          Docket No. 50-266
          Docket No. 50-301
          Wisconsin Electric Power Company
          ATTN: Mr. C. W. Fey
                  Vice President
                  Nuclear Power Department
          231 West Michigan, Room 308
          Milwaukee, WI 53201
          Gentlemen:
          This refers to the routine followup inspection conducted by Messrs. R. Hasse
          and N. Choules of this office on September 24-28, 1984, of activities at
          Point Beach Units 1 and 2 authorized by Operating Licenses No. DPR-24 and
          No. DPR-27 and to the discussion of our findings with Mr. Link and members of
          the Nuclear Power Department at the conclusion of the inspection.
          .This inspection was conducted to determine the status cf your actions taken
          in response to a previous NRC inspection (Report No. 50-266/83-21(DE);
          50-301/83-20(DE)).
          'The enclosed copy of'our inspection report identifies the findings reviewed
          during the inspection and the status of your actions in response to these
          findings. The inspection consisted of an examination of procedures and
          records and interviews with personnel.
          No new items of noncompliance with NRC requirements were identified during the
          course of this inspection.
          In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
          will be placed in the NRC Public Document Room unless you notify this offica,
          by telephone, within ten days of the date of this letter and submit written
          application to withhold information contained therein within thirty days of
          the date of this letter. 'Such application must be consistent with the re-
          quirements of 2.790(b)(1). If we do not hear from you in this regard within
          the specified periods noted above, a copy of this letter and the enclosed
          inspection report will be placed in the Public Document Room.
              8411120196 841017
              PDR ADOCK 05000266
              O                  PDR
                                                                                          $Eut ;q
L
 
  '
.
    Wisconsin Electric Power Company        2
    We will gladly discuss any questions you have concerning this inspection.
                                              Sincerely,
                                                Off
                                              R. L. Spessard, Director
                                              Division of Reactor Safety
    Enclosure: Inspection Reports
        No. 50-266/84-17(DRS) and
        No. 50-301/84-15(DRS)
    cc w/ enc 1:
    J. J. Zach, Plant Manager
    ~DMB/ Document Control Desk (RIDS)
    Resident. Inspector, RIII
    John J. Duffy, Chief
        Boiler Section
    Peter Anderson, Wisconsin's
        Environmental Decade
    Ness Flores, Chairperson
      Wisconsin Public Service
        Commission
    RII              RIII                II        RIII    R I        RIII
    \Q
    H&sse'id
                    Q\Q
                      ChouTes        w
                                            l?
                                            O
                                        Hawkilns
                                                    (d W '
                                                    Walker  Sb
                                                                          kN/$lk.
                                                                        Spessa d
    10/09/84                      )                                    /0-/ M
}}
}}

Latest revision as of 15:53, 30 December 2020

Forwards Insp Repts 50-266/84-17 & 50-301/84-15 on 840924-28.No Noncompliance Noted
ML20204H176
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/17/1984
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20204H181 List:
References
NUDOCS 8411120196
Download: ML20204H176 (2)


See also: IR 05000266/1984017

Text

  • "

n

-

. .

OCT 171984

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fey

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine followup inspection conducted by Messrs. R. Hasse

and N. Choules of this office on September 24-28, 1984, of activities at

Point Beach Units 1 and 2 authorized by Operating Licenses No. DPR-24 and

No. DPR-27 and to the discussion of our findings with Mr. Link and members of

the Nuclear Power Department at the conclusion of the inspection.

.This inspection was conducted to determine the status cf your actions taken

in response to a previous NRC inspection (Report No. 50-266/83-21(DE);

50-301/83-20(DE)).

'The enclosed copy of'our inspection report identifies the findings reviewed

during the inspection and the status of your actions in response to these

findings. The inspection consisted of an examination of procedures and

records and interviews with personnel.

No new items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this offica,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. 'Such application must be consistent with the re-

quirements of 2.790(b)(1). If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

8411120196 841017

PDR ADOCK 05000266

O PDR

$Eut ;q

L

'

.

Wisconsin Electric Power Company 2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Off

R. L. Spessard, Director

Division of Reactor Safety

Enclosure: Inspection Reports

No. 50-266/84-17(DRS) and

No. 50-301/84-15(DRS)

cc w/ enc 1:

J. J. Zach, Plant Manager

~DMB/ Document Control Desk (RIDS)

Resident. Inspector, RIII

John J. Duffy, Chief

Boiler Section

Peter Anderson, Wisconsin's

Environmental Decade

Ness Flores, Chairperson

Wisconsin Public Service

Commission

RII RIII II RIII R I RIII

\Q

H&sse'id

Q\Q

ChouTes w

l?

O

Hawkilns

(d W '

Walker Sb

kN/$lk.

Spessa d

10/09/84 ) /0-/ M