ML062120625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML062120625
| number = ML062120625
| issue date = 03/21/2006
| issue date = 03/21/2006
| title = 2006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing
| title = Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing
| author name = Eads J H
| author name = Eads J
| author affiliation = NRC/NRR/ADRO/DLR/RLRB
| author affiliation = NRC/NRR/ADRO/DLR/RLRB
| addressee name = Anderson C J, Bores R J, Emch R L, Franovich R L, Gillespie F P, Kuo P T, Laufer R J, Lund L A, McCarver S C, McIntyre D T, Meyer G W, Minnick S A, Modes M C, Pelton D L, Rowley J G, Screnci D P, Shane R M, Shea J J, Sheehan N A, Shoop U S, Sienel B E, Virgilio R O, Walker T E, Weaver K D, White A D, Wray J R
| addressee name = Anderson C, Bores R, Emch R, Franovich R, Gillespie F, Kuo P, Laufer R, Lund L, Mccarver S, Mcintyre D, Meyer G, Minnick S, Modes M, Pelton D, Rowley J, Screnci D, Shane R, Shea J, Sheehan N, Shoop U, Sienel B, Virgilio R, Walker T, Weaver K, White A, Wray J
| addressee affiliation = NRC/EDO
| addressee affiliation = NRC/EDO
| docket = 05000271, 05000293
| docket = 05000271, 05000293
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Ke nt H oward -VY Notice of Acceptab~ility and Opportun ity t eus ern .Pg From: Johnny Eads To: Beth Sienel; Cliff Anderson; David McIntyre; David Pelton; Diane Screnci; Duncan White; Francis Cameron; Frank Gillespie; Glenn Meyer; Jacob Zimmerman; James Shea; John Wray;Jonathan Rowley; Kathy Weaver; Louise Lund; Mauri Lemoncelli; Michael Modes; Neil Sheehan; Pao-Tsin Kuo; Raeann Shane; Rani Franovich; Richard Emch; Richard Laufer; Rick Ennis; Robert Bores;Rosetta Virgilio; Sammy McCarver; Sheri Minnick; Tracy Walker; Undine Shoop Date: 3/21/2006 4:58:53 PM  
{{#Wiki_filter:Ke nt Howard - VY Notice of Acceptab~ility and Opportun ity t   eus       ern                                           .Pg From:             Johnny Eads To:                 Beth Sienel; Cliff Anderson; David McIntyre; David Pelton; Diane Screnci; Duncan White; Francis Cameron; Frank Gillespie; Glenn Meyer; Jacob Zimmerman; James Shea; John Wray; Jonathan Rowley; Kathy Weaver; Louise Lund; Mauri Lemoncelli; Michael Modes; Neil Sheehan; Pao-Tsin Kuo; Raeann Shane; Rani Franovich; Richard Emch; Richard Laufer; Rick Ennis; Robert Bores; Rosetta Virgilio; Sammy McCarver; Sheri Minnick; Tracy Walker; Undine Shoop Date:             3/21/2006 4:58:53 PM


==Subject:==
==Subject:==
VY Notice of Acceptability and Opportunity to Request a Hearing FYI, we issued the Notice of Acceptability and Opportunity for Hearing today for VY. It should be published in the Federal Register early next week but is in ADAMS. The press release is in process.Attached is an electronic version for your information.
VY Notice of Acceptability and Opportunity to Request a Hearing FYI, we issued the Notice of Acceptability and Opportunity for Hearing today for VY. It should be published in the Federal Register early next week but is in ADAMS. The press release is in process.
The renewal review schedule will be updated on the website in the next couple of days.CC: Michael Morgan c :\tep\qGW}OOOO1.TMP  
Attached is an electronic version for your information. The renewal review schedule will be updated on the website in the next couple of days.
...- , Page ii Mail Envelope Properties (44207719.3CE 7 : 35544)
CC:                 Michael Morgan
 
c:\tep\qGW}OOOO1.TMP ...-                                                                         , Page ii Mail Envelope Properties     (44207719.3CE 7 : 35544)


==Subject:==
==Subject:==
VY Notice of Acceptability and Opportunity to Request a Hearing Creation Date 3/21/2006 4:58:49 PM From: Johnny Eads Created By: JHE@nrc.gov Recipients nrc.gov ATLPO.ATLDO MJM2 CC (Michael Morgan)nrc.gov OWGWPO02.HQGWDO01 FPG (Frank Gillespie)
VY Notice of Acceptability and Opportunity to Request a Hearing Creation Date         3/21/2006 4:58:49 PM From:                 Johnny Eads Created By:           JHE@nrc.gov Recipients nrc.gov ATLPO.ATLDO MJM2 CC (Michael Morgan) nrc.gov OWGWPO02.HQGWDO01 FPG (Frank Gillespie)
PTK (Pao-Tsin Kuo)RLE (Richard Emch)RLF2 (Rani Franovich) nrc.gov TWGWPO01.HQGWDO01 DTM (David McIntyre)JGR (Jonathan Rowley)LXL (Louise Lund)RJL (Richard Laufer)nrc.gov TWGWPO02.HQGWDO01 JJS (James Shea)KDW (Kathy Weaver)RMS2 (Raeann Shane)ROV (Rosetta Virgilio)USS (Undine Shoop)nrc.gov kpl-po.KPDO ADW (Duncan White)BEK (Beth Sienel)CJA (Cliff Anderson)DLP1 (David Pelton)DPS (Diane Screnci)GWM (Glenn Meyer)JRW3 (John Wray) c:\ternp~GW}OOOO1.TMP Page 211 c:\teMpýGWI00001_.TMP-ag --MCM (Michael Modes)NAS (Neil Sheehan)RJB (Robert Bores)SAM9 (Sheri Minnick)SCM (Sammy McCarver)TEW (Tracy Walker)nrc.gov owf4_po.OWFNDO RXE (Rick Ennis)nrc.gov owf5_po.OWFNDO FXC (Francis Cameron)JIZ (Jacob Zimmerman)
PTK (Pao-Tsin Kuo)
RLE (Richard Emch)
RLF2 (Rani Franovich) nrc.gov TWGWPO01.HQGWDO01 DTM (David McIntyre)
JGR (Jonathan Rowley)
LXL (Louise Lund)
RJL (Richard Laufer) nrc.gov TWGWPO02.HQGWDO01 JJS (James Shea)
KDW (Kathy Weaver)
RMS2 (Raeann Shane)
ROV (Rosetta Virgilio)
USS (Undine Shoop) nrc.gov kpl-po.KPDO ADW (Duncan White)
BEK (Beth Sienel)
CJA (Cliff Anderson)
DLP1 (David Pelton)
DPS (Diane Screnci)
GWM (Glenn Meyer)
JRW3 (John Wray)
 
Page 211 c:\ternp~GW}OOOO1.TMP c:\teMpýGWI00001_.TMP                                                                               -ag --
MCM (Michael Modes)
NAS (Neil Sheehan)
RJB (Robert Bores)
SAM9 (Sheri Minnick)
SCM (Sammy McCarver)
TEW (Tracy Walker) nrc.gov owf4_po.OWFNDO RXE (Rick Ennis) nrc.gov owf5_po.OWFNDO FXC (Francis Cameron)
JIZ (Jacob Zimmerman)
MTL1 (Mauri Lemoncelli)
MTL1 (Mauri Lemoncelli)
Post Office ATLPO.ATLDO OWGWPOO2.HQGWDOO1 TWGWPOO1.HQGWDO01 TWGWPO02.HQGWDO01 kpl-po.KPDO owf4_po.OWFNDO owf5_po.OWFNDO Route nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov nrc.gov Files Size Date & Time MESSAGE 740 3/21/2006 4:58:49 PM VY Notice of Acceptability and Opportunity to Request Hearing.wpd 70224 3/21/2006 4:49:50 PM Options Expiration Date: Priority: ReplyRequested:
Post Office                                                           Route ATLPO.ATLDO                                                           nrc.gov OWGWPOO2.HQGWDOO1                                                     nrc.gov TWGWPOO1.HQGWDO01                                                     nrc.gov TWGWPO02.HQGWDO01                                                     nrc.gov kpl-po.KPDO                                                           nrc.gov owf4_po.OWFNDO                                                        nrc.gov owf5_po.OWFNDO                                                        nrc.gov Files                             Size             Date & Time MESSAGE                         740               3/21/2006 4:58:49 PM VY Notice of Acceptability and Opportunity to Request Hearing.wpd     70224 3/21/2006 4:49:50 PM Options Expiration Date:                 None Priority:                       Standard ReplyRequested:                 No Return Notification:             None Concealed  
Return Notification:
Concealed  


