{{#Wiki_filter:*                                      c
{{#Wiki_filter:*                                      c AEC unQIBUTICN FOR PART 50 DOCKET bMIAL
            .
AEC unQIBUTICN FOR PART 50 DOCKET bMIAL
                   ,                                (TEMPORARY FORM)                        CONTROL NO:      5598
                   ,                                (TEMPORARY FORM)                        CONTROL NO:      5598
        .
                 .                                                                            FILE: /4 (d<*/
                 .                                                                            FILE: /4 (d<*/
FROM:                                      DATE OF DOC      DATE REC'D      LTR    TWX      RPT    OTHER Metropolitan Edison Company Reading, Pa. 19603                            6-19-74          6-20-74      X R. C. Arnold TO:                                            ORIG          CC    OTHER          SENT AEC PDR        X L. M. Muntzing                        1 signed                              SENT LOCAL PDR X CLASS        UNCLASS    I    PROP int 0        PUT          NO CYS REC'D          DOCKET NO:
FROM:                                      DATE OF DOC      DATE REC'D      LTR    TWX      RPT    OTHER Metropolitan Edison Company Reading, Pa. 19603                            6-19-74          6-20-74      X R. C. Arnold TO:                                            ORIG          CC    OTHER          SENT AEC PDR        X L. M. Muntzing                        1 signed                              SENT LOCAL PDR X CLASS        UNCLASS    I    PROP int 0        PUT          NO CYS REC'D          DOCKET NO:
XXX                                                40              50-289
XXX                                                40              50-289 DESCRIPTIC'.                                                ENCLOSURES:
                                        -
DESCRIPTIC'.                                                ENCLOSURES:
Ltr trans the following:                                    Request for Extension of Time to Submit Emergency Core Cooling System Evaluation LON0f REMOVE                                      ACKNOWLEDGED PLANT NAME: Three Mile Island Unit 1                            ( 1 Orig & 39 cys ree'd )
Ltr trans the following:                                    Request for Extension of Time to Submit Emergency Core Cooling System Evaluation LON0f REMOVE                                      ACKNOWLEDGED PLANT NAME: Three Mile Island Unit 1                            ( 1 Orig & 39 cys ree'd )
FOR ACTION /INF0FEATION 6-20-74 CC BUTLER (L)          /CHWENCER(L)              ZIDIANN(L)            REGAN(E)
FOR ACTION /INF0FEATION 6-20-74 CC BUTLER (L)          /CHWENCER(L)              ZIDIANN(L)            REGAN(E)
Line 33: Line 28:
       '.:/ c:;i::            "/ c:;i::              S/ c:;i::            S/ C:;i::
       '.:/ c:;i::            "/ c:;i::              S/ c:;i::            S/ C:;i::
KNIEL(L)              PURPLE (L)              YOUNGBLOOD(E)
KNIEL(L)              PURPLE (L)              YOUNGBLOOD(E)
W/ Copies              W/ Copies              W/ Copies            W/ Copies
W/ Copies              W/ Copies              W/ Copies            W/ Copies n                                      INTERNAL DISTRIBUTION
.
n                                      INTERNAL DISTRIBUTION
   &                              TECH REVIEW dENDRIE DENTON LIC ASST A/T IND
   &                              TECH REVIEW dENDRIE DENTON LIC ASST A/T IND
   /AEC PDR                                          GRIMES                                    BRAI'DdAN OGC, ROCM P-506A            SCHROEDER          GAMMILL DIGGS (L)                SALIZMAN MUNTZING/ STAFF            MACCARY            KASTNER GEARIN (L)              3. HURT W6ASE                          KNIGHT            BALLARD                                  PLANS andOULBOURNE (L)
   /AEC PDR                                          GRIMES                                    BRAI'DdAN OGC, ROCM P-506A            SCHROEDER          GAMMILL DIGGS (L)                SALIZMAN MUNTZING/ STAFF            MACCARY            KASTNER GEARIN (L)              3. HURT W6ASE                          KNIGHT            BALLARD                                  PLANS andOULBOURNE (L)
Line 47: Line 40:
[ FILE & REGION (2)            LAINAS                              WILLIAMS (E)            D. THOMPSON (2)
[ FILE & REGION (2)            LAINAS                              WILLIAMS (E)            D. THOMPSON (2)
MORRIS                      BENAROYA          HARLESS          WILSON (L)                  .p7Q ST EI'.E                    VOLIEER                                              IIC/
MORRIS                      BENAROYA          HARLESS          WILSON (L)                  .p7Q ST EI'.E                    VOLIEER                                              IIC/
                                                                                          '
ij J U            ~
ij J U            ~
EXTT.R'iAL DISTRI3UTIC'?                                      /[j/
EXTT.R'iAL DISTRI3UTIC'?                                      /[j/
V1_- LOCAL PDR Harrisburg, Pa.                                                                            'g s,A - TIC (ABER';ATHY)                      (1)(2)(10)-NATIONAL LAB'S                    1-PDR-SAN /Li/NY i/I - NSIC(BUCHANAN)                                  1-ASLBP(E/W 31dg,Rm 529)            1- LIBR/RIAN 1 - ASLB                                            1-W. PENNINGTON, Rm E-201 GT      BROOKHAVEN NAT. LA3 1 - P. R. DAVIS (AEROJET NUCLEAR)                  1-CONSULTANT' S                    1-AGMED(Ruth Gussman)
V1_- LOCAL PDR Harrisburg, Pa.                                                                            'g s,A - TIC (ABER';ATHY)                      (1)(2)(10)-NATIONAL LAB'S                    1-PDR-SAN /Li/NY i/I - NSIC(BUCHANAN)                                  1-ASLBP(E/W 31dg,Rm 529)            1- LIBR/RIAN 1 - ASLB                                            1-W. PENNINGTON, Rm E-201 GT      BROOKHAVEN NAT. LA3 1 - P. R. DAVIS (AEROJET NUCLEAR)                  1-CONSULTANT' S                    1-AGMED(Ruth Gussman)
A6 - CYS ACRS Il0tXTJfMC SENT TO LIC. ASST.              NEWARK / BLUME/AGBABI AN            EM- B-12 7, CT.
A6 - CYS ACRS Il0tXTJfMC SENT TO LIC. ASST.              NEWARK / BLUME/AGBABI AN            EM- B-12 7, CT.
6-20-74 GOULBOUIUTE 1-GEFALD ULRIXSON. . .CRFL            1-RD.. MULLER..F-309 GT
6-20-74 GOULBOUIUTE 1-GEFALD ULRIXSON. . .CRFL            1-RD.. MULLER..F-309 GT c                    ..                    1-B & M SWINE 3RCAD, an -0        T O 40Cc?- p        g
-
c                    ..                    1-B & M SWINE 3RCAD, an -0        T O 40Cc?- p        g


