHONE (717)4563412 REPORT MONTH NETHOD OF                 CAUSE AND CORRECTNE REASON                                                             SHUTTING DOWN                               ACTIONTO '
DATE (1)
TYPE                                                00 RATION                                                                                                                                                                      PREVENT RECURRENCE DATE                                                               . HOURS)                                                                       (2)                                                             REACTOR (3)
. HOURS)
NO.                                  (1)
(2)
TOTAL HOURS (3)
REACTOR (3)
PREVENT RECURRENCE TOTAL HOURS (3)
(2)
(2)
(1)
(1)
REASON METHOD F-FORCED                                                                                                                                                                                                                                                               1 -IMNUAL A-EQUIPMENT FAILURE (EXPLAIN)
METHOD REASON F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1 -IMNUAL S -SCHEDULED 2 -MANUAL SCRAM i
S -SCHEDULED                                                                                                                                                                                                                                                           2 -MANUAL SCRAM B-MAINTENANCE CR TEST 3- AUTOMATIC SCRAM C- REFUELING D-REGULATORY RESTRICTION                                                                   4 -OTHER (EXPLAIN)
B-MAINTENANCE CR TEST 3-AUTOMATIC SCRAM C-REFUELING D-REGULATORY RESTRICTION 4 -OTHER (EXPLAIN)
E- OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
E-OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
H-OTHER (EXPLAIN) i
-_--_ _ _ _ _ _ _ _ - _-.                      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - - - - - _ _ _ _ - - _ - . _ _ _ - - _ - _ _ _ _ _ _ - - _ _ - _ _ _ _ _ - . _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ _ . -- . _ _ . _ - . - _                                                        _ _. ~ _ - . -
. ~


J
J Peach Bottom Atomic Power Station Unit 3 February 1 through February 28,1999 1.
    .                                      Peach Bottom Atomic Power Station Unit 3                                                               1
Narrative Summary of Operatina Experiences i
                      ,    ,            February 1 through February 28,1999                                                 !
Unit 3 began the month of February at 100% power.
l
: 1. Narrative Summary of Operatina Experiences 1
i Unit 3 began the month of February at 100% power.
The unit operated at 100% for the entire month of Februaiy.
The unit operated at 100% for the entire month of Februaiy.
Unit 3 ended the month of February at 100% power.
Unit 3 ended the month of February at 100% power.
l 4
4 l
l l
l i
l l
j i
i j
i w
i i
w


Dockpt No. 50-278   )
Dockpt No. 50-278
(                                                                                                 Attachm:nt to Monthly Operating Report for February 1999   1 1
)
UNIT 3 REFUELING INFORMATION                                             j
(
: 1. Name of facility:
Attachm:nt to Monthly Operating Report for February 1999 1
Peach Bottom Unit 3
UNIT 3 REFUELING INFORMATION j
: 2. Scheduled date for next refueling shutdown:
1.
Reload 12 scheduled for October 1,1999                                                       )
Name of facility:
: 3. Scheduled date for restart following refueling Rectart following refueling scheduled for November 1,1999
Peach Bottom Unit 3 2.
: 4. Will refueling or resumption cf operation thereafter require a technir.al specification change or other license amendment?
Scheduled date for next refueling shutdown:
Reload 12 scheduled for October 1,1999
)
3.
Scheduled date for restart following refueling Rectart following refueling scheduled for November 1,1999 4.
Will refueling or resumption cf operation thereafter require a technir.al specification change or other license amendment?
Yes if answer is yes, what, in general, will these be?
Yes if answer is yes, what, in general, will these be?
: 1. Recirculating Pump Trip Modification to be installed during 3R12.
1.
: 2. Power Range Monitor Modification to be implemented during 3R12.
Recirculating Pump Trip Modification to be installed during 3R12.
: 5. Scheduled c' ate (s) for submitting proposed licensing action and supporting information.
2.
: 1. Recirculating Pump Trip has been submitted, and was approved for implementation
Power Range Monitor Modification to be implemented during 3R12.
: 2. Power Range Monitor is scheduled to be submitted in March,1999.
5.
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Scheduled c' ate (s) for submitting proposed licensing action and supporting information.
1.
Recirculating Pump Trip has been submitted, and was approved for implementation 2.
Power Range Monitor is scheduled to be submitted in March,1999.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
(a) Preliminary reload willinclude 276 GE-13 bundles.
(a) Preliminary reload willinclude 276 GE-13 bundles.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
7.
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
( one of the 2777 is a skeleton which contains less than a full complement of fuel rods) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
i
i