==Subject:==
==Subject:==
Security: None Standard No None No Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered eW}OOOOI.TMP 31 Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled Kent Ho.Nard---VY Notice of AicceptabiIlity and 9pportu9jtyt9_Requqýt Hearing.wpd Page 1 Kent Ho.ward -VY Notice of Acdeptability and Opportunity to Request Hearing.wpd Pa March 21, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601-1839
No Security:                       Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered
 
31 eW}OO Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
 
Kent Ho.Nard---VY Notice of AicceptabiIlity and 9pportu9jtyt9_Requqýt Hearing.wpd                               Page 1 Kent Ho.ward VY Notice of Acdeptability and Opportunity to Request Hearing.wpd Pa March 21, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1839


==SUBJECT:==
==SUBJECT:==
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION  
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
By letter dated on January 25, 2006, as supplemented by letter dated March 15, 2006, the U.S.Nuclear Regulatory Commission (NRC) received the Entergy Nuclear Operations, Inc.application for renewal of Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station. Notice of receipt of this application was published in the Federal Register on February 6, 2006 (71 FR 6102). The purpose of this letter is to provide the results of the NRC staff's acceptance review of the license renewal application for the Vermont Yankee Nuclear Power Station. During the acceptance review, the NRC staff determines whether or not the application is sufficiently complete to allow the staff to proceed with its review.The NRC staff has reviewed your request following the guidance in NUREG-1 800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," and NUREG-1 555, "Environmental Standard Review Plan." As a result, the NRC Staff has determined that the application is complete and is acceptable for docketing, in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23 and 51.53(c).
However, the staff's determination does not preclude requests for additional information as the review proceeds.This letter forwards the staff's safety and environmental review schedule for the Vermont Yankee Nuclear Power Station license renewal application (Enclosure 1). The NRC staff will follow established review procedures and the enclosed schedule to complete the safety and environmental reviews required by 10 CFR Parts 54 and 51, respectively.
This schedule has been established in accordance with a 30-month review plan, which includes time to conduct a hearing should a hearing be requested and granted. Milestones for hearing activities are not included in the enclosed schedule because these dates will, if necessary, be established by the Commission or Atomic Safety and Licensing Board.I would like to stress that this is a very detailed and thorough review. The NRC staff will make every effort to meet the schedule milestones.
We request that you inform the staff as early as possible should potential delays arise in your support of the schedule.
Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pa qe Kent Howard -VY Notice of Ac&e~tabiliiy and Opportunity to Request Hearing.wpd Page 2l~M. Kansler Finally, we have also enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication (Enclosure 2).If you have any questions on this matter, please contact Johnny Eads, License Renewal Senior Project Manager for the Vermont Yankee Nuclear Power Station, by telephone at 301-415-1471 or via e-mail at JHE@nrc.qov.
Sincerely, IRA!Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271


==Enclosures:==
By letter dated on January 25, 2006, as supplemented by letter dated March 15, 2006, the U.S.
Nuclear Regulatory Commission (NRC) received the Entergy Nuclear Operations, Inc.
application for renewal of Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station. Notice of receipt of this application was published in the FederalRegisteron February 6, 2006 (71 FR 6102). The purpose of this letter is to provide the results of the NRC staff's acceptance review of the license renewal application for the Vermont Yankee Nuclear Power Station. During the acceptance review, the NRC staff determines whether or not the application is sufficiently complete to allow the staff to proceed with its review.
The NRC staff has reviewed your request following the guidance in NUREG-1 800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," and NUREG-1 555, "Environmental Standard Review Plan." As a result, the NRC Staff has determined that the application is complete and is acceptable for docketing, in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23 and 51.53(c). However, the staff's determination does not preclude requests for additional information as the review proceeds.
This letter forwards the staff's safety and environmental review schedule for the Vermont Yankee Nuclear Power Station license renewal application (Enclosure 1). The NRC staff will follow established review procedures and the enclosed schedule to complete the safety and environmental reviews required by 10 CFR Parts 54 and 51, respectively. This schedule has been established in accordance with a 30-month review plan, which includes time to conduct a hearing should a hearing be requested and granted. Milestones for hearing activities are not included in the enclosed schedule because these dates will, if necessary, be established by the Commission or Atomic Safety and Licensing Board.
I would like to stress that this is a very detailed and thorough review. The NRC staff will make every effort to meet the schedule milestones. We request that you inform the staff as early as possible should potential delays arise in your support of the schedule.


As stated cc w/encls: See next page KetHwr YNtc f cetblt n potuiyt eus ern.w.. ... .....[ KGMHow._ard__-_VY_
Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearing.wpd                                  Pa qe Kent Howard VY Notice of Ac&e~tabiliiy and Opportunity to Request Hearing.wpd Page 2l~
Notice- of A cceptabfli ity-an-d-Op-p--ortunit--y-t-o--R-e--qu--est-H-e-aring-.w-p-d-Page M. Kansler Finally, we have also enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication (Enclosure 2).This notice provides the opportunity to request a hearing and to file a petition for leave to intervene.
M. Kansler                     Finally, we have also enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the FederalRegisterfor publication (Enclosure 2).
If you have any questions on this matter, please contact Johnny Eads, License Renewal Senior Project Manager for the Vermont Yankee Nuclear Power Station, by telephone at 301-415-1471 or via e-mail at JHE@nrc.qov.
If you have any questions on this matter, please contact Johnny Eads, License Renewal Senior Project Manager for the Vermont Yankee Nuclear Power Station, by telephone at 301-415-1471 or via e-mail at JHE@nrc.qov.
Sincerely, IRA/Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271  
Sincerely, IRA!
Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271


==Enclosures:==
==Enclosures:==


As stated cc w/encls: See next page DISTRIBUTION:
As stated cc w/encls: See next page
See next page ADAMS Accession No.: Document Name: VY Notice of Acceptability and Opportunity to Request Hearing.wpd OFFICE PM:RLRB:DLR LA:RLRA:DLR OGC NLO BC:RLRB:DLR D:DLR NAME JEads YEdmonds MLemoncelli JZimmerman FGillespie (w/comments)
 
