Line 3: Line 3:
| issue date = 02/28/1989
| issue date = 02/28/1989
| title = Monthly Operating Rept for Feb 1989 for Re Ginna Nuclear Power Plant
| title = Monthly Operating Rept for Feb 1989 for Re Ginna Nuclear Power Plant
| author name = DODGE R E
| author name = Dodge R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:gccE~~TED DIS@1BUTION DEMONSTR04 SYSTEM"Is4,REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:8903210455 DOC.DATE89~~5~NOTARIZED:
{{#Wiki_filter:gccE~~TED               DIS@1BUTION                         DEMONSTR04                 SYSTEM "Is 4,
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION DODGE,R.E.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Rochester Gas6ElectricCorp.MECREDY,R.C.
ACCESSION NBR:8903210455                         DOC.DATE  89~~5~         NOTARIZED: NO            DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                               G  05000244 AUTH. NAME            AUTHOR AFFILIATION DODGE,R.E.           Rochester Gas 6 Electric Corp.
Rochester GasSElectricCorp.RECIP.NAME RECIPIENT AFFXLXATXON DOCKET05000244
MECREDY,R.C.         Rochester Gas S Electric Corp.
RECIP.NAME           RECIPIENT AFFXLXATXON


==SUBJECT:==
==SUBJECT:==
Monthlyopera'w~.etforFeb1989forREGinnaNuclearPowerPlant.W89031ltr.DISTRIBUTXON CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Monthly opera 'w~.e Power Plant.W 89031 tltr.
S05000244RECIPIENT XDCODE/NAME PD1-3LASTAHLE,CINTERNAL:
for Feb  1989  for  RE  Ginna Nuclear DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR                               ENCL      SIZE:
AEOD/DOAARMTECHADVNRR/DOEA/EAB 11NUDOCS-ABSTRACT RGN1EXTERNALEGGGSIMPSONgFLPDRNSICCOPIESLTTRENCL10101122111111111111RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NRR/DLPQ/PEB llNRRDEEPRPB1001EGS(GWILLIAMSgSNRCPDRCOPIESLTTRENCL55111111111111RINOTEIOALL"RIBS"RECIPIENIS'LEASE HELPUSTOREZUCEWA<i~lCONI'ACT'IHEDOCXMENZCOFZROLDESKROOMPl-37(EXT.20079)IOEZJMNATEYOURNAMEFRQHDIPHGBVTIGN LISTSH)RDOCUME&#xc3;ZS YOUDClN~TNEED)TOTALNUMBEROFCOPIES,REQUIRED:
TITLE: Monthly Operating Report (per Tech Specs)                                                             S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                                   05000244 RECIPIENT                        COPIES            RECIPIENT            COPIES XD CODE/NAME                      LTTR ENCL      ID  CODE/NAME         LTTR ENCL PD1-3 LA                              1    0      PD1-3 PD                  5    5 STAHLE,C                              1    0 INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 1
LTTR22ENCL20 cOPERATING STATUSOPERATING DATAREPORTDOCKETNO.DATFMarch15,1989COMPLETED BYg~RobertE.DodgeTFLFPHONF 315-524-4446 x-396GinnaStation1520470I~UnitName:R.E.6!NNANUCLEARPOWERPLANT2.Reporting Period:Febru,19893.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NcthlWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):NotesThereactorpowerlevelwasmaintained at100%forthemajorityofthereportperiodwithsomeexceptions detailedonpage3and4ofthereport.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastRcport,GiveReasons:9.PowerLeveltoWhichRestricted, IfAny(NctMWc):10.ReasonsForRestrictions, IfAny:ThisMonthYr:to-Date Cumulative 168,840133101.981687.55*130666.888.5*184,038,785 60,500,324 57,411,430 77.39877.40%73.7556.33%11.HoursInReporting Period6721,41612.NumberofHoursReactorWasCritical6721404.3713~ReactorReserveShutdownHours0014.HoursGcncrator On-Line672139515.UnitRcservcShutdownHours0016.GrossThermalEnergyGenerated (hlV/H)2,068,37117.GrossElectrical EnergyGenerated (MV/H)341,325700,99518.NctFlectrical EnergyGenerated (hlWH)324,877666,97219.UnitServiceFactor100%98.52%20.UnitAvailability Factor100%98.52%21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate01.48%24.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):AnnualRefueling andMaintenance Shutdown-March17,1989.45-55days25.IfShutDownAtEndOfRcport.Period,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
