ML20126J040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000219/1984031]]
{{Adams
| number = ML20126J040
| issue date = 05/31/1985
| title = Ack Receipt of 850509 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/84-31
| author name = Ebneter S
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Fiedler P
| addressee affiliation = GENERAL PUBLIC UTILITIES CORP.
| docket = 05000219
| license number =
| contact person =
| document report number = NUDOCS 8506100490
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000219/1984031]]
 
=Text=
{{#Wiki_filter:_ _
        _
                                          ,_          _ _ _ _ _ - _ _ _ _ _ _ _ _-_______                  -_
!
          m. .n'
                                                                                          MAY 311985
                  Docket No. 50-219
                  GPU Nuclear Corporation
p                ATTN: Mr. P. B. Fiedler
                          Vice President and Director
                  Oyster Creek Nuclear Generating-Station
                  P. O. Box 388
                  Forked River, NJ 08731
                . Gentlemen:
                  Subject:    Inspection Report No. 50-219/84-31
  -
                  This refers to your letter dated May 9, 1985, in response to our letter
                  dated January 17,.1985.
                  Thank you for informing us of the corrective and preventive actions documented
                  in your . letter.  These actions will be examined during a future inspection of
                  your licensed program.
                  Your cooperation with, us is appreciated.
                                                                                          Sincerely,
                                                                                            Origiz:al Signed By:
                                                                                            kY ff
                                                                                          S. Ebneter, Director
                                                                                          Division of Reactor Safety
                  cc:
                  M. Laggart, BWR Licensing Manager
t-                Licensing Manager, Oyster Creek
                .Public Document Room (PDR)
                  Local Public Document Room (LPDR)
                  Nuclear Safety Information Center (NSIC)
                  NRC Resident Inspector-
                  State of New Jersey
                                                                                                                        .
                          8506100490 850531 ~
                          PDR    ADOCK 05000219
                          G                  PDR
                                                                                                                              gol
                                                                                                                                    t
                                              0FFICIAL RECORD COP','                                  RL OYC 84-31 - 0001.0.0    1
                                                                                                      05/29/85
 
        . _ _ _ _ _ _ _
                                                    ,_  - -_    - _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ _ _                        ____
                                          ,
                            *
i,
          ,e.                ...
r
                                    [GPUNuclea'r' Corp.                                    -
                                                                                                                      2
      -
                        .w
                                                                                                                                                              -)
                                                                                                                                                              1
                                    bec:
                                    Region L Docket Room (with concurrences)
                                  .Section~ Chief,'DRP l                                                                                    s.
                                                                                                        ,
                                                                                                                                                              I
                                                                                                                                                              l
f
'
                                              s
    '
j:
  -.
e
k
  <
                                  .
                                        .,..                    g.n,_
                                  8488/85          [/p85                      f/3r/85
                                                              0FFICIAL RECORD COPY                                                    RL OYC 84-31 - 0002.0.0
                                                                                                                                      05/29/85
  ,.                    ..    ..
                                            .          _
                                                              .                                          _ _ - _ - -  _ _ _ _
 
  '.
  '
    ,
;i~
                                                                                              GPU Nuclear Corporation
      NUhIM7                                                                                  100 Interpace Parkway
                                                                                              Parsipparty, New Jersey 07054-1149
                                                                                                (201)265-6S00
                                                                                              TELEX 1:16-482
                                                                                              Writer's Direct Dial Number:
                                                                                                May 9, 1985 ~
      Mr. Thomas T. Martin, Director
      Division of Engineering and
      Technical Programs
      U.S. Nuclear Regulatory Commission
      King of Prussia, Pa.      19406
      Dear Mr. Martin:
            Subject: Oyster Creek Nuclear Generating Station
                        Docket No. 50-219
                        Inspection No. 50 219/84-31
      The following is provided in response to your letter of January 17, 1985
      concerning the subject matter.
      With respect to Equipment Classification, GPUN presently has provisions in
      place to identify the safety classification of major systems, components and
      structures at the plant as well as provisions for controlling safety-related
      activities associated with these items. The recently established Engineering
      Assurance group has been assigned the responsibility of developing a component
      level Quality Classification List (QCL) and it~is our intent to respond to
      this issue by the end of the 3rd quarter of 1985.
      With respect to Vendor Interface, GPUN intends to provide this information by
      the end of the 2nd quarter of 1985 as conveyed to Mr. E{ fan during the course
      of this inspection.
      With respect to Post-Maintenance Testing, GPUN is currently developing a
      Post-Maintenance Testing Program which addresses the concerns of Generic
      Letter 83-28. The key elements consist of:                                                          g ,,    , , c ,
                                                                                              u a w a ? y''P T ' i
                                                                                                                      2 fg).
                  GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation
 
  '
    o .
.
                                                -2-
              1.        Identification of the appropriate QCL components.
              2.        Development of administrative plant procedures to define a
                        program for the preparation, use, maintenance and control of
                        the Post-Maintenance Testing data base.
              3.        Identification of the appropriate vendor and engineering test
                        quidance.
                                                                                    -
                                                          .
              4.        Development of generic Post-Maintenance Testing requirenents
                        and guidelines for their use.
              5.        Review of existing plant procedures relative to the generic
                        Post-Maintenance Testing requirements and INP0 Good Practices.
        The implementation of the program will be phased based upon availability of
        the various elements. The administrative procedure shall be in place prior to
        the Cycle 11 Refueling Outage which will implement the first phase. The
        remaining phases, in order to be considered complete, are dependent upon the
        final completion of such items as our vendor interface program and the
        development of the QCL list.
                                                    Very truly yours,
                                                    P
                                                    Vice President and Director
                                                    Oyster Creek
        1r/1670f
        cc: 'Cir7 Thomas E. 'MuleiF~ Administrator *
              Region I
              U.S. Nuclear Regulatory Comission
              631 Park Avenue
              King of Prussia, Pa.    19406
              NRC Resident Inspector
              Oyster Creek Nuclear Generating Station
              Forked River, N. J. 08731
              J. Donohew
              U.S. Nuclear Regulatory Commission
              7920 Norfolk Avenue
              Bethesda, Maryland 20014
}}