DATE 3/21/06 3/20/06 3/20/06 3/21/06 3/21/06 OFFICIAL RECORD COPY Kent Howard -VY Notice of kýcep!ý1?11_ýtyýaýqpppgrtyýýtq_ýýýq ing.yvpd.................................................... ag 4 Kent Howard -VY Notice of Acceptability and Opportunity toRequest Hearing.wpd Page ~j1 Vermont Yankee Nuclear Power Station cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. David R. Lewis Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W.Washington, DC 20037-1128 Mr. David O'Brien, Commissioner Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. James Volz, Chairman Public Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701 Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116 Operating Experience Coordinator Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354 G. Dana Bisbee, Esq.Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108 Ms. Deborah B. Katz P.O. Box 83 Shelburne Falls, MA 01370 Ms. Carla A. White, RRPT, CHP Radiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070 Mr. James M. DeVincentis Manager, Licensing Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Resident Inspector Vermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.Framingham, MA 01702-5399 Jonathan M. Block, Esq.Main Street P.O. Box 566 Putney, VT 05346-0566 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearing.wpd I --- ---- ýAý ---- -P'-!--Kent HQward -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie 5 Vermont Yankee Nuclear Power Station-2-cc: Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwartz Vice President, Operations Support Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500 Mr. James H. Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Ms. Stacey M. Lousteau Treasury Department Entergy Services, Inc.639 Loyola Avenue New Orleans, LA 70113 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301 Mr. William K. Sherman Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Ms. Charlene D. Faison Manager, Licensing 440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Letter to Michael Kansler from Frank Gillespie dated March 21, 2006 KentHoward  
Document Name: VY Notice of Acceptability and Opportunity to Request Hearing.wpd OFFICE     PM:RLRB:DLR             LA:RLRA:DLR               OGC NLO                 BC:RLRB:DLR   D:DLR NAME       JEads                   YEdmonds                 MLemoncelli             JZimmerman   FGillespie (w/comments)
-VY Notice of Acceptability and Opportunityjto ReqyuestHearing.wpd  
DATE       3/21/06                 3/20/06                   3/20/06                 3/21/06       3/21/06
--Page 6  
                                                                                  ....................................................        *N Kent Howard - VY Notice of kýcep!ý1?11_ýtyýaýqpppgrtyýýtq_ýýýq       ing.yvpd                                                         ag 4 Page ~j1 Kent Howard VY Notice of Acceptability and Opportunity toRequest Hearing.wpd Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I               Ms. Carla A. White, RRPT, CHP U.S. Nuclear Regulatory Commission             Radiological Health 475 Allendale Road                             Vermont Department of Health King of Prussia, PA 19406-1415                 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis                             Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W.                             Mr. James M. DeVincentis Washington, DC 20037-1128                       Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David O'Brien, Commissioner                 P.O. Box 0500 Vermont Department of Public Service           185 Old Ferry Road 112 State Street                               Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman                       Vermont Yankee Nuclear Power Station Public Service Board                           U. S. Nuclear Regulatory Commission State of Vermont                               P.O. Box 176 112 State Street                               Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen                   Management Agency Town of Vernon                                 ATTN: James Muckerheide P.O. Box 116                                   400 Worcester Rd.
Vernon, VT 05354-0116                         Framingham, MA 01702-5399 Operating Experience Coordinator               Jonathan M. Block, Esq.
Vermont Yankee Nuclear Power Station           Main Street 320 Governor Hunt Road                         P.O. Box 566 Vernon, VT 05354                               Putney, VT 05346-0566 G. Dana Bisbee, Esq.                           Mr. John F. McCann Deputy Attorney General                       Director, Licensing 33 Capitol Street                             Entergy Nuclear Operations, Inc.
Concord, NH 03301-6937                         440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General                 Mr. Gary J. Taylor One Ashburton Place, 19th Floor               Chief Executive Officer Boston, MA 02108                               Entergy Operations 1340 Echelon Parkway Ms. Deborah B. Katz                           Jackson, MS 39213 P.O. Box 83 Shelburne Falls, MA 01370
 
Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearing.wpd       I --- -   -     -- ýAý---- - P'-!--
Kent HQward VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie 5 Vermont Yankee Nuclear Power Station                           cc:
Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                                 Ms. Stacey M. Lousteau White Plains, NY 10601                             Treasury Department Entergy Services, Inc.
Mr. Oscar Limpias                                   639 Loyola Avenue Vice President, Engineering                         New Orleans, LA 70113 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                                 Mr. Raymond Shadis White Plains, NY 10601                             New England Coalition Post Office Box 98 Mr. Christopher Schwartz                           Edgecomb, ME 04556 Vice President, Operations Support Entergy Nuclear Operations, Inc.                   Mr. James P. Matteau 440 Hamilton Avenue                                 Executive Director White Plains, NY 10601                               Windham Regional Commission 139 Main Street, Suite 505 Mr. Michael J. Colomb                               Brattleboro, VT 05301 Director of Oversight Entergy Nuclear Operations, Inc.                     Mr. William K. Sherman 440 Hamilton Avenue                                 Vermont Department of Public Service White Plains, NY 10601                               112 State Street Drawer 20 Mr. Travis C. McCullough                             Montpelier, VT 05620-2601 Assistant General Counsel Entergy Nuclear Operations, Inc.                     Mr. Michael D. Lyster 440 Hamilton Avenue                                 5931 Barclay Lane White Plains, NY 10601                               Naples, FL 34110-7306 Mr. Jay K. Thayer                                   Ms. Charlene D. Faison Site Vice President                                 Manager, Licensing Entergy Nuclear Operations, Inc.                     440 Hamilton Avenue Vermont Yankee Nuclear Power Station                 White Plains, NY 10601 P.O. Box 0500 185 Old Ferry Road                                   Mr. James Ross Brattleboro, VT 05302-0500                          Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. James H. Sniezek                                Washington, DC 20006-3708 5486 Nithsdale Drive Salisbury, MD 21801 Letter to Michael Kansler from Frank Gillespie dated March 21, 2006
 
KentHoward - VY Notice of Acceptability and Opportunityjto ReqyuestHearing.wpd       -- Page 6


==SUBJECT:==
==SUBJECT:==
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION HARD COPY DLR R/F E-MAIL: JFair RWeisman AMurphy RPettis GGalletti CLi GBagchi SSmith (srs3)SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDlrRlra RidsNrrDIrRIrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff JEads JRowley RLaufer JShea CAnderson, RI MSykes, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MLemoncelli RidsOpaMail Kent Howard -VY Notice ofýýýptý!ý!ityeýndppppqygitylq_ý( yest ipg..Wpd.............  
DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION HARD COPY DLR R/F E-MAIL:
.... r f .......... ..... .... ..... ..... ...... .H Plage 7.e ... ...w d V Noie fAc ptaityad pp tntyoReus
JFair RWeisman AMurphy RPettis GGalletti CLi GBagchi SSmith (srs3)
..ea... ... ng.. .wp...Page.7..
SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDlrRlra RidsNrrDIrRIrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff JEads JRowley RLaufer JShea CAnderson, RI MSykes, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MLemoncelli RidsOpaMail
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone Schedule Actual Receive License Renewal (LR) Application 01/27/2006 01/27/06 Federal Register Notice (FRN) Published  
 