      .
.
        .
                                    '            _ _ _ _ _ _ _ -              _
                                                                                              '
                                                                                                    ,_                          _ . _ _ _ _
  ,
     . Hulal0y Docket fde                                          #M                                        _
     . Hulal0y Docket fde                                          #M                                        _
___                                                                                _
                                                                             .                                                                          E METROPOLITAN EDISON COMPANY                                                                              .
                                                                             .                                                                          E METROPOLITAN EDISON COMPANY                                                                              .
                                                                                                                      -
POST OFFICE BOX 542  READING, PENNSYLVANI A 19603                                                      TELEPHONE 215 - 929-3601 June 19, 1974 GQL 0095 x' d\
__
Mr. L. Manning Muntzing                                                              go                                'A Director of Regulation                                                                          f.              3 7. g Directorate of Licensing                                                                          4' ,,,                    -li Office of Regulatien                                                                $            ' ' ' ,OA p.g
POST OFFICE BOX 542  READING, PENNSYLVANI A 19603                                                      TELEPHONE 215 - 929-3601 June 19, 1974 GQL 0095
                                                                                                                                                ,
x' d\
Mr. L. Manning Muntzing                                                              go                                'A
                                                                                                                                              .
Director of Regulation                                                                          f.              3 7. g Directorate of Licensing                                                                          4' ,,,                    -li Office of Regulatien                                                                $            ' ' ' ,OA p.g
                                                                                                                                   '6            C.,
                                                                                                                                   '6            C.,
U. S. Atomic Energy Cornission                                                      $ .j2 ,,' , -
U. S. Atomic Energy Cornission                                                      $ .j2 ,,' , -
Line 83: Line 59:
Three Mile Island Nuclear Generating Statica Unit I License DPR 50 Docket No. 50-289 ECCS, Application for Extension Enclosed are 39 copies and one original of an application for extension of time for submittal of wi ECCS evaluation for Three Mile Island Unit I pursuant to the provisions of 10 CFR 50.h6.
Three Mile Island Nuclear Generating Statica Unit I License DPR 50 Docket No. 50-289 ECCS, Application for Extension Enclosed are 39 copies and one original of an application for extension of time for submittal of wi ECCS evaluation for Three Mile Island Unit I pursuant to the provisions of 10 CFR 50.h6.
Sincerely, 9,      ,        ,
Sincerely, 9,      ,        ,
                                                                          '
6 ,; *J t ug,
6 ,; *J t
                                                                              ,
                                                                                  %
ug,
                                                                                           )
                                                                                           )
R. C7'Ainold            '
R. C7'Ainold            '
Line 93: Line 65:
4
4
                                                                                     + y'fQ\
                                                                                     + y'fQ\
                                                                                    '.,
: s. 80                          4 l ::1.. &?g r. ~
: s. 80                          4
                                                                                .
l ::1.. &?g r. ~
::s
::s
                                                                                           % ~ ,j                          $.
                                                                                           % ~ ,j                          $.
                                                                                                        <
O<
O<
Q .?                              .
Q .?                              .
                                                                                               'y -
                                                                                               'y -
                                                                                                                        '
1R IJ            l    ln-)
1R IJ            l    ln-)
JJ 55S8
JJ 55S8