Revision as of 11:47, 19 December 2020

Ack Receipt of 850509 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/84-31
ML20126J040
Person / Time
Site: Oyster Creek
Issue date: 05/31/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8506100490
Download: ML20126J040 (2)


See also: IR 05000219/1984031

Text

_ _

_

,_ _ _ _ _ _ - _ _ _ _ _ _ _ _-_______ -_

!

m. .n'

MAY 311985

Docket No. 50-219

GPU Nuclear Corporation

p ATTN: Mr. P. B. Fiedler

Vice President and Director

Oyster Creek Nuclear Generating-Station

P. O. Box 388

Forked River, NJ 08731

. Gentlemen:

Subject: Inspection Report No. 50-219/84-31

-

This refers to your letter dated May 9, 1985, in response to our letter

dated January 17,.1985.

Thank you for informing us of the corrective and preventive actions documented

in your . letter. These actions will be examined during a future inspection of

your licensed program.

Your cooperation with, us is appreciated.

Sincerely,

Origiz:al Signed By:

kY ff

S. Ebneter, Director

Division of Reactor Safety

cc:

M. Laggart, BWR Licensing Manager

t- Licensing Manager, Oyster Creek

.Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector-

State of New Jersey

.

8506100490 850531 ~

PDR ADOCK 05000219

G PDR

gol

t

0FFICIAL RECORD COP',' RL OYC 84-31 - 0001.0.0 1

05/29/85

. _ _ _ _ _ _ _

,_ - -_ - _ _ - - _ _ _ _ - - _ _ _ _ _ _ _ _ _ ____

,

i,

,e. ...

r

[GPUNuclea'r' Corp. -

2

-

.w

-)

1

bec:

Region L Docket Room (with concurrences)

.Section~ Chief,'DRP l s.

,

I

l

f

'

s

'

j:

-.

e

k

<

.

.,.. g.n,_

8488/85 [/p85 f/3r/85

0FFICIAL RECORD COPY RL OYC 84-31 - 0002.0.0

05/29/85

,. .. ..

. _

. _ _ - _ - - _ _ _ _

'.

'

,

i~

GPU Nuclear Corporation

NUhIM7 100 Interpace Parkway

Parsipparty, New Jersey 07054-1149

(201)265-6S00

TELEX 1:16-482

Writer's Direct Dial Number:

May 9, 1985 ~

Mr. Thomas T. Martin, Director

Division of Engineering and

Technical Programs

U.S. Nuclear Regulatory Commission

King of Prussia, Pa. 19406

Dear Mr. Martin:

Subject: Oyster Creek Nuclear Generating Station

Docket No. 50-219

Inspection No. 50 219/84-31

The following is provided in response to your letter of January 17, 1985

concerning the subject matter.

With respect to Equipment Classification, GPUN presently has provisions in

place to identify the safety classification of major systems, components and

structures at the plant as well as provisions for controlling safety-related

activities associated with these items. The recently established Engineering

Assurance group has been assigned the responsibility of developing a component

level Quality Classification List (QCL) and it~is our intent to respond to

this issue by the end of the 3rd quarter of 1985.

With respect to Vendor Interface, GPUN intends to provide this information by

the end of the 2nd quarter of 1985 as conveyed to Mr. E{ fan during the course

of this inspection.

With respect to Post-Maintenance Testing, GPUN is currently developing a

Post-Maintenance Testing Program which addresses the concerns of Generic

Letter 83-28. The key elements consist of: g ,, , , c ,

u a w a ? yP T ' i

2 fg).

GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation

'

o .

.

-2-

1. Identification of the appropriate QCL components.

2. Development of administrative plant procedures to define a

program for the preparation, use, maintenance and control of

the Post-Maintenance Testing data base.

3. Identification of the appropriate vendor and engineering test

quidance.

-

.

4. Development of generic Post-Maintenance Testing requirenents

and guidelines for their use.

5. Review of existing plant procedures relative to the generic

Post-Maintenance Testing requirements and INP0 Good Practices.

The implementation of the program will be phased based upon availability of

the various elements. The administrative procedure shall be in place prior to

the Cycle 11 Refueling Outage which will implement the first phase. The

remaining phases, in order to be considered complete, are dependent upon the

final completion of such items as our vendor interface program and the

development of the QCL list.

Very truly yours,

P

Vice President and Director

Oyster Creek

1r/1670f

cc: 'Cir7 Thomas E. 'MuleiF~ Administrator *

Region I

U.S. Nuclear Regulatory Comission

631 Park Avenue

King of Prussia, Pa. 19406

NRC Resident Inspector

Oyster Creek Nuclear Generating Station

Forked River, N. J. 08731

J. Donohew

U.S. Nuclear Regulatory Commission

7920 Norfolk Avenue

Bethesda, Maryland 20014