2 1
INITIALCRITICALITYINITIALELECTRICITY COhlMFRCIAL OPERATION "Cumnulative totalconmencing January1,19758903210455 890228PDRADOCK05000244RPDCForecastAchievedAtv.aSS4988 OPERATING DATAREPORTDOCKETNO.50244Marh15,1989'OMPLETED BYREVISEDRobertE.DodeOPERhTING SThTUSl~UnicName:R.E.GINNANUCLEARPOWERPLANT2Rcporcing Period:January,83.LicensedThermalPower(MWt):4.Nameplacc Racing(GrossMWe):4705.DesignElectrical Racing(NetMWe):4906.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)TELFPHONE 315-524-4446 x-396GonnaState.onNotesThereactorpowerlevelwasmaintained at100%forthemajorityofthereportperiodwithsomeexceptions detailedonpage3and4ofthereporSinceLastRcpocc,GiveReasons:~9.PowerLeveltoWhichRestricted, lfhny(NetMWc):IO.ReasonsForRestrictions, lfhny:ThisMonthYr:to-Date Cumulacive 732.377231,061',710~*
1 2
',061,710
1 AEOD/DSP/TPAB NRR/DLPQ/PEB NRR DEEP RPB ll 10 1
"*359,670342,09597.18%97.18%97.83%97.83%2.82%45-55dasll.HoursInReporting Period744l2.NumberofHoursReactorWasCritical732~37l3.ReactorReserveShutdownHours14.IloursGcncrator On-Linc15.UnitRcservcShutdownHoursl6.GrossThermalEnergyGeneraced (MWH)l7.GrossElectrical EnergyGenerated (MWH)18.NccFleccrical FnergyGencratcd (MWH)342,095l9.UnitServiceFactor97.18%20.Unithvailubilicy Factor97.18%21.UnitCapacicyFactor(UsingMDCNec)97.83%22.UnitCapacicyFaccor(UsingDERNet)23UnitForcedOutageRate24.Shutdowns Scheduled OverNexc6Months(Type,DaceandDurationofEach):AnnualRefuelinandMaintenance Shutdown-March17,168,168132,429.98 1,687.55129,994.88 85*183,032,124**
1 1
60,158,999 57,086,553 77.30%77.31%7363**7363**6.36%198925.IfShucDownhcEndOfReport.Period,Escimatcd DateofScartup:26.UnitslnTestStatus(PriorcoCommercial Operation):
1 1
INITIhLCRITIChLITY INITlhLELECTRICITY COMMFRCIh LOPFRhTIONForecascAchieved*Cummulative totalcommencing January1,1975**Corrected previously submitted figurethatwasinerrorhtv<isists
1 NUDOCS-ABSTRACT                        1    1                        01      1    1 RGN1                                  1    1 EXTERNAL      EGGG S IMPSON g F                      1    1      EGS(G  WILLIAMS S g      1    1 LPDR                                  1    1      NRC PDR                  1    1 NSIC                                  1    1 R
~'lf'flp)7'tJI,j AVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEMarch151989COMPLETED BYQrRobertE.DodgeTELEPHONE 1315524-4446Ext.396atGinnaMONTHFebruar1989DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
I NOTE IO ALL "RIBS" RECIPIENIS'LEASE HELP US TO REZUCE WA<i~l              CONI'ACT 'IHE DOCXMENZ COFZROL DESK ROOM Pl-37 (EXT. 20079) IO EZJMNATE                YOUR NAME FRQH DIPHGBVTIGN LISTS H)R DOCUME&#xc3;ZS YOU DClN~T NEED)
DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 48917~4892~48518'883~48519.4894~48920.4895~48921~4906.41222'907~41823.490'~49024'899~49025'8910'9026.48948927'8912~489'28.48913.48829'4.49030.15.49031.16.491INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month..Computetothenearestwholemegawatt.
TOTAL NUMBER OF COPIES, REQUIRED: LTTR                        22    ENCL      20
l)OCKETNO.~0244UNITNAMI:.
 