-Receipt & Availability Review 01/31/2006 01/31/06 Public Information Meeting -LR Process & Safety Review Overview 03/01/2006 03/01/06 FRN Published  
                                                                                        ............. . ... r f * ..........   *I=..... .... ..... ..... ...... .H Kent Howard - VY Notice ofýýýptý!ý!ityeýndppppqygitylq_ý(          yest      ipg..Wpd                                                                    Plage 7
-Acceptability/Opportunity for Hearing 03/28/2006 Audit -Aging Management Programs (AMPs) 04/17/2006 FRN Published  
.e   ...w d ...V   Noie fAc     ptaityad
-Intent/Environmental Scoping Meeting 04/21/2006 Audit -Scoping and Screening Methodology 04/24/2006 Public Exit Meeting -Scoping & Screening Methodology Audit 04/28/2006 Audit -Aging Management Reviews (AMRs) 05/15/2006 Environmental Site Audit 05/221/2006 Deadline for Filing Hearing Requests and Petitions for Intervention 05/27/2006 Public Meeting -Environmental Scoping 06/07/2006 Environmental Scoping Periods Ends 06/23/2006 Public Exit Meeting -AMP/AMR Audit 06/28/2006 Environmental Requests for Additional information (RAIs) -Issued 07/14/2006 Environmental RAIs -Responses Received 09/01/2006 Safety RAIs -Issued 10/01/2006 Safety RAI -Responses Received 11/01/2006 Inspection  
                                      ..         . tntyoReus pp    ..               ea...ng...wp...Page.7..
-Scoping and Screening/AMP 11/ /2006 Public Exit Meeting -Scoping & Screening/AMP Inspections 12/ /2006 Draft Supplemental Environmental Impact Statement (SEIS) Issued 12/15/2006 FRN Published  
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone                                                                             Schedule                   Actual Receive License Renewal (LR) Application                                             01/27/2006             01/27/06 Federal Register Notice (FRN) Published - Receipt & Availability Review             01/31/2006             01/31/06 Public Information Meeting - LR Process & Safety Review Overview                     03/01/2006             03/01/06 FRN Published - Acceptability/Opportunity for Hearing                               03/28/2006 Audit - Aging Management Programs (AMPs)                                             04/17/2006 FRN Published - Intent/Environmental Scoping Meeting                                 04/21/2006 Audit - Scoping and Screening Methodology                                           04/24/2006 Public Exit Meeting - Scoping & Screening Methodology Audit                         04/28/2006 Audit - Aging Management Reviews (AMRs)                                             05/15/2006 Environmental Site Audit                                                             05/221/2006 Deadline for Filing Hearing Requests and Petitions for Intervention                 05/27/2006 Public Meeting - Environmental Scoping                                               06/07/2006 Environmental Scoping Periods Ends                                                   06/23/2006 Public Exit Meeting - AMP/AMR Audit                                                 06/28/2006 Environmental Requests for Additional information (RAIs) - Issued                   07/14/2006 Environmental RAIs - Responses Received                                             09/01/2006 Safety RAIs - Issued                                                                 10/01/2006 Safety RAI - Responses Received                                                     11/01/2006 Inspection - Scoping and Screening/AMP                                               11/ /2006 Public Exit Meeting - Scoping & Screening/AMP Inspections                           12/ /2006 Draft Supplemental Environmental Impact Statement (SEIS) Issued                     12/15/2006 FRN Published - Availability/Comment on draft SEIS                                   12/22/2006 Public Meeting - draft SEIS                                                         01/31/2007 End of draft SEIS Comment Period                                                     03/07/2007 Safety Evaluation Report (SER) with Open Item(s) - Issued                           04/01/2007 ACRS Subcommittee Meeting on SER with Open Item(s)                                   05/ /2007 SER Open Item(s) - Response(s) Received                                             06/01/2007 SER - Issued                                                                         08/01/2007 Final SEIS - Issued                                                                 08/03/2007 FRN Published - Availability of Final SEIS                                           08/10/2007 ACRS Full Committee Meeting on SER                                                   09/ /2007 Decision - Director, NRR (license issued, if approved and no hearing                 11/27/2007 is granted - 22 months)
-Availability/Comment on draft SEIS 12/22/2006 Public Meeting -draft SEIS 01/31/2007 End of draft SEIS Comment Period 03/07/2007 Safety Evaluation Report (SER) with Open Item(s) -Issued 04/01/2007 ACRS Subcommittee Meeting on SER with Open Item(s) 05/ /2007 SER Open Item(s) -Response(s)
Commission Decision (if hearing is granted - 30 months)                             07/27/2008 Enclosure 1
Received 06/01/2007 SER -Issued 08/01/2007 Final SEIS -Issued 08/03/2007 FRN Published  
 
-Availability of Final SEIS 08/10/2007 ACRS Full Committee Meeting on SER 09/ /2007 Decision -Director, NRR (license issued, if approved and no hearing 11/27/2007 is granted -22 months)Commission Decision (if hearing is granted -30 months) 07/27/2008 Enclosure 1
                                                                                  . . ........ ...... . . . ... . ........   . .. . I Kent Howard - VY Notice of Acqepjaýifity,ýnq Oppqiju!ýyy to qe9ye        igg-wpq                                            Eagý81 Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd Page~
Kent Howard -VY Notice of Acqepjaýifity,ýnq Oppqiju!ýyy to qe9ye igg-wpq.......... ...... ...... ......... ... .I Eagý81 Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Page~7590-01 -P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.VERMONT YANKEE NUCLEAR POWER STATION NOTICE OF ACCEPTANCE FOR DOCKETING OF THE APPLICATION AND NOTICE OF OPPORTUNITY FOR HEARING REGARDING RENEWAL OF FACILITY OPERATING LICENSE NO. DPR-28 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NO. 50-271 The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering an application for the renewal of Operating License No. DPR-28, which authorizes Entergy Nuclear Operations, Inc., to operate the Vermont Yankee Nuclear Power Station at 1912 megawatts (MWt) thermal. The renewed license would authorize the applicant to operate the Vermont Yankee Nuclear Power Station for an additional 20 years beyond the period specified in the current license. The current operating license for the Vermont Yankee Nuclear Power Station expires on March 21, 2012.The Commission's staff received the application dated January 25, 2006, as supplemented by letter dated March 15, 2006, from Entergy Nuclear Operations, Inc., pursuant to 10 CFR Part 54, to renew the Operating License No. DPR-28 for Vermont Yankee Nuclear Power Station. A Notice of Receipt and Availability of the license renewal application, "Entergy Nuclear Operations, Inc. Notice of Receipt and Availability of Application for Renewal of Vermont Yankee Nuclear Power Station Facility Operating License No. DPR-28 for an Additional 20-Year Period," was published in the Federal Register on February 6, 2006 (71 FR 6102).The Commission's staff has determined that Entergy Nuclear Operations, Inc. has Enclosure 2 8 Keýnt HQwýrd--yY N6tic-e of Acce'p-t-a-bi I ity an d Opp6 rtu_'nity_'to_
7590-01 -P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.
A-e-q-de's-i H' e a rinq.wpid Page 9t Kent Hgward -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Page 9 tI I submitted sufficient information in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, and 51.53(c), and the application is acceptable for docketing.
VERMONT YANKEE NUCLEAR POWER STATION NOTICE OF ACCEPTANCE FOR DOCKETING OF THE APPLICATION AND NOTICE OF OPPORTUNITY FOR HEARING REGARDING RENEWAL OF FACILITY OPERATING LICENSE NO. DPR-28 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NO. 50-271 The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering an application for the renewal of Operating License No. DPR-28, which authorizes Entergy Nuclear Operations, Inc., to operate the Vermont Yankee Nuclear Power Station at 1912 megawatts (MWt) thermal. The renewed license would authorize the applicant to operate the Vermont Yankee Nuclear Power Station for an additional 20 years beyond the period specified in the current license. The current operating license for the Vermont Yankee Nuclear Power Station expires on March 21, 2012.
The current Docket No. 50-271 for Operating License No. DPR-28 will be retained.
The Commission's staff received the application dated January 25, 2006, as supplemented by letter dated March 15, 2006, from Entergy Nuclear Operations, Inc., pursuant to 10 CFR Part 54, to renew the Operating License No. DPR-28 for Vermont Yankee Nuclear Power Station. A Notice of Receipt and Availability of the license renewal application, "Entergy Nuclear Operations, Inc. Notice of Receipt and Availability of Application for Renewal of Vermont Yankee Nuclear Power Station Facility Operating License No. DPR-28 for an Additional 20-Year Period," was published in the FederalRegister on February 6, 2006 (71 FR 6102).
The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application.
The Commission's staff has determined that Entergy Nuclear Operations, Inc. has Enclosure 2 8
Before issuance of each requested renewed license, the NRC will have made the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
 
