Supports Request for Extension of Time to Submit ECCS Evaluation
ML19210B161
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/19/1974
From: Rosalyn Jones
METROPOLITAN EDISON CO.
To:
Shared Package
ML19210B158 List:
References
NUDOCS 7911040092
Download: ML19210B161 (8)


Text

. 1 Exhibit (3)

I

' AFFCAVIT l

I 1

STATE CF PE U2YLVANIA:

. 53.

! COUNTY CF BEErJ:

The undersigned. Ecbert F. Jones, being duly sworn according to law, deposes and says that:

1. I as the Manager-Generation Engineering for Metropolitan Edison Company (Met-Ed), 2800 Pottsville Pike, Pending, Pennsylvania 19605 Met-Ed is the licensee and operator of the 3ree Mile Island Nuclesr Oenerating Station Unit 1, and is a wholly owned subsidiary of General Public Utilities (GPU).
2. I have been empicyed by Met-Ed since May,1973 Mr duties include responsibility for plant performance analysis, nuclear and computer engineering work, evaluation of the hypothesized Loss of Coolant Accident analysis for Three Mile Island Unit 1, and the evaluation of the mode of com-pliance with the criteria of 10 CFR 50.

3 This statement is submitted in response to the requirements of Section 50.:.6 of 10 CFR 50, and reflects :::y opinien with regard to the time required to pro? rly review the forthecming ECCS evaluation and any resultant changes to the Three Mile Islana Naclear Genersting Station Unit i Technical Specificaticns.

!4 Review of any safety evaluation and/cr proposed changes of the Three Mile Island Unit 1 Technical Specifications is required by the conditions of the "'hree Mile Island Unit i license. Such review consists af 00nsideraticn of the operstional and plant related M*ects of the change by the Plant Opera-tiens Review Committee (P0FC), the overall evaluaticn of safety hazards by the General Office Seview Scrad (GCEB), and the evaluation of possible unreviewed e safety questiens or Tec*inical Specifications changes by the Met-Ed Carperste Techniaal Support Staff, as well as sn overall determinatien of : aitability i

l ty the management of Metropolitan Edison Ocmpany.

b i 5 It is ::y best Judgent that such review and final prepsrstien of l 4 I the 3ree Mile !sland Unit 1 E000 evaluaticn required by 10 CFE 50.ao will l

l require three weeks time.

I i o re l lB

) J U43 55 0 Gl0' >

i e I

?

E

, 1

. i 6

2-i j 6. It is estimated that one week each will te required for PCFC t consideratien and approval; GORS consideration and approval; and Met-Ed j Corpcrate Technical Support Staff eensideraticn and approval and Management

! l consideration, approval, and final submittal preparation. It is felt that this three week period and the individual estimated times for each required i

I step are the minimum time periods pcssible in which to acccmplish the appro-priate actions.

7. "te foregoing is true and correct to the best of my knowledge and belief.