R.E.GINNANUCLEARPOWERPLANKUNITSHUTDOWNANDPOWERREDUCTIONS DATCOhiPLE1'EDI3Y+rRobert.geREPORThiONTHFMMY,19891.I.LI:PiiONI:
c OPERATING DATA REPORT DOCKET NO.
315-524-4446 x-396GinnaStationHo.Datec00~0O~PlC000ncSo0Euo>cc0EOC0OlicenseeEventReport41Ew0VlQ00'0Q0OCouse8aCorrective ActiontoPreventRecurrence 89-22/6/8936INSTRUReactorpowerlevelreducedtoapproximately 70$becauseofturbinerunbackfromE-HandGround.1F:ForcedS:Scheduled Rtv.4/894949Reason:A-Equipment Failure(Explain)
DATF    March 15, 1989 COMPLETED BY g~ Robert  E. Dodge TFLFPHONF 315-524-4446 x-396 OPERATING STATUS                                                              Ginna  Station I ~ Unit Name: R.E. 6!NNA NUCLEAR POWER PLANT                    Notes The reactor power level
B-Maintenance orTestC-Refueling D-Regulatory Restriction
: 2. Reporting Period:   Febru,       1989                        was maintained at 100%          for
'-Operator Training&LicenseExamination F-Administrative G-Operational Error(Explain)
: 3. Licensed Thermal Power (MWt):                  1520            the majority of the report
H-Other(Explain) hiethod:14fanual2-hianual Scram.3-Automatic Scram.4-Other(Explain)
: 4. Nameplate Rating (Gross MWe):                                  period with some exceptions
ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)ExhibitI-SameSource NARRATXVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEMarch5198COMPLETED BYp~RobertE.DodgeTELEPHONE 1315524-4446EXT.396atGinnaMONTHFebruar1989Theunitoperatedat100%reactorpowerlevelforthemajorityofthereportperiod,withafewexceptions asfollows:On2/6/89thereactorpowerlevelwasreducedto704becauseofturbinerunbackfromE-Handground.Thereactorpowerlevelwasrestoredto1004on2/7/89.On2/13/89thereactorpowerlevelwasreducedto984toperformPeriodicTestsoftheAuxiliary Feedwater System.On2/13/89thereactorpowerlevelwasreducedto994toperformPeriodicTestsoftheStandbyAuxiliary Feedwater SystemFlowCheck.
: 5. Design Electrical Rating (Nct hlWe):
eGINNASTATIONMAINTENANCE REPORTSUMMARYFEBRUARYg1989DuringthemonthofFebruary, routinemaintenance andinspections werecompleted.
470            detailed on page 3 and 4 of
Majorsafetyrelatedworkincluded:
: 6. Maximum Dependable Capacity (Gross MWe):                        the report.
a~b.c~lASpentFuelPitRecircPump-minormaintenance andcouplingrepairIg2SPINGMonitor-P.M.Inspection SnubberInspection perM-40  
: 7. Maximum Dependable Capacity (Net MWe):
~~<zzs/irzziirzz AHO'rrzgyiz(zzzz/////tu/////II/57 ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.KN(Wba1~OetA1C14649-0001 TCLEPHONE ARcAcooeisa546.2700GINNASTATIONMarch15,1989USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555-
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Nct MWc):
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to-Date       Cumulative
: 11. Hours In Reporting Period                              672              1,416              168,840
: 12. Number of Hours Reactor Was    Critical              672              1  404.37          133 101.98 13  ~  Reactor Reserve Shutdown Hours                        0                    0                1  687.55*
: 14. Hours Gcncrator On-Line                              672              1 395              130 666.88
: 15. Unit Rcservc Shutdown Hours                            0                    0                      8.5*
: 16. Gross Thermal Energy Generated (hlV/H)                           2, 068, 371          184,038,785
: 17. Gross Electrical Energy Generated (MV/H)     341,325              700,995            60,500,324
: 18. Nct Flectrical Energy Generated (hlWH)       324,877              666,972            57,411,430
: 19. Unit Service Factor                                100%                 98.52%             77.398
: 20. Unit Availability Factor                              100%                 98.52%             77.40%
: 21. Unit Capacity Factor (Using MDC Net)                                                         73.755
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate                                0                  1.48%               6.33%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refueling and Maintenance Shutdown             - March 17, 1989.       45-55 days
: 25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast          Achieved INITIAL CRITICALITY INITIALELECTRICITY COhlMFRCIAL OPERATION "Cumnulative         total  conmencing January 1, 1975 Atv. aSS 8903210455 890228                                                                          49 88 PDR    ADOCK 05000244 R                      PDC
 
