UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD, SUITE 10 2 KING OF PRUSSIA, PA 19406-1415

February 29, 2024

EA-2024- 023

Kelly Trice President - HDI Holtec Decommissioning International, LLC Krishna P. Singh Campus 1 Holtec Blvd.

Camden, NJ 08104

SUBJECT: HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT NOS. 05000293/2023003 05000293/ 2023004 AND NOTICE OF VIOLATION

Dear Kelly Trice:

On December 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, at the permanently shutdown Pilgrim Nuclear Power Station (PNPS). The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and the conditions of your license. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. The results of the inspection were discussed with Joseph McDonough, Decommissioning Manager, and other members of your staff on January 31, 2024, and are described in the enclosed inspection report.

Based on the results of this inspection, the NRC staff has determined that one Severity Level IV violation of NRC requirements occurred. The violation was evaluated in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRCs Web site at (https://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html). The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the subject inspection report. The violation involved Holtecs failure to establish proper oversight and controls to ensure that expenditures from the decommissioning trust fund (DTF) at Pilgrim were only used for legitimate decommissioning purposes as required by 10 CFR 50.82.

The violation is being cited in the Notice because the NRC determined that the necessary corrective actions are complex and will likely require a review and independent assessment by multiple NRC Offices. Therefore, the NRC is issuing a NOV and is requiring a response from Holtec Decommissioning International (HDI) that describes your actions to ensure that future expenditures from the DTF will meet the requirements of 10 CFR 50.82. In addition, as part of your corrective actions, you are required to describe the actions and timeline to restore the funds that were improperly removed from the DTF. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. If you have additional information that you believe the NRC should consider, you may provide it in your response to the Notice. The NRC review of your response to the Notice will also determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if any, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRCs website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRCs W ebsite at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under Related Information).

You may also obtain these documents by contacting the Government Printing Office (GPO)

toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).

Please contact Katie Barnes of my staff at 610- 337-5323 if you have any questions regarding this matter.

Sincerely, Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security

Docket No.: 05000293 License No. : DPR-35

Enclosure: Notice of Violation Inspection Report No s. 05000293/2023003 and 05000293/ 2023004 w/Attachment

cc w/encl: Distribution via ListServ

EXECUTIVE SUMMARY

Holtec Decommissioning International, LLC (HDI)

Pilgrim Nuclear Power Station (PNPS)

NRC Inspection Report Nos. 05000293/2023003 and 050002 93/2023 004

A routine announced decommissioning inspection was completed on December 31, 2023, at the permanently shut-down Pilgrim Nuclear Power Station (PNPS). The inspection included an assessment of the program for radioactive waste management, effluent and environmental monitoring, transportation of radioactive materials, fire protection, decommissioning performance, and occupational radiation exposure. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. The NRCs program for overseeing the safe decommissioning of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,

Decommissioning Power Reactor Inspection Program.

Additionally, the inspection period included inspection of the PNPS Independent Spent Fuel Storage Installation (ISFSI). The NRCs program for overseeing the operation of dry storage of spent fuel at an Independent Spent Fuel Storage Installation (ISFSI) is described in IMC 2690,

Inspection Program for Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for Title 10 of the Code of Federal Regulations (10 CFR) Part 71 Transportation Packagings.

List of Violations

The inspectors identified one Severity Level IV violation (NOV) of 10 CFR 50.82(a)(8)(i)because HDI expended decommissioning trust funds for expenses that were not for legitimate decommissioning activities. Specifically, HDI used funds to support community outreach activities that were not related to removing the facility or site safely from service and reducing residual activity to a level that permits release of the property for either unrestricted or restricted conditions and termination of the license. HDI entered the issue into its corrective action program as Issue Report (IR) PIL-06871.