    .
- *      .                                                                License DPR 50 Docket No. 50-289 REQUEST FOR EXTENSION OF TIME TO SUBMIT EMERGENCY CORE COOLING 3YSTEM EVALUATION Pursuant to Section 50.46 (a) (2) (iii) to 10 CFR 50, Metropolitan Edison Company (Met-Ed) requests for good cause as shown hereinafter a six-week extension of the six-month period specified in Section 50.h6 (a) (2) (ii) for submission of an emergency core cooling system (ECCS) evaluation. In the absence of approval of the extension sought by this request, Met-Ed would be required to submit the evaluation for the Three Mile Island Nuclear Generating Station Unit I by August 5,1974. The reason for this request is the difficulties experienced in developing and implementing the appropriate evaluation models.
- *      .                                                                License DPR 50 Docket No. 50-289
        .
  .  .
REQUEST FOR EXTENSION OF TIME TO SUBMIT EMERGENCY CORE COOLING 3YSTEM EVALUATION Pursuant to Section 50.46 (a) (2) (iii) to 10 CFR 50, Metropolitan Edison Company (Met-Ed) requests for good cause as shown hereinafter a six-week extension of the six-month period specified in Section 50.h6 (a) (2) (ii) for submission of an emergency core cooling system (ECCS) evaluation. In the absence of approval of the extension sought by this request, Met-Ed would be required to submit the evaluation for the Three Mile Island Nuclear Generating Station Unit I by August 5,1974. The reason for this request is the difficulties experienced in developing and implementing the appropriate evaluation models.
The Three Mile Island Nuclear Generating Station Unit I is powered by a Babcock &
The Three Mile Island Nuclear Generating Station Unit I is powered by a Babcock &
Wilcox nuclear steam supply system (NSSS) which contains fuel supplied by the' Babcock & Wilcox Company. Individual utilities like Met-Ed do not have the capability for ECCS model development and are dependent, therefore, for schedule purposes on the performance of the NSSS vendor and fuel supplier.
Wilcox nuclear steam supply system (NSSS) which contains fuel supplied by the' Babcock & Wilcox Company. Individual utilities like Met-Ed do not have the capability for ECCS model development and are dependent, therefore, for schedule purposes on the performance of the NSSS vendor and fuel supplier.
Line 119: Line 82:
Met-Ed as the licensee and operator of the Three Mile Island Nuclear Generating Station Unit I, through its sister subsidiary company, GFU Service Corporation (GPUSC), has requested that the Babcock & Wilcox Co=pany (B&W) performs the blowdown analysis for the Three Mile Island Unit I reactor coolant system and the complete LOCA analysis of the 177 B&W fuel assemblies in the Three 5 Ele Island Unit I reactor. Exhibit (1) attached to this request specifies that Unit 1 reactor will not be available prior to August 5,197h. Further, the complexity of the model and the required pace of B&W's development schedule precludes detailed technical review of the comp eted LOCA analysis model by G'D 1Isu E U '/ UvU
Met-Ed as the licensee and operator of the Three Mile Island Nuclear Generating Station Unit I, through its sister subsidiary company, GFU Service Corporation (GPUSC), has requested that the Babcock & Wilcox Co=pany (B&W) performs the blowdown analysis for the Three Mile Island Unit I reactor coolant system and the complete LOCA analysis of the 177 B&W fuel assemblies in the Three 5 Ele Island Unit I reactor. Exhibit (1) attached to this request specifies that Unit 1 reactor will not be available prior to August 5,197h. Further, the complexity of the model and the required pace of B&W's development schedule precludes detailed technical review of the comp eted LOCA analysis model by G'D 1Isu E U '/ UvU