9
9 Dock;t No. 60-278 Att:chmInt to Monthly Operating Iteport for February 1999 Page 2 UNIT 3 REFUELING INFORMATION (Contmuod) 9.
      ' '                                                                                                Dock;t No. 60-278 Att:chmInt to Monthly Operating Iteport for February 1999 Page 2 UNIT 3 REFUELING INFORMATION (Contmuod)
' The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
: 9.   ' The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:                                                                                               ,
September 2003 without full core offload capability.
September 2003 without full core offload capability.
J                          September 1999 with full core officad capability.
September 1999 with full core officad capability.
1 I
J 1
1 l
I l
I


1 OPERATING DATA REPORT I                                                                                                                                                                                                                                     t DOCKET NO. 50-278 DATE MARCH 2,1999                                                                                                                 i COMPLETED BY PECO ENERGY COWANY D. M.10LGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOIAC POWER STATION                                                                               -
1 OPERATING DATA REPORT I
TELEPHONE (717)456-3412 OPERATING STATUS                                                                                                                                         PEACH BOTTOMUNIT 3
t DOCKET NO. 50-278 DATE MARCH 2,1999 i
: 1. UNIT NAhEi:                                                                                                                                                                                           FEPRUARY,1999
COMPLETED BY PECO ENERGY COWANY D. M.10LGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOIAC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOMUNIT 3
: 2. REPORTING PERIOD:                                                                                                                                                                                                   1119           ,
: 1. UNIT NAhEi:
3 DESIGN ELECTRICAL RATING (NET MWE):                                                                                                                                                                                   1159
FEPRUARY,1999
: 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).                                                                                                                                                                           1093
: 2. REPORTING PERIOD:
1119 3 DESIGN ELECTRICAL RATING (NET MWE):
1159
: 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).
1093
: 5. MAXIMUM DEPENDABLE CAPACITY (NET MWs):
: 5. MAXIMUM DEPENDABLE CAPACITY (NET MWs):
YR-TO-DATE                                                                                         CUMULATNE THIS MONTH 1,416.0                                                                                         147,724 9         j 672.0
THIS MONTH YR-TO-DATE CUMULATNE 672.0 1,416.0 147,724 9 j
: 6. NUMBER OF HOURS f :EACTOR WAS CRITICAL                                                                                 00                                                                                               00 00                                                                                                                                                 .
: 6. NUMBER OF HOURS f :EACTOR WAS CRITICAL 00 00 00
: 7. REACTOR RESERVE SHUTDOWN HOURS                                                                                     1,416.0                                                                                         143,933.0         l 672.0
: 7. REACTOR RESERVE SHUTDOWN HOURS 672.0 1,416.0 143,933.0 l
: 8. HOURS GENERATOR ON-UNE                                                                                                 0.0                                                                                                00        !
0.0 0.0 00
0.0                                                                                                                                              !
: 8. HOURS GENERATOR ON-UNE
: 9. UNIT RESERVE SHUTDOWN HOURS                                                                                                                                                                                     137,408.331        i 749.586                                         1.579.582 i
: 9. UNIT RESERVE SHUTDOWN HOURS 749.586 1.579.582 137,408.331 i
: 10. NET ELECTRICAL ENERGY GENERATED (MWH)
: 10. NET ELECTRICAL ENERGY GENERATED (MWH) i I
I h
h I
I
m--
                                                            ----  m-- -- - - - - - - - -          __ ---        w_-          - _ _ - . _ _ - - - - . - - - - - - . - - _ - - - - - - - - - _ - _ _ - - - _ _ _
w -


                                                                                                                                                                                                                                                                                  -- y UNIT SHUTDOWNS                                                                                                                                  ...
UNIT SHUTDOWNS
5 DOCrETNO. 50-278                                                                                       't UNITNiWE! PEACHBOTTOMUNIT3
-- y 5
DOCrETNO. 50-278
't UNITNiWE! PEACHBOTTOMUNIT3 DATE WRCH2.1999
(
(
DATE WRCH2.1999 COM'LETEDBY PECOENERGYCOMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOntC POWER STATION' FEBRUARY,1999                                                                                                                            TELEPHONE (717)4564412 REPORT MONTH METHOD OF                                         CAUSE AND CORRECTNE                                                                           +
COM'LETEDBY PECOENERGYCOMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOntC POWER STATION' TELEPHONE (717)4564412 REPORT MONTH FEBRUARY,1999 METHOD OF CAUSE AND CORRECTNE
SHUTTING DOWN                                                     ACTION TO TYPE                DURATION                                            REASON REACTOR (3)                                          PREWNT RECURRENCE NO. DATE           (1)                 (HOURS)                                                         (2)                                                                                                                                     . . _ - . - . -
+
TOTAL HOURS i
TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
PREWNT RECURRENCE TOTAL HOURS i
E i
E i
(3)
(3)
(2)
(2)
(1) hETHOD REASON                                                                                                 1 - MANUAL F-FORCED                                                                                                     A-EQUIPnENT FAILURE (EXPLAIN)
(1) hETHOD REASON 1 - MANUAL F-FORCED A-EQUIPnENT FAILURE (EXPLAIN) 2-MANUAL SCR...
S-SCEDULED                                                                                                                                                                                                        2-MANUAL SCR ...     .                                  i B- MAINTENANCE OR TEST                                                                                 3- AUTOMATIC SCRAM C- REFUELING 4-OTHER (EXPLAIN)                                       .
S-SCEDULED B-MAINTENANCE OR TEST 3-AUTOMATIC SCRAM i
D-REGULATORY RESTRICTION                                                                                                                                       !
C-REFUELING 4-OTHER (EXPLAIN)
E - OPERATOR TRAINING + UCENSE EXAMINATION F- ADMINISTRATNE G-OPERAllONALERROR (EXPtAIN)
D-REGULATORY RESTRICTION E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATNE G-OPERAllONALERROR (EXPtAIN)
H-OTHER (EXPUMN)
H-OTHER (EXPUMN)
..                          - _    _                        . _ _ _ _ _ _ _ _ _ _ _ _ . - __- ____--______ _ __                                                        _    ._ .. -_                    -          ,      - __ ,_                          _ - _ -        __:}}
:}}