REPORT DETAILS

1.0 Background

On June 10, 2019, Entergy Nuclear Operations, Inc. (ENOI) certified cessation of power operations and the permanent removal of fuel from the PNPS reactor vessel (ADAMS Accession Number: ML19161A033). This met the requirements of 10 CFR 50.82(a)(1)(i) and 50.82(a)(1)(ii). On June 11, 201 9, the NRC notified PNPS that the NRC would no longer perform its oversight activities in accordance with the Operating Reactor Assessment Program per IMC 0305 and that oversight would be conducted under the provisions outlined in IMC 2561 Decommissioning Power Reactor Inspection Program (ADAMS Accession No. ML19162A033). On August 27, 2019, an amendment was issued transferring the license from ENOI to Holtec International, LLC., (HDI)

(ADAMS Accession No. ML19235A050). On December 14, 2021, HDI notified the NRC of the permanent removal of all spent fuel assemblies from the spent fuel pool, with their placement in dry storage within the Independent Spent Fuel Storage Installation ( ISFSI)

II cask storage pad (ADAMS Accession No. ML21348A748).

At the time of the inspection, PNPS was in the active decommissioning phase with no fuel in the spent fuel pool, as described in IMC 2561.

2.0 Active Decommissioning Performance and Status Review

2.1 Inspection Procedures 84750, 86750, 83750, and 64704

a. Inspection Scope

The inspectors performed on-site topical inspection activities on September 25-28, October 16-19, and December 11-15, 2023, supplemented by in-office reviews and periodic phone calls. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs.

The inspectors reviewed activities and documentation associated with radioactive effluent control and the radiological environmental monitoring program (REMP) to assess the effectiveness of such programs. The inspectors reviewed the 2022 Annual Radioactive Effluent Release Report and the 2022 Annual Radiological Environmental Operating Report for any anomalous results to determine if reported doses were below regulatory limits. The inspectors reviewed documentation and conducted interviews with site personnel to determine whether radioactive effluents were monitored and quantified, and doses calculated in accordance with the site Offsite Dose Calculation Manual (ODCM).

The inspectors examin ed a selection of environmental monitoring stations to evaluate their location, placement, and material condition. The inspectors observed the collection of several environmental samples, including air monitor filters, sediment, and aquatic foodstuffs to determine if staff followed appropriate site procedures and if sampling was conducted in accordance with the site ODCM. The inspectors conducted walkdowns of accessible portions of the liquid and gaseous waste treatment and monitoring systems to assess their material condition and also discussed the groundwater monitoring p rogram with site personnel and reviewed calibration documentation for the reactor building vent effluent monitor.

The inspectors conducted walkdowns, interviewed personnel, and reviewed documentation to assess the effectiveness of HDIs programs for handling, storage, and transportation of radioactive material. The inspectors conducted walkdowns of radioactive waste and radioactive sealed source storage areas to evaluate the material condition of the containers and discussed radioactive source accountability and leak testing procedures with radiation protection (RP) personnel. The inspectors reviewed a selection of radioactive waste shipping packages, including Type B and shipments of category 2 quantities of material, to determine whether they had been appropriately characterized, classified, and prepared in accordance with procedures and regulatory requirements and whether the category 2 shipments met the requirements for transportation security as outlined in 10 CFR Part 37. The inspectors reviewed a root cause evaluation conducted by the licensee and associated corrective actions taken in response to the identification of several missing sealed sources.

The inspectors reviewed radiation and contamination surveys, air sample results, and soil sample results associated with the demolition of two condensate storage tanks. The inspectors reviewed free-release survey plans and survey results for demolition of the demineralized water storage tank.

The inspectors evaluated HDIs Fire Protection Program (FPP) to determine if it was maintained in a state of operational readiness and if changes made to the program continued to meet commitments, NRC requirements, and if such changes had negatively affected the overall state of the FPP. The inspectors conducted the inspection to determine if the licensee had developed and implemented technically adequate procedures to implement the FPP; if the licensee had proper installation, operability, and maintenance of fire protection systems and equipment; and review the adequacy and implementation of the quality assurance program for the FPP.

The inspectors reviewed the updated fire protection plan and a sample of FPP implementation procedures to assess compliance, to determine if it reflected the current decommissioning status of the facility, and if the program had been appropriately implemented. Procedures reviewed included those controlling storage of combustibles and flammables, conduct of hot-work, ignition sources, and transient combustibles.

Pre-fire plans were evaluated to determine if they were updated and if they reflected the plants decommissioning status. The inspectors reviewed changes to the FPP including decommissioning of systems and the implementation of the incipient fire brigade (offsite response as primary responder). Inspectors conducted walk-downs of several fire areas to determine if plant detection systems, suppression systems, fire barriers, and fire equipment/water sources were maintained and in adequate condition.