In accordance with 10 CFR 54.29, the NRC will issue a renewed license on the basis of its review if it finds that actions have been identified and have been or will be taken with respect to: (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified as requiring aging management review, and (2) time-limited aging analyses that have been identified as requiring review, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis (CLB), and that any changes made to the plant's CLB comply with the Act and the Commission's regulations.
Keýnt HQwýrd--yY N6tic-e of Acce'p-t-a-bi Iity an d Opp6 rtu_'nity_'to_ A-e-q-de's-i H'e a rinq.wpid               Page Kent Hgward -VY Notice of Acceptability and Opportunity to Request Hearing.wpd                                     Page 9t 9tII submitted sufficient information in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, and 51.53(c), and the application is acceptable for docketing. The current Docket No. 50-271 for Operating License No. DPR-28 will be retained. The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application.
Additionally, in accordance with 10 CFR 51.95(c), the NRC will prepare an environmental impact statement that is a supplement to the Commission's NUREG-1437,"Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants," dated May 1996. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold a public scoping meeting. Detailed information regarding this meeting will be the subject of a separate Federal Register notice.9 Kent Howard -VY Notice of Accpptaýility anq_9pp.9q40i yLoRequ( t ing.wpq P age 1 0 Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie io~I Within 60 days after the date of publication of this Federal Register Notice, the applicant may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at http://www.nrc.qov/readinq-rm/adams.html.
Before issuance of each requested renewed license, the NRC will have made the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. In accordance with 10 CFR 54.29, the NRC will issue a renewed license on the basis of its review if it finds that actions have been identified and have been or will be taken with respect to: (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified as requiring aging management review, and (2) time-limited aging analyses that have been identified as requiring review, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis (CLB), and that any changes made to the plant's CLB comply with the Act and the Commission's regulations.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's PDR reference staff by telephone at 1-800-397-4209, or by e-mail at pdr@nrc.gov.
Additionally, in accordance with 10 CFR 51.95(c), the NRC will prepare an environmental impact statement that is a supplement to the Commission's NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants,"
If a request for a hearing/petition for leave to intervene is filed within the 60-day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request/petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing/petition for leave to intervene is filed within the 60-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR Parts 51 and 54, renew the license without further notice.As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding, taking into consideration the limited scope of matters that may be considered pursuant to 10 CFR Parts 51 and 54. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the 10 Kent Howard -VY Notice of Acceptability and Opportunityto Request Hearing.wpd .Page 11i following factors: (1) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest.
dated May 1996. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold a public scoping meeting. Detailed information regarding this meeting will be the subject of a separate FederalRegister notice.
The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.
9
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.
 
In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact.' Contentions shall be limited to matters within the scope of the action under consideration.
Kent Howard - VY Notice of Accpptaýility anq_9pp.9q40i yLoRequ( t           ing.wpq                               P age io~I 10 Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie Within 60 days after the date of publication of this FederalRegister Notice, the applicant may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part
The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.The Commission requests that each contention be given a separate numeric or alpha designation within one of the following groups: (1) technical (primarily related to safety concerns);  
: 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at http://www.nrc.qov/readinq-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's PDR reference staff by telephone at 1-800-397-4209, or by e-mail at pdr@nrc.gov. If a request for a hearing/petition for leave to intervene is filed within the 60-day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request/petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing/petition for leave to intervene is filed within the 60-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR Parts 51 and 54, renew the license without further notice.
(2) environmental; or (3) miscellaneous.
As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding, taking into consideration the limited scope of matters that may be considered pursuant to 10 CFR Parts 51 and 54. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the 10
As specified in 10 CFR 2.309, if two or more requestors/petitioners seek to co-sponsor a'To the extent that the application contains attachments and supporting documents that are not publicly available because they are asserted to contain safeguards or proprietary information, petitioners desiring access to this information should contact the applicant or applicant's counsel to discuss the need for a protective order.11 Kent Howard -VY Notice ot Acceptability and gppgqqqity,ýýýý_qqq§ý_ýpýriqg.wp Page 12 t...........................................
 
v ...... ,1 Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie 12t1 contention or propose substantially the same contention, the requestors/petitioners will be required to jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention.
Kent Howard - VY Notice of Acceptability and Opportunityto Request Hearing.wpd                     .Page                 11i following factors: (1) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S.Nuclear Regulatory Commission, Washington, D.C., 20555-0001, Attention:
Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact.' Contentions shall be limited to matters within the scope of the action under consideration. The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.
Rulemaking and Adjudications Staff; (2) courier, express mail, and expedited delivery services:
The Commission requests that each contention be given a separate numeric or alpha designation within one of the following groups: (1) technical (primarily related to safety concerns); (2) environmental; or (3) miscellaneous.
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention:
As specified in 10 CFR 2.309, iftwo or more requestors/petitioners seek to co-sponsor a
Rulemaking and Adjudications Staff; (3) E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, HEARINGDOCKET@NRC.GOV; or (4) facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., Attention:
                        'To the extent that the application contains attachments and supporting documents that are not publicly available because they are asserted to contain safeguards or proprietary information, petitioners desiring access to this information should contact the applicant or applicant's counsel to discuss the need for a protective order.
Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966.2 A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.qov.
11
A copy of the request for hearing and petition for leave to intervene should also be sent to the attorney for the applicant, Mr. Terrence A. Burke, Entergy Nuclear, 1340 Echelon Parkway, mail stop M-ECN-62, Jackson, MS 39213.Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing 2 1f the request/petition is filed by e-mail or facsimile, an original and two copies of the document must be mailed within 2 (two) business days thereafter to the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001; Attention:
 
Rulemaking and Adjudications Staff.12 Kent Howard -VY Notice of Acceptability and Opprtunit, tO Request H.earing.wpd Page 131 Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).
Kent Howard - VY Notice ot Acceptability and gppgqqqity,ýýýý_qqq§ý_ýpýriqg.wp                                                                 Page Pacie 12   12t1t Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd
Detailed information about the license renewal process can be found under the Nuclear Reactors icon at http://www.nrc.qov/reactors/operating/licensinq/renewal.html on the NRC's Web site. Copies of the application to renew the operating license for Vermont Yankee Nuclear Power Station, are available for public inspection at the Commission's PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852-2738, and at http://www.nrc.-ov/reactors/operatinq/licensinq/renewal/applications.html, the NRC's Web site while the application is under review. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents.
                                                                                              .   .......................................... v ......   ,1 contention or propose substantially the same contention, the requestors/petitioners will be required to jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention.
These documents may be accessed through the NRC's Public Electronic Reading Room on the Internet at http:/lwww.nrc.qov/reading-rm/adams.html under ADAMS Accession Number ML060300085.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS may contact the NRC Public Document Room (PDR) Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.qov.
Nuclear Regulatory Commission, Washington, D.C., 20555-0001, Attention: Rulemaking and Adjudications Staff; (2) courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff; (3) E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, HEARINGDOCKET@NRC.GOV; or (4) facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., Attention: Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966.2 A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.qov. A copy of the request for hearing and petition for leave to intervene should also be sent to the attorney for the applicant, Mr. Terrence A. Burke, Entergy Nuclear, 1340 Echelon Parkway, mail stop M-ECN-62, Jackson, MS 39213.
13 Kent Howard -VY Notice of Acceptability and Opportunity to Request Hearinrgwpd_ " Page 14 The staff has verified that a copy of the license renewal application is also available to local residents near the Vermont Yankee Nuclear Power Station at the Vernon Free Library, 567 Governor Hunt Road, Vernon, VT 05354; Brooks Memorial Library, 224 Main Street, Brattleboro, VT 05301; Hinsdale Public Library, 122 Brattleboro Road, Hinsdale, NH 03451; and Dickinson Memorial Library, 115 Main Street, Northfield, MA 01360.Dated at Rockville, Maryland, this 21St day of March, 2006.FOR THE NUCLEAR REGULATORY COMMISSION IRAI Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation 14}}
Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing 2
1f the request/petition is filed by e-mail or facsimile, an original and two copies of the document must be mailed within 2 (two) business days thereafter to the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001; Attention: Rulemaking and Adjudications Staff.
12
 
Kent Howard - VY Notice of Acceptability and Opprtunit, tO Request H.earing.wpd                               Page 131 Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).
Detailed information about the license renewal process can be found under the Nuclear Reactors icon at http://www.nrc.qov/reactors/operating/licensinq/renewal.html on the NRC's Web site. Copies of the application to renew the operating license for Vermont Yankee Nuclear Power Station, are available for public inspection at the Commission's PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852-2738, and at http://www.nrc.-ov/reactors/operatinq/licensinq/renewal/applications.html, the NRC's Web site while the application is under review. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. These documents may be accessed through the NRC's Public Electronic Reading Room on the Internet at http:/lwww.nrc.qov/reading-rm/adams.html under ADAMS Accession Number ML060300085. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS may contact the NRC Public Document Room (PDR) Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.qov.
13
 
Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearinrgwpd_                       "           Page 14 The staff has verified that a copy of the license renewal application is also available to local residents near the Vermont Yankee Nuclear Power Station at the Vernon Free Library, 567 Governor Hunt Road, Vernon, VT 05354; Brooks Memorial Library, 224 Main Street, Brattleboro, VT 05301; Hinsdale Public Library, 122 Brattleboro Road, Hinsdale, NH 03451; and Dickinson Memorial Library, 115 Main Street, Northfield, MA 01360.
Dated at Rockville, Maryland, this 21St day of March, 2006.
FOR THE NUCLEAR REGULATORY COMMISSION IRAI Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation 14}}

Latest revision as of 03:16, 14 March 2020

Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing
ML062120625
Person / Time
Site: Pilgrim, Vermont Yankee  File:NorthStar Vermont Yankee icon.png
Issue date: 03/21/2006
From: Johnny Eads
NRC/NRR/ADRO/DLR/RLRB
To: Anderson C, Bores R, Emch R, Rani Franovich, Gillespie F, Kuo P, Richard Laufer, Louise Lund, Sammy Mccarver, David Mcintyre, Meyer G, Minnick S, Modes M, David Pelton, Rowley J, Diane Screnci, Raeann Shane, James Shea, Neil Sheehan, Undine Shoop, Beth Sienel, Virgilio R, Walker T, Kathy Weaver, White A, Wray J
NRC/EDO
References
%dam200612, TAC MC9669
Download: ML062120625 (18)


Text

Ke nt Howard - VY Notice of Acceptab~ility and Opportun ity t eus ern .Pg From: Johnny Eads To: Beth Sienel; Cliff Anderson; David McIntyre; David Pelton; Diane Screnci; Duncan White; Francis Cameron; Frank Gillespie; Glenn Meyer; Jacob Zimmerman; James Shea; John Wray; Jonathan Rowley; Kathy Weaver; Louise Lund; Mauri Lemoncelli; Michael Modes; Neil Sheehan; Pao-Tsin Kuo; Raeann Shane; Rani Franovich; Richard Emch; Richard Laufer; Rick Ennis; Robert Bores; Rosetta Virgilio; Sammy McCarver; Sheri Minnick; Tracy Walker; Undine Shoop Date: 3/21/2006 4:58:53 PM

Subject:

VY Notice of Acceptability and Opportunity to Request a Hearing FYI, we issued the Notice of Acceptability and Opportunity for Hearing today for VY. It should be published in the Federal Register early next week but is in ADAMS. The press release is in process.

Attached is an electronic version for your information. The renewal review schedule will be updated on the website in the next couple of days.

CC: Michael Morgan

c:\tep\qGW}OOOO1.TMP ...- , Page ii Mail Envelope Properties (44207719.3CE 7 : 35544)

Subject:

VY Notice of Acceptability and Opportunity to Request a Hearing Creation Date 3/21/2006 4:58:49 PM From: Johnny Eads Created By: JHE@nrc.gov Recipients nrc.gov ATLPO.ATLDO MJM2 CC (Michael Morgan) nrc.gov OWGWPO02.HQGWDO01 FPG (Frank Gillespie)

PTK (Pao-Tsin Kuo)

RLE (Richard Emch)

RLF2 (Rani Franovich) nrc.gov TWGWPO01.HQGWDO01 DTM (David McIntyre)

JGR (Jonathan Rowley)

LXL (Louise Lund)

RJL (Richard Laufer) nrc.gov TWGWPO02.HQGWDO01 JJS (James Shea)

KDW (Kathy Weaver)

RMS2 (Raeann Shane)

ROV (Rosetta Virgilio)

USS (Undine Shoop) nrc.gov kpl-po.KPDO ADW (Duncan White)

BEK (Beth Sienel)

CJA (Cliff Anderson)

DLP1 (David Pelton)

DPS (Diane Screnci)

GWM (Glenn Meyer)

JRW3 (John Wray)

Page 211 c:\ternp~GW}OOOO1.TMP c:\teMpýGWI00001_.TMP -ag --

MCM (Michael Modes)

NAS (Neil Sheehan)

RJB (Robert Bores)

SAM9 (Sheri Minnick)

SCM (Sammy McCarver)

TEW (Tracy Walker) nrc.gov owf4_po.OWFNDO RXE (Rick Ennis) nrc.gov owf5_po.OWFNDO FXC (Francis Cameron)

JIZ (Jacob Zimmerman)

MTL1 (Mauri Lemoncelli)

Post Office Route ATLPO.ATLDO nrc.gov OWGWPOO2.HQGWDOO1 nrc.gov TWGWPOO1.HQGWDO01 nrc.gov TWGWPO02.HQGWDO01 nrc.gov kpl-po.KPDO nrc.gov owf4_po.OWFNDO nrc.gov owf5_po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 740 3/21/2006 4:58:49 PM VY Notice of Acceptability and Opportunity to Request Hearing.wpd 70224 3/21/2006 4:49:50 PM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered

31 eW}OO Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Kent Ho.Nard---VY Notice of AicceptabiIlity and 9pportu9jtyt9_Requqýt Hearing.wpd Page 1 Kent Ho.ward VY Notice of Acdeptability and Opportunity to Request Hearing.wpd Pa March 21, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION

Dear Mr. Kansler:

By letter dated on January 25, 2006, as supplemented by letter dated March 15, 2006, the U.S.

Nuclear Regulatory Commission (NRC) received the Entergy Nuclear Operations, Inc.

application for renewal of Operating License No. DPR-28 for the Vermont Yankee Nuclear Power Station. Notice of receipt of this application was published in the FederalRegisteron February 6, 2006 (71 FR 6102). The purpose of this letter is to provide the results of the NRC staff's acceptance review of the license renewal application for the Vermont Yankee Nuclear Power Station. During the acceptance review, the NRC staff determines whether or not the application is sufficiently complete to allow the staff to proceed with its review.

The NRC staff has reviewed your request following the guidance in NUREG-1 800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," and NUREG-1 555, "Environmental Standard Review Plan." As a result, the NRC Staff has determined that the application is complete and is acceptable for docketing, in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23 and 51.53(c). However, the staff's determination does not preclude requests for additional information as the review proceeds.

This letter forwards the staff's safety and environmental review schedule for the Vermont Yankee Nuclear Power Station license renewal application (Enclosure 1). The NRC staff will follow established review procedures and the enclosed schedule to complete the safety and environmental reviews required by 10 CFR Parts 54 and 51, respectively. This schedule has been established in accordance with a 30-month review plan, which includes time to conduct a hearing should a hearing be requested and granted. Milestones for hearing activities are not included in the enclosed schedule because these dates will, if necessary, be established by the Commission or Atomic Safety and Licensing Board.

I would like to stress that this is a very detailed and thorough review. The NRC staff will make every effort to meet the schedule milestones. We request that you inform the staff as early as possible should potential delays arise in your support of the schedule.

Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pa qe Kent Howard VY Notice of Ac&e~tabiliiy and Opportunity to Request Hearing.wpd Page 2l~

M. Kansler Finally, we have also enclosed, for your information, a copy of the notice relating to your application that is being sent to the Office of the FederalRegisterfor publication (Enclosure 2).

If you have any questions on this matter, please contact Johnny Eads, License Renewal Senior Project Manager for the Vermont Yankee Nuclear Power Station, by telephone at 301-415-1471 or via e-mail at JHE@nrc.qov.

Sincerely, IRA!

Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

As stated cc w/encls: See next page

Document Name: VY Notice of Acceptability and Opportunity to Request Hearing.wpd OFFICE PM:RLRB:DLR LA:RLRA:DLR OGC NLO BC:RLRB:DLR D:DLR NAME JEads YEdmonds MLemoncelli JZimmerman FGillespie (w/comments)

DATE 3/21/06 3/20/06 3/20/06 3/21/06 3/21/06

.................................................... *N Kent Howard - VY Notice of kýcep!ý1?11_ýtyýaýqpppgrtyýýtq_ýýýq ing.yvpd ag 4 Page ~j1 Kent Howard VY Notice of Acceptability and Opportunity toRequest Hearing.wpd Vermont Yankee Nuclear Power Station cc:

Regional Administrator, Region I Ms. Carla A. White, RRPT, CHP U.S. Nuclear Regulatory Commission Radiological Health 475 Allendale Road Vermont Department of Health King of Prussia, PA 19406-1415 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W. Mr. James M. DeVincentis Washington, DC 20037-1128 Manager, Licensing Vermont Yankee Nuclear Power Station Mr. David O'Brien, Commissioner P.O. Box 0500 Vermont Department of Public Service 185 Old Ferry Road 112 State Street Brattleboro, VT 05302-0500 Montpelier, VT 05620-2601 Resident Inspector Mr. James Volz, Chairman Vermont Yankee Nuclear Power Station Public Service Board U. S. Nuclear Regulatory Commission State of Vermont P.O. Box 176 112 State Street Vernon, VT 05354 Montpelier, VT 05620-2701 Director, Massachusetts Emergency Chairman, Board of Selectmen Management Agency Town of Vernon ATTN: James Muckerheide P.O. Box 116 400 Worcester Rd.

Vernon, VT 05354-0116 Framingham, MA 01702-5399 Operating Experience Coordinator Jonathan M. Block, Esq.

Vermont Yankee Nuclear Power Station Main Street 320 Governor Hunt Road P.O. Box 566 Vernon, VT 05354 Putney, VT 05346-0566 G. Dana Bisbee, Esq. Mr. John F. McCann Deputy Attorney General Director, Licensing 33 Capitol Street Entergy Nuclear Operations, Inc.

Concord, NH 03301-6937 440 Hamilton Avenue White Plains, NY 10601 Chief, Safety Unit Office of the Attorney General Mr. Gary J. Taylor One Ashburton Place, 19th Floor Chief Executive Officer Boston, MA 02108 Entergy Operations 1340 Echelon Parkway Ms. Deborah B. Katz Jackson, MS 39213 P.O. Box 83 Shelburne Falls, MA 01370

Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearing.wpd I --- - - -- ýAý---- - P'-!--

Kent HQward VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie 5 Vermont Yankee Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Ms. Stacey M. Lousteau White Plains, NY 10601 Treasury Department Entergy Services, Inc.

Mr. Oscar Limpias 639 Loyola Avenue Vice President, Engineering New Orleans, LA 70113 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Mr. Raymond Shadis White Plains, NY 10601 New England Coalition Post Office Box 98 Mr. Christopher Schwartz Edgecomb, ME 04556 Vice President, Operations Support Entergy Nuclear Operations, Inc. Mr. James P. Matteau 440 Hamilton Avenue Executive Director White Plains, NY 10601 Windham Regional Commission 139 Main Street, Suite 505 Mr. Michael J. Colomb Brattleboro, VT 05301 Director of Oversight Entergy Nuclear Operations, Inc. Mr. William K. Sherman 440 Hamilton Avenue Vermont Department of Public Service White Plains, NY 10601 112 State Street Drawer 20 Mr. Travis C. McCullough Montpelier, VT 05620-2601 Assistant General Counsel Entergy Nuclear Operations, Inc. Mr. Michael D. Lyster 440 Hamilton Avenue 5931 Barclay Lane White Plains, NY 10601 Naples, FL 34110-7306 Mr. Jay K. Thayer Ms. Charlene D. Faison Site Vice President Manager, Licensing Entergy Nuclear Operations, Inc. 440 Hamilton Avenue Vermont Yankee Nuclear Power Station White Plains, NY 10601 P.O. Box 0500 185 Old Ferry Road Mr. James Ross Brattleboro, VT 05302-0500 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. James H. Sniezek Washington, DC 20006-3708 5486 Nithsdale Drive Salisbury, MD 21801 Letter to Michael Kansler from Frank Gillespie dated March 21, 2006

KentHoward - VY Notice of Acceptability and Opportunityjto ReqyuestHearing.wpd -- Page 6

SUBJECT:

DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING, PROPOSED REVIEW SCHEDULE, AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM ENTERGY NUCLEAR OPERATIONS, INC. FOR RENEWAL OF THE OPERATING LICENSE FOR THE VERMONT YANKEE NUCLEAR POWER STATION HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti CLi GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDlrRlra RidsNrrDIrRIrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff JEads JRowley RLaufer JShea CAnderson, RI MSykes, RI DScrenci, RI MModes, RI DPelton, Sr. Resident MLemoncelli RidsOpaMail

............. . ... r f * .......... *I=..... .... ..... ..... ...... .H Kent Howard - VY Notice ofýýýptý!ý!ityeýndppppqygitylq_ý( yest ipg..Wpd Plage 7

.e ...w d ...V Noie fAc ptaityad

.. . tntyoReus pp .. ea...ng...wp...Page.7..

VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestone Schedule Actual Receive License Renewal (LR) Application 01/27/2006 01/27/06 Federal Register Notice (FRN) Published - Receipt & Availability Review 01/31/2006 01/31/06 Public Information Meeting - LR Process & Safety Review Overview 03/01/2006 03/01/06 FRN Published - Acceptability/Opportunity for Hearing 03/28/2006 Audit - Aging Management Programs (AMPs) 04/17/2006 FRN Published - Intent/Environmental Scoping Meeting 04/21/2006 Audit - Scoping and Screening Methodology 04/24/2006 Public Exit Meeting - Scoping & Screening Methodology Audit 04/28/2006 Audit - Aging Management Reviews (AMRs) 05/15/2006 Environmental Site Audit 05/221/2006 Deadline for Filing Hearing Requests and Petitions for Intervention 05/27/2006 Public Meeting - Environmental Scoping 06/07/2006 Environmental Scoping Periods Ends 06/23/2006 Public Exit Meeting - AMP/AMR Audit 06/28/2006 Environmental Requests for Additional information (RAIs) - Issued 07/14/2006 Environmental RAIs - Responses Received 09/01/2006 Safety RAIs - Issued 10/01/2006 Safety RAI - Responses Received 11/01/2006 Inspection - Scoping and Screening/AMP 11/ /2006 Public Exit Meeting - Scoping & Screening/AMP Inspections 12/ /2006 Draft Supplemental Environmental Impact Statement (SEIS) Issued 12/15/2006 FRN Published - Availability/Comment on draft SEIS 12/22/2006 Public Meeting - draft SEIS 01/31/2007 End of draft SEIS Comment Period 03/07/2007 Safety Evaluation Report (SER) with Open Item(s) - Issued 04/01/2007 ACRS Subcommittee Meeting on SER with Open Item(s) 05/ /2007 SER Open Item(s) - Response(s) Received 06/01/2007 SER - Issued 08/01/2007 Final SEIS - Issued 08/03/2007 FRN Published - Availability of Final SEIS 08/10/2007 ACRS Full Committee Meeting on SER 09/ /2007 Decision - Director, NRR (license issued, if approved and no hearing 11/27/2007 is granted - 22 months)

Commission Decision (if hearing is granted - 30 months) 07/27/2008 Enclosure 1

. . ........ ...... . . . ... . ........ . .. . I Kent Howard - VY Notice of Acqepjaýifity,ýnq Oppqiju!ýyy to qe9ye igg-wpq Eagý81 Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd Page~

7590-01 -P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.