Latest revision as of 21:17, 6 December 2024

Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With
ML20207G997
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1999
From: Johnston G, Kilgore D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-10.001 NUDOCS 9903120216
Download: ML20207G997 (11)


Text

...

. ~.

Peach Bottom Atomic Power Station u

A V

PECO NUCLEAR e,co,m,,,ccm,,,,

A Uhit of PECO Energy y,y,V g4 9032 1

717 456 7014 4

J March 2,1999 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen Enclosed is the monthly operating repon for Peach Bottom Units 2 anc 3 for the month of February 1999 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, Gordon L Johnston Director, Site Engineering Peach Bottom Atomic Power Station l

frJ GLJ/WJ/DEK/JC:dmk pc Enclosures cc:

N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC i

A.C. McMurtray, USNRC, Senior Resident inspector k'

A.F. Kirby,111, Delmarva Power & Light

" AO Records Center 0[ f r

cor 99-14022 9903126216 6 ADOCK ONXXM,177 PDet R

J Peach Bottom Atomm Power Station Unit 2 February 1 through February 28,1999 J

1. Narrative Summarv of Operatina Experiences Unit 2 began the month of February at 100% power.

The unit reduced power to 61% starting at 22:00 on February 19 for control rod scram time

- testing, reactor feedpump turbine testing, a control rod sequence exchange, and repair of a moisture separator drain tank drain valve.

The unit retumed to 100% st 16:00 on February 20.

Unit 2 ended the month of February at 100% power.

1

[*.

Attachment to 4

Monthly Operating Report for February 1999 Paje 1 1

4 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 2.

- Scheduled date for next refueling shutdown:

Reload 13 is scheduled for September 29,2000.

5 3.

Scheduled date for restart following refueling:

Restart following refueling forecast for October 27,2000.

1 4.

Will refueling or resumption of operation therefore require a technical epecification change or otherlicense amendment?

N/A 1

J

)

If answer is yes, what, in general, wi;l these be?

5.

Scheduled date(s) for submitting proposed licensing action and Jupporting information:

N/A j

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, j

new operating procedures:

j a, The reload included 292 GE-13 bundles which replaced an equal number of GE-11 bundles,

)

This was the second reload of GE-13 fuel for the unit.

m

-~

- _ ~

d Dockit No. 50-277 Attachment to Monthly Operating Report for February 1999 Page 2

)

UNIT 2 REFUELING INFORMATION (Continued) 7.

The numbec of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

d (a) Core - 764 Fuel Assemblies (b) Fuel Pool-3012 Fuel Asse.nblies,52 Fuel Rods 8.

The present licensed spent fuel pool storage capacity aN the size of any increase in licensed storage capacity that has been requer,ted or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the tast refueling that can be discharged to the spent fuel pool assuming the present capacity 1

September 2002 without full core offload capability.

i September 1998 with full core offload capability.

i l

l

4 OPERATING DATA REPORT t

DOCKET NO. 50 -277 DATE MARCH 2,1999 COWUETED BY PECO ENERGY COMPANY D. M KILGORF.