Additionally, inspectors reviewed a sample of surveillances that included fire water loop, sprinklers, valves, and extinguishers to determine if they were performed on a periodic basis and were capable of performing their intended function.

The inspectors reviewed a sample of self-assessments and corrective action documents to determine if HDI had appropriately identified deficiencies in the FPP, REMP, radioactive effluent monitoring, and radwaste and shipping programs and if it had entered the issues into the corrective action program for resolution.

b. Observations and Findings

The inspectors determined that effluent releases to the environment had been properly controlled, monitored, and quantified in accordance with NRC requirements. The inspectors noted that the 2022 Annual Radiological Environmental Operating Report (AEROR) and Annual Radioactive Release Report (ARERR) demonstrated that calculated doses were well below the regulatory limits. The inspectors determined that environmental samples were collected in accordance with the ODCM and site procedures and that the placement and condition of environmental air samplers was adequate. The inspectors noted that the only change to the ODCM since the last inspection under this procedure was the addition of three environmental thermoluminescent dosimeters (TLDs) between the ISFSI pad and Rocky Hill Road for additional monitoring.

The inspectors found the observed portions of the liquid and gaseous waste treatment systems to be in adequate material condition. The inspectors noted that the reactor building vent effluent flow monitors that measure airflow through the particulate sample line and total airflow out of the vent had not been calibrated at the frequency specified in the ODCM, and that discrepancies were noted when the calibrations were performed.

The inspectors reviewed impact analyses associated with the discrepancies and determined that any potential impact to calculated effluent releases would have been minimal.

The inspectors observed adequate air monitoring and contamination control during the demolition of condensate storage tank (CST) B. However, the inspectors noted that documented radiological surveys showing the as-left conditions at the conclusion of work were not available for three of the workdays during the demolition. Surveys to release the area following debris clean-up showed no residual contamination. The inspectors evaluated documentation of the discovery of several small pieces of delaminated paint with very low levels of contamination from the interior of the CSTs following the demolition. Specifically, pieces were found outside the work area boundary following the demolition of CST A, and inside a stormwater drainage trough after both tanks had been demolished. The pieces in the drainage trough had been caught by an installed barrier to prevent discharge of debris offsite. HDI entered this condition into its corrective action program as IRs PIL -06861 and PIL-07097. The contaminated pieces remained within the site boundary and there was no impact to public health and safety. The inspectors reviewed air sample data and verified that there was no release of airborne radioactive material to the environment as a result of the demolition.

The inspectors determined that the radioactive waste packages evaluated were properly characterized, prepared, and shipped in accordance with site procedures and regulatory requirements. The inspectors evaluat ed revisions to the site procedures for scaling factors and found them adequate for the current status of the facility. The inspectors found that radioactive waste containers were properly secured and labeled and were in good material condition.

The inspectors found that radioactive sealed sources were stored in appropriately secured and posted areas, and that periodic inventories and leak testing were performed as required by site procedures. During the inspection of sealed source control, the inspectors identified that several sources listed in the tracking database were unable to be accounted for during the most recent inventory. These included two calibration sources of exempt quantity, one calibration source containing approximately 0.5 µCi of Americium-241 and 0.22 µCi of Europium-152, and four sources containing between 7.1 and 8.7 mCi of Ni-63 which were previous ly installed in security equipment. The sources had been identified as missing during a routine inventory that had concluded on September 25, 2023. On October 25, 2023, HDI submitted a report to the NRC in accordance with 10 CFR 20.2201(a)(ii), providing notification of the missing sources.

HDI submitted a 30-day follow up written report on November 22, 2023 (ML23326A275).

The quantities of Am-241 and Ni-63 exceeded the threshold for reporting of 10 times the quantity specified in appendix C to 10 CFR Part 20. After further investigation, HDI located an unlabeled source on site that was determined through gamma spectroscopic analysis to be the missing Am-241/Eu-152 source. Upon further review, it was determined that the Ni-63 sources were exempt from regulatory requirements in accordance with 10 CFR 30.20. HDI entered the missing sources issue into its corrective action program as IR PIL-06692 and performed a root cause analysis and investigation, concluding that the missing exempt sources were likely disposed of as radioactive waste. The inspectors noted that the missing sources present a very low safety risk due to the type and quantity of radioactive material, comparable to the risk from a household smoke detector.