  .
*
    .
                                                    .
.  .
GPUSC/ Met-Ed until after the six-month period. As specified in Exhibit (2),
GPUSC/ Met-Ed until after the six-month period. As specified in Exhibit (2),
GPUSC requires three weeks, from receipt of B&W's completed LOCA analysis ,
GPUSC requires three weeks, from receipt of B&W's completed LOCA analysis ,
Line 130: Line 88:
As stated previously, Met-Ed cannot, until completion of the review of the B&W analyses, provide the Director with a comprehensive evaluation for the Three Mlle Island Unit I facility. Accordingly, it is requested that Met-Ed be granted a six-veek extension from August 5,1974, to September 16, 1974, to provide a complete ECCS analysis in confomance with Appendix K to 10 CFR Part 50.
As stated previously, Met-Ed cannot, until completion of the review of the B&W analyses, provide the Director with a comprehensive evaluation for the Three Mlle Island Unit I facility. Accordingly, it is requested that Met-Ed be granted a six-veek extension from August 5,1974, to September 16, 1974, to provide a complete ECCS analysis in confomance with Appendix K to 10 CFR Part 50.
n
n
                                                          ,.
                                                 'C        s 1, L L f . '
                                                 'C        s 1, L L f . '
                                               ']R. C. Arnold tsvn '/    04i
                                               ']R. C. Arnold tsvn '/    04i


,, ',                            '      -
EXHIBIT (1)
EXHIBIT (1)
            .
Babcock & Wilcox                                                                %er cenereen c,-o P.O. Box 1260. Lynchburg, Va. 24505 Telephone: (804) 384-5111 June 10, 197h I here,by certify that it is the intention of the Babcock & Wilcox Company to file with the Atomic Energy Commission a Generic 177 Fuel Assembly Class Plant ECCS Analysis Report. It is intended that this report vill be filed with the Atomic Energy Commission on August 4, 1974.
      .
Babcock & Wilcox                                                                %er cenereen c,-o P.O. Box 1260. Lynchburg, Va. 24505 Telephone: (804) 384-5111 June 10, 197h
                                                                                                        .
I here,by certify that it is the intention of the Babcock & Wilcox Company to file with the Atomic Energy Commission a Generic 177 Fuel Assembly Class Plant ECCS Analysis Report. It is intended that this report vill be filed with the Atomic Energy Commission on August 4, 1974.
I further certify that, prior to filing with the Atomic Energy Co==ission, representatives of GPU Service Corporation vill not have an opportunity to perform an indepth technical and licensing review.
I further certify that, prior to filing with the Atomic Energy Co==ission, representatives of GPU Service Corporation vill not have an opportunity to perform an indepth technical and licensing review.
o
o
                                                                                           .A    x - ,
                                                                                           .A    x - ,
W. S. Delicate, Project Manager 1507 042 The Babcock & Wilcox Company / Established 1867}}
W. S. Delicate, Project Manager 1507 042 The Babcock & Wilcox Company / Established 1867}}

Latest revision as of 05:44, 2 February 2020

Forwards Request for Extension of Time to Submit ECCS evaluation.W/740610 B&W Certification & 740617 & 0619 Affidavits by General Public Util & Met Ed,Respectively
ML19210B157
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/19/1974
From: Arnold R
METROPOLITAN EDISON CO.
To: Muntzing L
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19210B158 List:
References
GQL-0095, GQL-95, NUDOCS 7911040089
Download: ML19210B157 (5)


Text

  • c AEC unQIBUTICN FOR PART 50 DOCKET bMIAL

, (TEMPORARY FORM) CONTROL NO: 5598

. FILE: /4 (d<*/

FROM: DATE OF DOC DATE REC'D LTR TWX RPT OTHER Metropolitan Edison Company Reading, Pa. 19603 6-19-74 6-20-74 X R. C. Arnold TO: ORIG CC OTHER SENT AEC PDR X L. M. Muntzing 1 signed SENT LOCAL PDR X CLASS UNCLASS I PROP int 0 PUT NO CYS REC'D DOCKET NO:

XXX 40 50-289 DESCRIPTIC'. ENCLOSURES:

Ltr trans the following: Request for Extension of Time to Submit Emergency Core Cooling System Evaluation LON0f REMOVE ACKNOWLEDGED PLANT NAME: Three Mile Island Unit 1 ( 1 Orig & 39 cys ree'd )

FOR ACTION /INF0FEATION 6-20-74 CC BUTLER (L) /CHWENCER(L) ZIDIANN(L) REGAN(E)

W/ Copies W/1 Copies W/ Copies W/ Copies CLARK (L) STOLZ(L) DICKER (E)

W/ Copies W/ Copies W/ Coplas W/ Copies PARR(L) VASSALLO(L) KNIGHION(E)

'.:/ c:;i:: "/ c:;i:: S/ c:;i:: S/ C:;i::

KNIEL(L) PURPLE (L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies n INTERNAL DISTRIBUTION

& TECH REVIEW dENDRIE DENTON LIC ASST A/T IND

/AEC PDR GRIMES BRAI'DdAN OGC, ROCM P-506A SCHROEDER GAMMILL DIGGS (L) SALIZMAN MUNTZING/ STAFF MACCARY KASTNER GEARIN (L) 3. HURT W6ASE KNIGHT BALLARD PLANS andOULBOURNE (L)

GIAMBUSSO PAWLICKI SPANGLER MCDONALD LEE (L)

MYD SHA0 MAIGRET (L) DUBE w/ input A00RE (L)(57R) t/STELLO ENVIRO REED (E) CHAPMAN DEYOUNG(L)(PWR) HOUSTON MULLER WF0 SERVICE (L)

SKOVHOLT (L) dOVAK DICKER SHEPPARD (L)

C. MILES COLLER(L) ROSS KNIGHTON EECKER SLATER (E)

P. COLLINS DENISE IPPOLITO TEDESCO YOUNGBLOOD REGAN SMITH (L) JTENWT

< BERNERO TEETS (L)

G OPR LONG PROJECT LDR AOR FILE WADE (E)

[ FILE & REGION (2) LAINAS WILLIAMS (E) D. THOMPSON (2)

MORRIS BENAROYA HARLESS WILSON (L) .p7Q ST EI'.E VOLIEER IIC/

ij J U ~

EXTT.R'iAL DISTRI3UTIC'? /[j/

V1_- LOCAL PDR Harrisburg, Pa. 'g s,A - TIC (ABER';ATHY) (1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /Li/NY i/I - NSIC(BUCHANAN) 1-ASLBP(E/W 31dg,Rm 529) 1- LIBR/RIAN 1 - ASLB 1-W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT. LA3 1 - P. R. DAVIS (AEROJET NUCLEAR) 1-CONSULTANT' S 1-AGMED(Ruth Gussman)

A6 - CYS ACRS Il0tXTJfMC SENT TO LIC. ASST. NEWARK / BLUME/AGBABI AN EM- B-12 7, CT.

6-20-74 GOULBOUIUTE 1-GEFALD ULRIXSON. . .CRFL 1-RD.. MULLER..F-309 GT c .. 1-B & M SWINE 3RCAD, an -0 T O 40Cc?- p g

. Hulal0y Docket fde #M _

. E METROPOLITAN EDISON COMPANY .

POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 June 19, 1974 GQL 0095 x' d\

Mr. L. Manning Muntzing go 'A Director of Regulation f. 3 7. g Directorate of Licensing 4' ,,, -li Office of Regulatien $ ' ' ' ,OA p.g

'6 C.,

U. S. Atomic Energy Cornission $ .j2 ,,' , -

Washington, D. C. 205h5 '\ '."- ', ' '>h4 N'l'5j/

Dear Mr. Muntzing:

Subject:

Three Mile Island Nuclear Generating Statica Unit I License DPR 50 Docket No. 50-289 ECCS, Application for Extension Enclosed are 39 copies and one original of an application for extension of time for submittal of wi ECCS evaluation for Three Mile Island Unit I pursuant to the provisions of 10 CFR 50.h6.

Sincerely, 9, , ,

6 ,; *J t ug,

)

R. C7'Ainold '

Vice President RCA:nh Enclosures '

4

+ y'fQ\

s. 80 4 l ::1.. &?g r. ~
s

% ~ ,j $.

O<

Q .? .