OPERATING DATA REPORT DOCKET NO.     50 244 Mar h 15, 1989'OMPLETED BY REVISED                                    Robert E. Dod e TELFPHONE      315-524-4446 x-396 OPERhTING SThTUS                                                                Gonna State.on l Unic Name:
      ~               R.E. GINNA NUCLEAR POWER PLANT                      Notes 2    Rcporcing Period:       January,         8 The    reactor      power    level
: 3. Licensed Thermal Power (MWt):                                    was    maintained at        100%
: 4. Nameplacc Racing (Gross MWe):                                     for    the    majority of                  the
: 5. Design Electrical Racing (Net MWe):
470              report period with                        some
: 6. Maximum Dependable Capacity (Gross MWe):
490              exceptions detailed                        on
: 7. Maximum Dependable Capacity (Net MWe):
page    3  and  4  of  the              repor
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcpocc, Give Reasons:             ~
: 9. Power Level to Which Restricted,     lf hny (Net MWc):
IO. Reasons For Restrictions, lf hny:
This Month            Yr:to-Date         Cumulacive ll. Hours    In Reporting Period                                                    744            168,168 l2. Number of Hours Reactor Was Critical                      732 37~                732.37        132,429.98 l3. Reactor Reserve Shutdown Hours                                                                                1,687.55
: 14. Ilours Gcncrator On-Linc                                                          723            129,994.88
: 15. Unit Rcservc Shutdown Hours                                                                                          8 5*
l6. Gross Thermal Energy Generaced (MWH)                1,061',710~*       ',061,710 "*         183,032,124**
l7. Gross Electrical Energy Generated (MWH)             359,670                                60,158,999
: 18. Ncc Fleccrical Fnergy Gencratcd (MWH)               342,095              342, 095          57,086,553 l 9. Unit Service Factor                                    97.18%               97.18%                            77.30%
: 20. Unit hvailubilicy Factor                                97.18%               97.18%                            77.31%
: 21. Unit Capacicy Factor (Using MDC Nec)                   97.83%                97.83%                       73 63**
: 22. Unit Capacicy Faccor (Using DER Net)                   97.83%                                              73 63**
23 Unit Forced Outage Rate                                  2.82%                                                    6.36%
: 24. Shutdowns Scheduled Over Nexc 6 Months (Type, Dace and Duration of Each):
Annual Refuelin            and Maintenance          Shutdown         March 17, 1989 45 - 55 da s
: 25. If Shuc  Down hc End Of Report. Period, Escimatcd Date of Scartup:
: 26. Units ln Test Status (Prior co Commercial Operation):                     Forecasc            Achieved INITIhL CRITIChLITY INITlhL ELECTRICITY COMMFRCIh L OPF RhTION
        *Cummulative total commencing January 1, 1975 htv <is is ts
      **Corrected previously submitted figure that was in error
 
                      ~
lf 'f lp) 7
                  't J
I, j
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-244 UNIT R.E. Ginna Nuclear Power  Plant DATE March 15      1989 COMPLETED BY Qr Robert    E. Dodge TELEPHONE  1  3 15  524-4446 Ext. 396  at Ginna MONTH      Februar  1989 DAY AVERAGE    DAILY POWER LEVEL          DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                             (MWe-Net) 2 3
  ~
  ~
489 485 485 17 18 19.
                                                '88
                                                ~         489 489 489                      20.             489
                                                '90 4 ~
5~               489                      21  ~         490
: 6.               412                      22 7 ~             418 490 23.
24  '89
                                              '89 490'
    '90
  ~
490                      25
                                              '89 9 ~
10                                        26.             489 489                      27 12  ~           489                     '28.             489
: 13.              488                      29 490                      30.
                                              '4.
: 15.             490                      31.
: 16.             491 INSTRUCTIONS On    this format, list the average daily unit power level in MWe-Net for each day in the reporting month.. Compute to the nearest whole megawatt.
 