HDIs evaluation of the sealed source control program revealed multiple weaknesses, although an extent of condition review revealed no other missing sources. The inspectors reviewed a revision to the source control procedure and discussed planned corrective actions with site personnel. The inspectors found the corrective actions to be appropriate which will be reviewed during future inspections.

The inspectors determined that HDI maintained the fire protection program in accordance with the requirements and the fire protection plan. The required fire protection detection systems, suppression systems, barriers, and equipment had been maintained and appropriately tested and were in a state of operational readiness to minimize the potential for radiological releases in the event of a fire at the plant.

HDI maintained the leadership, staffing, and training of the onsite incipient fire brigade.

Agreements were appropriately established with the local fire department to be the primary responder for potential onsite fires. Additionally, procedures for response and measures for coordination with offsite responders were appropriately established. The inspectors verified that HDI had conducted training and familiarization with offsite responders.

c. Conclusions

No violations of more than minor safety significance were identified.

2.2 Inspection Procedure 71801

a. Inspection Scope

The inspectors performed plant walkdowns to assess material conditions and housekeeping and observed decommissioning work activities including repairs on the primary segmentation system for reactor vessel internals and demolition of a condensate storage tank. The inspectors discussed current staffing levels with site personnel and reviewed a sample of training and qualifications for various work groups.

The inspectors discussed the decommissioning schedule with site personnel to determine if the schedule was consistent with the post shutdown decommissioning activities report. The inspectors discussed the overall financial status of decommissioning with site personnel and reviewed the status of the decommissioning trust fund to determine whether the funds were used in accordance with the regulatory requirements and if any changes could significantly impact the sites decommissioning financial assurance.

b. Observations and Findings

The inspectors determined that staffing levels were adequate for the site decommissioning status, and that the training and qualifications reviewed were current and in accordance with site procedures. The inspectors noted that during this inspection period the site continued segmentation of reactor vessel internals (RVIs) and anticipated a slowdown in active decommissioning work once the segmentation and packaging of RVIs is completed in 2024. The inspectors observed adequate material condition and housekeeping in the areas of the plant toured.

The inspectors verified that the current status of the decommissioning trust fund is adequate to support the planned decommissioning schedule, and that the current schedule of decommissioning activities is consistent with the most recent update provided to the NRC in accordance with 10 CFR 50.82(a)(7), submitted on November 2, 2023 (ADAMS accession number ML23306A099).

Violation

The inspectors identified one Severity Level IV violation of 10 CFR 50.82(a)(8)(i)because of HDIs failure to establish proper oversight and controls to ensure that expenditures from the decommissioning trust fund (DTF) at Pilgrim were used only for legitimate decommissioning purposes as required. Specifically, HDI used funds to support community outreach activities that were not related to removing the facility or site safely from service and reducing residual activity to a level that permits release of the property for either unrestricted or restricted conditions and termination of the license.

During this inspection period, inspectors reviewed a sampling of the records associated with the expenditures of the DTF, held interviews with site personnel and identified numerous discrepancies. Specifically, the inspectors noted that Holtec had paid community outreach expenditures out of the Pilgrim DTF and determined that approximately $84,0 00.00 had been spent of those reviewed. These expenditures included activities that were not used for legitimate decommissioning activities, such as the local Chamber of Commerce, community Thanksgiving celebration and local community parades.

10 CFR 50.82(a)(8)(i) states, in part, decommissioning trust funds may be used by licensees if the withdrawals are for expenses for legitimate decommissioning activities consistent with the definition of decommissioning in § 50.2.

10 CFR 50.2 defines decommissioning as removing a facility or site safely from service and reducing residual radioactivity to a level that permits

(1) Release of the property for unrestricted use and termination of the license; or
(2) Release of the property under restricted conditions and termination of the license.

Contrary to the above, from September 2020 through September 2022, HDI used the Pilgrim decommissioning trust fund for expenses that were not for legitimate decommissioning activities. Specifically, HDI used funds to support community outreach activities that were not related to removing the facility or site safely from service and reducing residual activity to a level that permits release of the property for either unrestricted or restricted conditions and termination of the license.

