ML23334A182
From kanterella
Jump to navigation
Jump to search
ML23334A182 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 11/30/2023 |
From: | Noval W Holtec Decommissioning International |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
Download: ML23334A182 (352) | |
Similar Documents at Pilgrim | |
---|---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024
[Table view]Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18 Category:Technical Specification MONTHYEARML23334A1822023-11-30030 November 2023
[Table view]Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 ML19044A5742019-02-0808 February 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications ML18260A0852018-09-13013 September 2018 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications ML17086A1622017-04-0909 April 2017 Correction to Technical Specification Page 5.0-11 ML14349A4952014-12-10010 December 2014 Proposed Change to Technical Specifications Concerning the Safety Limit Minimum Critical Power Ratio ML14003A0462013-12-12012 December 2013 FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel ML11326A1532011-11-0909 November 2011 FSAR Update Revision 28, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Commitment Changes ML1106103972011-02-18018 February 2011 Marked-up and Re-typed Technical Specification and Bases Pages for the Proposed License Amendment Related to Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring Safety Valves (Ssv). ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0734600622007-11-29029 November 2007 Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3) ML0701105012007-01-0404 January 2007 Technical Specification Revisions for Control Rod Operability Scram Insertion Times and Control Rod Accumulator Requirements ML0700404412006-12-27027 December 2006 License Amendment Request for Adoption of TSTF-484 Revision 0, Use TS 3.10.1 for Scram Time Testing Activities ML0530404502005-10-18018 October 2005 Technical Specifications Amendment Request for Single Control Withdrawal Allowances, TS 3/4.14 Special Operations. ML0517204062005-06-0202 June 2005 Technical Specifications Amendment Request to Revise Reactor Coolant System Leakage Detection System Instrumentation Requirements and Actions ML0515204682005-05-24024 May 2005 Request for Amendment to Technical Specification to Remove Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement ML0508205272005-03-22022 March 2005 Technical Specification Pages Re Reporting Requirements ML0426400262004-09-0202 September 2004 License Amendment Request, Technical Specification Changes for Single Recirculation Loop Operation ML0421602262004-07-22022 July 2004 Deletion of Requirement from LCO 3/4.10.D, Multiple Control Rod Removal ML0411302792004-04-14014 April 2004 Request for Amendment to the Technical Specifications Reactor Vessel Hydrostatic and Leak Testing Requirements ML0400606222003-12-24024 December 2003 Application for Technical Specification (TS) Improvement to Delete the TS Requirements for the Hydrogen Analyzers Using the Consolidated Line Item Improvement Process ML0309905332003-03-27027 March 2003 Response to NRC Request for Additional Information Related to Technical Specification Changes to Post-Accident Monitoring Instrumentation Requirement ML0235200712002-12-10010 December 2002 Request for Amendment to the Technical Specifications (Ts), Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1 ML0234402372002-12-0404 December 2002 Proposed Change to Applicability of Pilgrim'S Pressure-Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, & 3.6.3, Revision 1 ML0233002762002-08-19019 August 2002 Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation Requirements ML0224000362002-08-19019 August 2002 Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation Requirements ML0219905242002-07-0505 July 2002 License Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate Request ML0207804112002-03-15015 March 2002 Enclosure -TS Pages and NRC Form 374 ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2023-11-30 Category:Bases Change MONTHYEARML23334A1822023-11-30030 November 2023
[Table view]Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 ML19044A5742019-02-0808 February 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications ML18260A0852018-09-13013 September 2018 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications ML14349A4952014-12-10010 December 2014 Proposed Change to Technical Specifications Concerning the Safety Limit Minimum Critical Power Ratio ML14003A0462013-12-12012 December 2013 FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel ML11326A1532011-11-0909 November 2011 FSAR Update Revision 28, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Commitment Changes ML1106103972011-02-18018 February 2011 Marked-up and Re-typed Technical Specification and Bases Pages for the Proposed License Amendment Related to Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring Safety Valves (Ssv). ML0734600622007-11-29029 November 2007 Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3) ML0515204682005-05-24024 May 2005 Request for Amendment to Technical Specification to Remove Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement ML0309905332003-03-27027 March 2003 Response to NRC Request for Additional Information Related to Technical Specification Changes to Post-Accident Monitoring Instrumentation Requirement 2023-11-30 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23334A1822023-11-30030 November 2023
[Table view]Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 ML16211A0672016-07-22022 July 2016 Errata Change for Final Safety Analysis Report Revision 30 ML16083A4712015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 6 - November 2015 ML16083A4692015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 5 - November 2015 ML16083A4642015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 4 - November 2015 ML16083A4612015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 3 - November 2015 ML16083A4532015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 2 - November 2015 ML16083A4482015-11-30030 November 2015 Redacted - Updated Final Safety Analysis Report (UFSAR) Part 1 - November 2015 ML14003A0462013-12-12012 December 2013 FSAR Update Revision 29, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes ML11326A1532011-11-0909 November 2011 FSAR Update Revision 28, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Commitment Changes ML0703702722007-01-30030 January 2007 Email: (PD) FSAR Excerpt ML0603000292006-01-25025 January 2006 Updated Final Safety Analysis Report Supplement 2023-11-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23334A182&oldid=3684101"