l)OCKET NO.           ~0 244 UNITNAMI:. R.E. GINNA NUCLEAR POWER PLANK UNIT SHUTDOWN AND POWER REDUCTIONS                                  DAT COhiP LE1'ED I3Y MMY, 1989
                                                                                                                          +r  Robert .         ge REPORT hiONTH F                            1.I.LI:PiiONI: 315-524-4446 x-396 Ginna    Station Ho.           Date c
0 Pl C
0 Sou0 E o    licensee Event Ew        0 0
0
                                                                                                  '                  Couse  8a Corrective 0 0      0              > cc                                Q                          Action to
                                ~
0                                          0          0 O~       nc        0EO C        Report  41 Vl Q O
Prevent Recurrence 0
O 89-2        2/6/89          36                                                          INSTRU  Reactor power level reduced to approximately 70$ because of turbine runback from E-H and Ground.
1 F: Forced            Reason:                                               hiethod:                              Exhibit G - Instructions S:    Scheduled     A-Equipment Failure (Explain)                         14fanual                              for Preparation of Data B-Maintenance or Test                                  2-hianual Scram.                      Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram.                    Event Report (LER) File (NUREG-D-Regulatory Restriction                               4-Other (Explain)                    0161)
Training & License Examination
                                                '-Operator F-Administrative G-Operational Error (Explain)
Rtv. 4/89 4949        H-Other (Explain)                                                                           Exhibit I - Same Source
 
NARRATXVE  
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power  Plant DATE  March 5 198 COMPLETED BY p~ Robert E. Dodge TELEPHONE 1  315 524-4446 EXT. 396 at Ginna MONTH    Februar  1989 The unit operated at 100% reactor power level for the majority of the report period, with a few exceptions as follows:
On 2/6/89 the reactor power level was reduced to    704 because of turbine runback from E-H and ground. The reactor power level was restored to 1004 on 2/7/89.
On 2/13/89 the reactor power level was reduced to      984 to perform Periodic Tests of the Auxiliary Feedwater System.
On 2/13/89 the reactor power level was reduced to      994 to perform Periodic Tests of the Standby Auxiliary Feedwater System Flow Check.
 
e GINNA STATION MAINTENANCE REPORT
 
==SUMMARY==
 
FEBRUARY g 1 989 During the month of February, routine maintenance and inspections were completed. Major safety  related work included:
a ~   lA Spent Fuel Pit Recirc Pump  minor maintenance and coupling repair I
: b. g2 SPING Monitor  P.M. Inspection c ~    Snubber Inspection per M-40
 
      ~     ~
N(W
        <     zzs /irzziirzz                                                               ba1 ~ OetA1C A HO
      'rrzgy      iz(zzzz
        /////tu /////II/57 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TCLEPHONE ARcA cooe isa 546.2700 GINNA STATION March 15, 1989 US    Nuclear Regulatory Commission Document                Control Desk Washington,                 DC 20555


==Subject:==
==Subject:==
Monthly Report for February, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244


MonthlyReportforFebruary, 1989Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244
==Dear        Sir:==


==DearSir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1989.
PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofFebruary, 1989.Verytrulyyours,RobertC.MecedGeneralManager'uclear Production RCM/eehAttachments cc:Mr.WilliamT.RussellNRC(1)}}
Very truly yours, Robert  C. Mec ed General Production Manager'uclear RCM/eeh Attachments cc:         Mr. William T. Russell          NRC (1)}}

Latest revision as of 04:32, 4 February 2020

Monthly Operating Rept for Feb 1989 for Re Ginna Nuclear Power Plant
ML17309A422
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1989
From: Dodge R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17251A428 List:
References
NUDOCS 8903210455
Download: ML17309A422 (9)


Text

gccE~~TED DIS@1BUTION DEMONSTR04 SYSTEM "Is 4,

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903210455 DOC.DATE 89~~5~ NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

MECREDY,R.C. Rochester Gas S Electric Corp.