This violation was determined to be a Severity Level IV violation. The NRC considered NRC Enforcement Policy example Section 6.3.c.12, dated January 12, 202 4 regarding a significant failure to meet decommissioning as required by regulation or license condition for materials sites. Additionally, the NRC considered the legitimacy of use, the dollar amount involved compared to the total DTF amount, and the programmatic aspects in making this determination. The inspectors determined that approximately $84,000 w as not used for legitimate decommissioning activities, that the amount is a small fraction of the Pilgrim DTF, and did not represent a significant failure to meet decommissioning, HDI initiated corrective actions to restore the funds back to the DTF and entered the issue into its corrective action program as PIL-06871.

This violation meets the criteria in Section 2.3.2.a of the NRC Enforcement Policy to disposition as a Non-Cited Violation (NCV). However, the violation is cited in the enclosed Notice of Violation (Notice) because the NRC considered that the necessary corrective actions are complex and will likely require a review and independent assessment from multiple NRC offices. Therefore, the NRC is issuing a NOV and is requiring a response from HDI that describes a comprehensive corrective action plan for restoring the funds that were improperly removed from the DTF and ensure that future expenditures from the DTF will meet the requirements of 10 CFR 50.82. (NOV 05000293/2023004- 01, Improper Use of Decommissioning Trust Fund).

c. Conclusions

One Severity Level IV NOV of 10 CFR 50.82(a)(8)(i) was identified.

3.0 Independent Spent Fuel Storage Installation (ISFSI)

3.1 Operation of an Independent Spent Fuel Storage Installation (Inspection Procedure 60855)

a. Inspection Scope

The inspectors assessed whether PNPS personnel had been operating and maintaining ISFSI programs in conformance with the commitments and requirements contained in the DSAR, Certificate of Compliance (CoC), Technical Specifications (TS), Quality Assurance ( QA) program, site procedures, and 10 CFR Part 72.

ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors review was directed towards evaluating the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs.

The inspectors observed cask temperature monitoring activities, interviewed personnel, reviewed records and procedures, and performed walk downs. The inspectors also reviewed changes made to PNPS programs and procedures since the last inspection to determine if changes were consistent with the license or CoC and if such changes reduced the effectiveness of the program.

b. Observations and Findings

The inspectors determined that PNPS plans and preparations for controlling radiological activities were effective and in compliance with 10 CFR Part 20 requirements. The inspectors also verified that special nuclear material (SNM) stored at the ISFSI was properly accounted for. The inspectors verified all employees were below the regulatory dose limits and the dose requirements for members of the public at the nearest accessible location to the ISFSI were within limits prescribed by 10 CFR 72.104.

The inspectors determined daily temperature monitoring of the HI-STORM casks was performed by PNPS personnel in accordance with surveillance requirements outlined in the TS. Additionally, the inspectors noted that PNPS procedures contain backup plans if the primary surveillance method was unavailable. The inspectors performed multiple walk-downs of the ISFSI pad and did not note any significant material condition issues that would impact the performance of the pad and loaded casks. The inspectors also verified that transient combustibles were not stored on the ISFSI pad or in the vicinity of the casks and confirmed vehicle entry onto the ISFSI pad was controlled in accordance with site procedures.

c. Conclusions

No violations of more than minor safety significance were identified.

4.0

Exit Meeting Summary

On January 31, 2024, the inspectors presented the inspection results to Joseph McDonough, Decommissioning Manager, and other members of the HDI staff. No proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

J. Moylan - Site Vice President

J. McDonough - Decommissioning Manager

D. Noyes - Senior Compliance Manager

M. Lawson - Radiation Protection Manager

L. Hageman - Chemistry Manager

A. Steward - RP Supervisor

C. Mulkern - Facilities Manager

J. Buckley - Waste Management Lead

J. Voegtli - Waste Shipper (Waste Control Specialists)

R. Hargat - Chemistry Specialist

M. Lefrancois - Engineering Manager

G. Madison - Certified Health Physicist (contractor)

A. Lombardo - RP Superintendent

R. Parke - Remediation Specialist (contractor)

Z. Ares-Delfining - RP Technician

ITEMS OPEN, CLOSED, AND DISCUSSED

Closed Section Summary

05000293/2023004- 01 2.2.b Improper use of Decommissioning

Trust Fund