PtANT ENGINEERING ENGINEERING DMS40N a

I PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOM UNIT 2

1. UNIT NAME:

FEBRUARY,1999 l

2. REPORTING PERIOD:

1119

3. DESIGN ELECTRICAL RATING (NET MWE):

1159

4. MAXIMUM CEPENDABLE CAPACITY (OROSS MWE):

1093 5 MAX! MUM DEPENDABLE CAPACITY (NET MWE):

THIS MONTH YR-TO-DATE CUMULATNE 672 0 1,416.0 146,963 2 1

6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 j

0.0 0.0

7. REACTOR RESERVE SHUTDOWN HOURS 144,779.8 1.416.0 672.0
8. HOURS GENERATOR Om 0.0 0.0 0.0
9. UNIT RESErNE SHUTDOWN HOURS 130.270.291 747,123 1,578.019
10. NET ELE'CTRICAL ENERGY GENERATED (MWH)

~%

e' s

s

~'

UNIT SHUTDCM/NS UNITNARE PEACHBOTTOMUNIT2 DATE MARCH 2.1999 COhPLETEDBY PECOENERGYCC9FANY D. M. IGLGORE PUWT ENGINEERING ENGINEERING DMSDON PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4563412 REPORT MONTH FEBRUARY.1999 NETHOD OF CAUSE AND CORRECTNE TYPE 00 RATION REASON SHUTTING DOWN ACTIONTO '

NO.

DATE (1)

. HOURS)

(2)

REACTOR (3)

PREVENT RECURRENCE TOTAL HOURS (3)

(2)

(1)

METHOD REASON F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1 -IMNUAL S -SCHEDULED 2 -MANUAL SCRAM i

B-MAINTENANCE CR TEST 3-AUTOMATIC SCRAM C-REFUELING D-REGULATORY RESTRICTION 4 -OTHER (EXPLAIN)

E-OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) i

. ~

J Peach Bottom Atomic Power Station Unit 3 February 1 through February 28,1999 1.

Narrative Summary of Operatina Experiences i

Unit 3 began the month of February at 100% power.

The unit operated at 100% for the entire month of Februaiy.

Unit 3 ended the month of February at 100% power.

4 l

l i

j i

i w

Dockpt No. 50-278

)

(

Attachm:nt to Monthly Operating Report for February 1999 1

UNIT 3 REFUELING INFORMATION j

1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 12 scheduled for October 1,1999

)

3.

Scheduled date for restart following refueling Rectart following refueling scheduled for November 1,1999 4.

Will refueling or resumption cf operation thereafter require a technir.al specification change or other license amendment?

Yes if answer is yes, what, in general, will these be?

1.

Recirculating Pump Trip Modification to be installed during 3R12.

2.

Power Range Monitor Modification to be implemented during 3R12.

5.

Scheduled c' ate (s) for submitting proposed licensing action and supporting information.

1.

Recirculating Pump Trip has been submitted, and was approved for implementation 2.

Power Range Monitor is scheduled to be submitted in March,1999.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

(a) Preliminary reload willinclude 276 GE-13 bundles.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

( one of the 2777 is a skeleton which contains less than a full complement of fuel rods) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

i

9 Dock;t No.60-278 Att:chmInt to Monthly Operating Iteport for February 1999 Page 2 UNIT 3 REFUELING INFORMATION (Contmuod) 9.

' The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core officad capability.

J 1

I l

1 OPERATING DATA REPORT I

t DOCKET NO. 50-278 DATE MARCH 2,1999 i

COMPLETED BY PECO ENERGY COWANY D. M.10LGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOIAC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOMUNIT 3

1. UNIT NAhEi:

FEPRUARY,1999

2. REPORTING PERIOD:

1119 3 DESIGN ELECTRICAL RATING (NET MWE):

1159

4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).

1093

5. MAXIMUM DEPENDABLE CAPACITY (NET MWs):

THIS MONTH YR-TO-DATE CUMULATNE 672.0 1,416.0 147,724 9 j

6. NUMBER OF HOURS f :EACTOR WAS CRITICAL 00 00 00
7. REACTOR RESERVE SHUTDOWN HOURS 672.0 1,416.0 143,933.0 l

0.0 0.0 00

8. HOURS GENERATOR ON-UNE
9. UNIT RESERVE SHUTDOWN HOURS 749.586 1.579.582 137,408.331 i
10. NET ELECTRICAL ENERGY GENERATED (MWH) i I

h I

m--

w -

UNIT SHUTDOWNS

-- y 5

DOCrETNO. 50-278

't UNITNiWE! PEACHBOTTOMUNIT3 DATE WRCH2.1999

(

COM'LETEDBY PECOENERGYCOMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOntC POWER STATION' TELEPHONE (717)4564412 REPORT MONTH FEBRUARY,1999 METHOD OF CAUSE AND CORRECTNE

+

TYPE DURATION REASON SHUTTING DOWN ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

PREWNT RECURRENCE TOTAL HOURS i

E i

(3)

(2)

(1) hETHOD REASON 1 - MANUAL F-FORCED A-EQUIPnENT FAILURE (EXPLAIN) 2-MANUAL SCR...

S-SCEDULED B-MAINTENANCE OR TEST 3-AUTOMATIC SCRAM i

C-REFUELING 4-OTHER (EXPLAIN)

D-REGULATORY RESTRICTION E - OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATNE G-OPERAllONALERROR (EXPtAIN)

H-OTHER (EXPUMN)