RECIP.NAME RECIPIENT AFFXLXATXON

SUBJECT:

Monthly opera 'w~.e Power Plant.W 89031 tltr.

for Feb 1989 for RE Ginna Nuclear DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 0 PD1-3 PD 5 5 STAHLE,C 1 0 INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 1

2 1

1 2

1 AEOD/DSP/TPAB NRR/DLPQ/PEB NRR DEEP RPB ll 10 1

1 1

1 1

1 NUDOCS-ABSTRACT 1 1 01 1 1 RGN1 1 1 EXTERNAL EGGG S IMPSON g F 1 1 EGS(G WILLIAMS S g 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

I NOTE IO ALL "RIBS" RECIPIENIS'LEASE HELP US TO REZUCE WA<i~l CONI'ACT 'IHE DOCXMENZ COFZROL DESK ROOM Pl-37 (EXT. 20079) IO EZJMNATE YOUR NAME FRQH DIPHGBVTIGN LISTS H)R DOCUMEÃZS YOU DClN~T NEED)

TOTAL NUMBER OF COPIES, REQUIRED: LTTR 22 ENCL 20

c OPERATING DATA REPORT DOCKET NO.

DATF March 15, 1989 COMPLETED BY g~ Robert E. Dodge TFLFPHONF 315-524-4446 x-396 OPERATING STATUS Ginna Station I ~ Unit Name: R.E. 6!NNA NUCLEAR POWER PLANT Notes The reactor power level

2. Reporting Period: Febru, 1989 was maintained at 100% for
3. Licensed Thermal Power (MWt): 1520 the majority of the report
4. Nameplate Rating (Gross MWe): period with some exceptions
5. Design Electrical Rating (Nct hlWe):

470 detailed on page 3 and 4 of

6. Maximum Dependable Capacity (Gross MWe): the report.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct MWc):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 672 1,416 168,840
12. Number of Hours Reactor Was Critical 672 1 404.37 133 101.98 13 ~ Reactor Reserve Shutdown Hours 0 0 1 687.55*
14. Hours Gcncrator On-Line 672 1 395 130 666.88
15. Unit Rcservc Shutdown Hours 0 0 8.5*
16. Gross Thermal Energy Generated (hlV/H) 2, 068, 371 184,038,785
17. Gross Electrical Energy Generated (MV/H) 341,325 700,995 60,500,324
18. Nct Flectrical Energy Generated (hlWH) 324,877 666,972 57,411,430
19. Unit Service Factor 100% 98.52% 77.398
20. Unit Availability Factor 100% 98.52% 77.40%
21. Unit Capacity Factor (Using MDC Net) 73.755
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0 1.48% 6.33%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refueling and Maintenance Shutdown - March 17, 1989. 45-55 days

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COhlMFRCIAL OPERATION "Cumnulative total conmencing January 1, 1975 Atv. aSS 8903210455 890228 49 88 PDR ADOCK 05000244 R PDC

OPERATING DATA REPORT DOCKET NO. 50 244 Mar h 15, 1989'OMPLETED BY REVISED Robert E. Dod e TELFPHONE 315-524-4446 x-396 OPERhTING SThTUS Gonna State.on l Unic Name:

~ R.E. GINNA NUCLEAR POWER PLANT Notes 2 Rcporcing Period: January, 8 The reactor power level

3. Licensed Thermal Power (MWt): was maintained at 100%
4. Nameplacc Racing (Gross MWe): for the majority of the
5. Design Electrical Racing (Net MWe):

470 report period with some

6. Maximum Dependable Capacity (Gross MWe):

490 exceptions detailed on

7. Maximum Dependable Capacity (Net MWe):

page 3 and 4 of the repor

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcpocc, Give Reasons: ~
9. Power Level to Which Restricted, lf hny (Net MWc):

IO. Reasons For Restrictions, lf hny:

This Month Yr:to-Date Cumulacive ll. Hours In Reporting Period 744 168,168 l2. Number of Hours Reactor Was Critical 732 37~ 732.37 132,429.98 l3. Reactor Reserve Shutdown Hours 1,687.55

