Independent Spent Fuel Storage Installation Security Inspection Plan
ML23342A118
Person / Time
Site: Pilgrim
Issue date: 01/09/2024
From: Daniel Schroeder
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Trice K
Holtec Decommissioning International
References
Download: ML23342A118 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406-1415 January 9, 2024 Kelly Trice President - HDI Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

PILGRIM NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Kelly Trice:

The enclosed inspection plan lists the security inspections scheduled through December 31, 2025. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket No. 50-293 License No. DPR-35

Enclosure:

Pilgrim Nuclear Power Station - Independent Spent Fuel Storage Installation Security Inspection Plan Daniel L.

Schroeder Digitally signed by Daniel L. Schroeder Date: 2024.01.09 09:09:59 -05'00'

ML23342A118 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS RI/ DRSS NAME TEck JEdwards ADimitriadis/ad DSchroeder DATE 12/18/2023 12/18/2023 01/03/2024 01/08/2024

Site Inspection Activity Plan 07201044 - Pilgrim Power Station (ISFSI) 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection - Pilgrim 2

11/4/2024 11/8/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 11/6/2023 2:33:16 PM 1 of 1