VERMONT YANKEE NUCLEAR POWER STATION NOTICE OF ACCEPTANCE FOR DOCKETING OF THE APPLICATION AND NOTICE OF OPPORTUNITY FOR HEARING REGARDING RENEWAL OF FACILITY OPERATING LICENSE NO. DPR-28 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NO. 50-271 The U.S. Nuclear Regulatory Commission (NRC or the Commission) is considering an application for the renewal of Operating License No. DPR-28, which authorizes Entergy Nuclear Operations, Inc., to operate the Vermont Yankee Nuclear Power Station at 1912 megawatts (MWt) thermal. The renewed license would authorize the applicant to operate the Vermont Yankee Nuclear Power Station for an additional 20 years beyond the period specified in the current license. The current operating license for the Vermont Yankee Nuclear Power Station expires on March 21, 2012.

The Commission's staff received the application dated January 25, 2006, as supplemented by letter dated March 15, 2006, from Entergy Nuclear Operations, Inc., pursuant to 10 CFR Part 54, to renew the Operating License No. DPR-28 for Vermont Yankee Nuclear Power Station. A Notice of Receipt and Availability of the license renewal application, "Entergy Nuclear Operations, Inc. Notice of Receipt and Availability of Application for Renewal of Vermont Yankee Nuclear Power Station Facility Operating License No. DPR-28 for an Additional 20-Year Period," was published in the FederalRegister on February 6, 2006 (71 FR 6102).

The Commission's staff has determined that Entergy Nuclear Operations, Inc. has Enclosure 2 8

Keýnt HQwýrd--yY N6tic-e of Acce'p-t-a-bi Iity an d Opp6 rtu_'nity_'to_ A-e-q-de's-i H'e a rinq.wpid Page Kent Hgward -VY Notice of Acceptability and Opportunity to Request Hearing.wpd Page 9t 9tII submitted sufficient information in accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, and 51.53(c), and the application is acceptable for docketing. The current Docket No. 50-271 for Operating License No. DPR-28 will be retained. The docketing of the renewal application does not preclude requesting additional information as the review proceeds, nor does it predict whether the Commission will grant or deny the application.

Before issuance of each requested renewed license, the NRC will have made the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. In accordance with 10 CFR 54.29, the NRC will issue a renewed license on the basis of its review if it finds that actions have been identified and have been or will be taken with respect to: (1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified as requiring aging management review, and (2) time-limited aging analyses that have been identified as requiring review, such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis (CLB), and that any changes made to the plant's CLB comply with the Act and the Commission's regulations.

Additionally, in accordance with 10 CFR 51.95(c), the NRC will prepare an environmental impact statement that is a supplement to the Commission's NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants,"

dated May 1996. Pursuant to 10 CFR 51.26, and as part of the environmental scoping process, the staff intends to hold a public scoping meeting. Detailed information regarding this meeting will be the subject of a separate FederalRegister notice.

9

Kent Howard - VY Notice of Accpptaýility anq_9pp.9q40i yLoRequ( t ing.wpq P age io~I 10 Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd Pacie Within 60 days after the date of publication of this FederalRegister Notice, the applicant may file a request for a hearing, and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene with respect to the renewal of the license. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part

2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 and is accessible from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at http://www.nrc.qov/readinq-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's PDR reference staff by telephone at 1-800-397-4209, or by e-mail at pdr@nrc.gov. If a request for a hearing/petition for leave to intervene is filed within the 60-day period, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel will rule on the request/petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. In the event that no request for a hearing/petition for leave to intervene is filed within the 60-day period, the NRC may, upon completion of its evaluations and upon making the findings required under 10 CFR Parts 51 and 54, renew the license without further notice.

As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding, taking into consideration the limited scope of matters that may be considered pursuant to 10 CFR Parts 51 and 54. The petition must specifically explain the reasons why intervention should be permitted with particular reference to the 10

Kent Howard - VY Notice of Acceptability and Opportunityto Request Hearing.wpd .Page 11i following factors: (1) the nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the requestor's/petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any decision or order which may be entered in the proceeding on the requestor's/petitioner's interest. The petition must also set forth the specific contentions which the petitioner/requestor seeks to have litigated at the proceeding.

Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases of each contention and a concise statement of the alleged facts or the expert opinion that supports the contention on which the requestor/petitioner intends to rely in proving the contention at the hearing. The requestor/petitioner must also provide references to those specific sources and documents of which the requestor/petitioner is aware and on which the requestor/petitioner intends to rely to establish those facts or expert opinion. The requestor/petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact.' Contentions shall be limited to matters within the scope of the action under consideration. The contention must be one that, if proven, would entitle the requestor/petitioner to relief. A requestor/petitioner who fails to satisfy these requirements with respect to at least one contention will not be permitted to participate as a party.

The Commission requests that each contention be given a separate numeric or alpha designation within one of the following groups: (1) technical (primarily related to safety concerns); (2) environmental; or (3) miscellaneous.

As specified in 10 CFR 2.309, iftwo or more requestors/petitioners seek to co-sponsor a

'To the extent that the application contains attachments and supporting documents that are not publicly available because they are asserted to contain safeguards or proprietary information, petitioners desiring access to this information should contact the applicant or applicant's counsel to discuss the need for a protective order.

11

Kent Howard - VY Notice ot Acceptability and gppgqqqity,ýýýý_qqq§ý_ýpýriqg.wp Page Pacie 12 12t1t Kent Howard VY Notice of Acceptability and Opportunity to Request Hearing.wpd

. .......................................... v ...... ,1 contention or propose substantially the same contention, the requestors/petitioners will be required to jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention.

Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for a hearing or a petition for leave to intervene must be filed by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S.

Nuclear Regulatory Commission, Washington, D.C., 20555-0001, Attention: Rulemaking and Adjudications Staff; (2) courier, express mail, and expedited delivery services: Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff; (3) E-mail addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, HEARINGDOCKET@NRC.GOV; or (4) facsimile transmission addressed to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., Attention: Rulemakings and Adjudications Staff at 301-415-1101, verification number is 301-415-1966.2 A copy of the request for hearing and petition for leave to intervene must also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001, and it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.qov. A copy of the request for hearing and petition for leave to intervene should also be sent to the attorney for the applicant, Mr. Terrence A. Burke, Entergy Nuclear, 1340 Echelon Parkway, mail stop M-ECN-62, Jackson, MS 39213.

Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing 2

1f the request/petition is filed by e-mail or facsimile, an original and two copies of the document must be mailed within 2 (two) business days thereafter to the Secretary, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001; Attention: Rulemaking and Adjudications Staff.

12

Kent Howard - VY Notice of Acceptability and Opprtunit, tO Request H.earing.wpd Page 131 Board that the petition, request and/or contentions should be granted based on a balancing of the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).

Detailed information about the license renewal process can be found under the Nuclear Reactors icon at http://www.nrc.qov/reactors/operating/licensinq/renewal.html on the NRC's Web site. Copies of the application to renew the operating license for Vermont Yankee Nuclear Power Station, are available for public inspection at the Commission's PDR, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852-2738, and at http://www.nrc.-ov/reactors/operatinq/licensinq/renewal/applications.html, the NRC's Web site while the application is under review. The NRC maintains an Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. These documents may be accessed through the NRC's Public Electronic Reading Room on the Internet at http:/lwww.nrc.qov/reading-rm/adams.html under ADAMS Accession Number ML060300085. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS may contact the NRC Public Document Room (PDR) Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.qov.

13

Kent Howard - VY Notice of Acceptability and Opportunity to Request Hearinrgwpd_ " Page 14 The staff has verified that a copy of the license renewal application is also available to local residents near the Vermont Yankee Nuclear Power Station at the Vernon Free Library, 567 Governor Hunt Road, Vernon, VT 05354; Brooks Memorial Library, 224 Main Street, Brattleboro, VT 05301; Hinsdale Public Library, 122 Brattleboro Road, Hinsdale, NH 03451; and Dickinson Memorial Library, 115 Main Street, Northfield, MA 01360.

Dated at Rockville, Maryland, this 21St day of March, 2006.

FOR THE NUCLEAR REGULATORY COMMISSION IRAI Frank P. Gillespie, Director Division of License Renewal Office of Nuclear Reactor Regulation 14