14. Ilours Gcncrator On-Linc 723 129,994.88
15. Unit Rcservc Shutdown Hours 8 5*

l6. Gross Thermal Energy Generaced (MWH) 1,061',710~* ',061,710 "* 183,032,124**

l7. Gross Electrical Energy Generated (MWH) 359,670 60,158,999

18. Ncc Fleccrical Fnergy Gencratcd (MWH) 342,095 342, 095 57,086,553 l 9. Unit Service Factor 97.18% 97.18% 77.30%
20. Unit hvailubilicy Factor 97.18% 97.18% 77.31%
21. Unit Capacicy Factor (Using MDC Nec) 97.83% 97.83% 73 63**
22. Unit Capacicy Faccor (Using DER Net) 97.83% 73 63**

23 Unit Forced Outage Rate 2.82% 6.36%

24. Shutdowns Scheduled Over Nexc 6 Months (Type, Dace and Duration of Each):

Annual Refuelin and Maintenance Shutdown March 17, 1989 45 - 55 da s

25. If Shuc Down hc End Of Report. Period, Escimatcd Date of Scartup:
26. Units ln Test Status (Prior co Commercial Operation): Forecasc Achieved INITIhL CRITIChLITY INITlhL ELECTRICITY COMMFRCIh L OPF RhTION
  • Cummulative total commencing January 1, 1975 htv <is is ts
    • Corrected previously submitted figure that was in error

~

lf 'f lp) 7

't J

I, j

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 15 1989 COMPLETED BY Qr Robert E. Dodge TELEPHONE 1 3 15 524-4446 Ext. 396 at Ginna MONTH Februar 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 2 3

~

~

489 485 485 17 18 19.

'88

~ 489 489 489 20. 489

'90 4 ~

5~ 489 21 ~ 490

6. 412 22 7 ~ 418 490 23.

24 '89

'89 490'

'90

~

490 25

'89 9 ~

10 26. 489 489 27 12 ~ 489 '28. 489

13. 488 29 490 30.

'4.

15. 490 31.
16. 491 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.. Compute to the nearest whole megawatt.

l)OCKET NO. ~0 244 UNITNAMI:. R.E. GINNA NUCLEAR POWER PLANK UNIT SHUTDOWN AND POWER REDUCTIONS DAT COhiP LE1'ED I3Y MMY, 1989

+r Robert . ge REPORT hiONTH F 1.I.LI:PiiONI: 315-524-4446 x-396 Ginna Station Ho. Date c

0 Pl C

0 Sou0 E o licensee Event Ew 0 0

0

' Couse 8a Corrective 0 0 0 > cc Q Action to

~

0 0 0 O~ nc 0EO C Report 41 Vl Q O

Prevent Recurrence 0

O 89-2 2/6/89 36 INSTRU Reactor power level reduced to approximately 70$ because of turbine runback from E-H and Ground.

1 F: Forced Reason: hiethod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance or Test 2-hianual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

Training & License Examination

'-Operator F-Administrative G-Operational Error (Explain)

Rtv. 4/89 4949 H-Other (Explain) Exhibit I - Same Source

NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 5 198 COMPLETED BY p~ Robert E. Dodge TELEPHONE 1 315 524-4446 EXT. 396 at Ginna MONTH Februar 1989 The unit operated at 100% reactor power level for the majority of the report period, with a few exceptions as follows:

On 2/6/89 the reactor power level was reduced to 704 because of turbine runback from E-H and ground. The reactor power level was restored to 1004 on 2/7/89.

On 2/13/89 the reactor power level was reduced to 984 to perform Periodic Tests of the Auxiliary Feedwater System.

On 2/13/89 the reactor power level was reduced to 994 to perform Periodic Tests of the Standby Auxiliary Feedwater System Flow Check.

e GINNA STATION MAINTENANCE REPORT

SUMMARY

FEBRUARY g 1 989 During the month of February, routine maintenance and inspections were completed. Major safety related work included:

a ~ lA Spent Fuel Pit Recirc Pump minor maintenance and coupling repair I

b. g2 SPING Monitor P.M. Inspection c ~ Snubber Inspection per M-40

~ ~

N(W

< zzs /irzziirzz ba1 ~ OetA1C A HO

'rrzgy iz(zzzz

/////tu /////II/57 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TCLEPHONE ARcA cooe isa 546.2700 GINNA STATION March 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for February, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1989.

Very truly yours, Robert C. Mec ed General Production Manager'uclear RCM/eeh Attachments cc: Mr. William T. Russell NRC (1)