'y -

1R IJ l ln-)

JJ 55S8

- * . License DPR 50 Docket No. 50-289 REQUEST FOR EXTENSION OF TIME TO SUBMIT EMERGENCY CORE COOLING 3YSTEM EVALUATION Pursuant to Section 50.46 (a) (2) (iii) to 10 CFR 50, Metropolitan Edison Company (Met-Ed) requests for good cause as shown hereinafter a six-week extension of the six-month period specified in Section 50.h6 (a) (2) (ii) for submission of an emergency core cooling system (ECCS) evaluation. In the absence of approval of the extension sought by this request, Met-Ed would be required to submit the evaluation for the Three Mile Island Nuclear Generating Station Unit I by August 5,1974. The reason for this request is the difficulties experienced in developing and implementing the appropriate evaluation models.

The Three Mile Island Nuclear Generating Station Unit I is powered by a Babcock &

Wilcox nuclear steam supply system (NSSS) which contains fuel supplied by the' Babcock & Wilcox Company. Individual utilities like Met-Ed do not have the capability for ECCS model development and are dependent, therefore, for schedule purposes on the performance of the NSSS vendor and fuel supplier.

As recognized by the Co=nission in its opinion which acccmpanied issuance of the Acceptance Criteria, there are considerable differences between the ECCS evaluation models approved ander the Interim Acceptance Criteria and the required and accept-able features of evaluation models described in Appendix K to 10 CFR 50. In many cases, the differences result from the requirement to model physical phenc=ena in more detail. This requirement for increased detail results in numerical analysis problems which make model development technically difficult and time consuming.

Further, Appendix K does not define, approve or cake available any acceptance evaluation models. The extensive effort involved and the nature of Appendix K have caused the vendor's technical organization to seek further definitions of model suitability and conformity to Appendix K from the AEC staff.

These circumstances have resulted in a situation where, in spite of the best efforts of all concerned parties, complete concurrence has not been achieved on the suitability of the models to be used. Thus , of the six-month period allowed by the new rule for implementation of Appendix K, there remains less than two months for the analysis , review, and evaluation of ECCS performance in Three Mile Island Unit I, including definition of appropriate operatihg restricticns and/or modificatious.

Met-Ed as the licensee and operator of the Three Mile Island Nuclear Generating Station Unit I, through its sister subsidiary company, GFU Service Corporation (GPUSC), has requested that the Babcock & Wilcox Co=pany (B&W) performs the blowdown analysis for the Three Mile Island Unit I reactor coolant system and the complete LOCA analysis of the 177 B&W fuel assemblies in the Three 5 Ele Island Unit I reactor. Exhibit (1) attached to this request specifies that Unit 1 reactor will not be available prior to August 5,197h. Further, the complexity of the model and the required pace of B&W's development schedule precludes detailed technical review of the comp eted LOCA analysis model by G'D 1Isu E U '/ UvU

GPUSC/ Met-Ed until after the six-month period. As specified in Exhibit (2),

GPUSC requires three weeks, from receipt of B&W's completed LOCA analysis ,

for an appropriate technical review on behalf of Met-Ed. Finally, as specified in Exhibit (3), Met-Ed as the licensee, requires three weeks for the operations and safety committee reviews (pursuant to the Three Mile Island Unit I license and Appendix B of 10 CFE Part 50) and final approval. Thus , the projected date

!<. submittal of the analysis is September 16,197h.

As stated previously, Met-Ed cannot, until completion of the review of the B&W analyses, provide the Director with a comprehensive evaluation for the Three Mlle Island Unit I facility. Accordingly, it is requested that Met-Ed be granted a six-veek extension from August 5,1974, to September 16, 1974, to provide a complete ECCS analysis in confomance with Appendix K to 10 CFR Part 50.

n

'C s 1, L L f . '

']R. C. Arnold tsvn '/ 04i

EXHIBIT (1)

Babcock & Wilcox %er cenereen c,-o P.O. Box 1260. Lynchburg, Va. 24505 Telephone: (804) 384-5111 June 10, 197h I here,by certify that it is the intention of the Babcock & Wilcox Company to file with the Atomic Energy Commission a Generic 177 Fuel Assembly Class Plant ECCS Analysis Report. It is intended that this report vill be filed with the Atomic Energy Commission on August 4, 1974.

I further certify that, prior to filing with the Atomic Energy Co==ission, representatives of GPU Service Corporation vill not have an opportunity to perform an indepth technical and licensing review.

o

.A x - ,

W. S. Delicate, Project Manager 1507 042 The Babcock & Wilcox Company / Established 1867