Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20129B2831985-07-0909 July 1985 Part 21 Rept Re Hk Control Device.Initially Reported by TVA in 850703 Morning Rept.Parts to Be Supplied for Completion of Insp/Adjusting Procedure Included in 830322 Part 21 Rept ML20080N0191984-02-10010 February 1984 Final Deficiency Rept S-18 Re Structural Steel Beam Nonconformances.Initially Reported on 840113.Due to Plan to Convert Facility to coal-fired Power Plant,No Further Action or Correspondence Planned on Item ML20086L7101984-02-0303 February 1984 Final Deficiency Rept,Item E-58 Re Flammability Control Unit Motor Control Terminal Cabinets.Initially Reported on 840104.Deficiency Determined Not Reportable Per 10CFR50.55(e) ML20079N2781984-01-17017 January 1984 Interim Deficiency Rept,Item M-104 Re Qualifications of Energy Absorbing Matl Used in Design & Const of High Energy Pipe Whip Restraints.Initially Reported on 831219.Test Procedure Development in Process.Next Rept Due by 840401 ML20079H3021984-01-16016 January 1984 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Dimmer Rheostats for Lamp Circuits in Main Control Room Annunciator Sys Will Be Bypassed to Minimize Line Resistance & Maximize Short Circuit Current ML20079E8101984-01-10010 January 1984 Final Deficiency Rept,Item E-53 Re Switchgear Wiring Diagram Discrepancies.Initially Reported on 830922.All Discrepancies Resolved.Deficiencies Not Reportable Under 10CFR050.55(e) ML20079F8391984-01-10010 January 1984 Interim Deficiency Rept,Item M-67 Re Lack of Procedural Qualifications for Pipe Bends.Initially Reported on 821109. Post-qualification Program Completed for 35 Bends.Corrective Action Program Will Be Conducted ML20086G7551984-01-0303 January 1984 Interim Deficiency Rept,Item Q-14 Re Control of Design Specs.Initially Reported on 831013.Measures to Ensure That Approved Specs Issued as Controlled Documents in Progress. Final Rept Will Be Submitted Upon Completion of Activities ML20086N0421984-01-0202 January 1984 Final Part 21 Rept Re Potential Problem Concerning Radiography of Branch Connection Welds Covered by Reinforcing Pads.Welds at Byron,Braidwood & North Anna Acceptable.Weld 7 at Clinton Reradiographed ML20083J7521983-12-30030 December 1983 Interim Deficiency Rept,Item E-30 Re Lack of Installation Insp of non-Class IE Cables in Panels.Initially Reported on 821027.Analysis Identified 575 Deviations Requiring Rework. Final Rept Will Be Submitted Upon Completion ML20083F8281983-12-29029 December 1983 Interim Deficiency Rept,Item M-46 Re Turning Vane Failures in Essential HVAC Sys.Initially Reported on 820510.Design Mods Completed.Adequacy of Vanes Less than 30 Inches Wide in Elbows Will Be Verified ML20086G7071983-12-29029 December 1983 Interim Deficiency Rept,Item M-32 Re Incomplete Hydraulic Analysis of Control Rod Drive Piping.Verification of Installed Hardware Will Be Completed Under Plan to Verify Quality of Const Submitted 831216 ML20083F8481983-12-28028 December 1983 Interim Deficiency Rept,Item Q-12 Re Failure to Follow Procedure for Insp of Qa/Qc Rework/Repair Activities. Initially Reported on 830909.Hardware Will Be Inspected to Validate Design Drawings.Procedures Under Development ML20083J6451983-12-27027 December 1983 Interim Deficiency Rept S-10 Re Masonry Wall Const.Initially Reported on 830513.Reinsp & Corrective Action Program Will Be Selected Per Course of Action Approved by NRC on 831216 ML20083E1101983-12-14014 December 1983 Interim Deficiency Rept,Item E-47 Re Target Rock Solenoid Operated Valves Used in Essential Sys W/Excessive Space at End of Coil.Initially Reported on 830803.Replacement Kits on Order ML20082P5551983-11-30030 November 1983 Interim Deficiency Rept,Item M-101 Re Itt Hydromotor Actuator Oil Seal Leakage.Initially Reported on 831102. Corrective Actions Will Proceed Under 831005 Program.Item Not Reportable Under 10CFR50.55(e) ML20082P6051983-11-30030 November 1983 Final Deficiency Rept,Item Q-10 Re Potential Defects in Catalytic,Inc QA & Const Programs.Initially Reported on 830812.Incidents Cited Not Representative of QA Program. Defects Not Reportable Per 10CFR50.55(e) ML20082P4301983-11-29029 November 1983 Interim Deficiency Rept,Item M-54 Re Inadequate Qualification of Hydraulic Control Units.Initially Reported on 820726.Analysis of Proposed Mods to Units in Progress. Limited Scope Operability Testing to Be Performed ML20082P5031983-11-29029 November 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 831104.Paint Removal & Reinsp of Welds in Progress.Corrective Action Will Be Performed ML20082P6671983-11-29029 November 1983 Interim Deficiency Rept,Item M-96 Re Indeterminate Qualification of Cooperheat Per ASME Section Iii.Hj Kaiser Co QA Dept in Process of Performing Evaluation of Purchase Orders Re Acceptability.Final Rept by 840601 ML20082P8611983-11-29029 November 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.Procedures for Corrective Actions Developed Per FSAR Chapter 17.1.Next Rept Will Be Submitted by 840130 ML20082P8631983-11-29029 November 1983 Interim Deficiency Rept,Item E-39 Re Brown Boveri 125-volt Dc Control Device Failure on 6.9 Kv & 4.16 Kv Switchgear. Initially Reported on 830202.Insp & Adjustment of Applicable Circuit Breakers Continuing ML20082H9041983-11-23023 November 1983 Interim Deficiency Rept,Item M-102 Re Nonconformance of Feedwater Line Seismic Analysis W/Reg Guide 1.29.Initially Reported on 831028.Evaluation Continuing.Followup Rept Will Be Submitted by 840224 ML20082E3371983-11-17017 November 1983 Interim Deficiency Rept,Item M-100 Re Warped Standby Liquid Control Sys Tank Mounting Flange.Initially Reported on 831021.Gap Will Be Filled W/Epoxy Grout to Restore Flange to Original Design ML20082D0131983-11-11011 November 1983 Interim Deficiency Rept Re Lack of Insp Personnel Qualifications.Qualifications of 252 Inspectors adequate,58 Inspectors Still Under Review & 47 Inspectors Not Certifiable.Followup Rept & Corrective Action by 840330 ML20082B8171983-11-10010 November 1983 Interim Deficiency Rept,Item Q-14 Re Inadequacy of Control & Distribution of Design Specs.Initially Reported on 831013. Applicable Procedures for Review,Approval & Distribution Will Be Revised.Next Rept Will Be Provided by 840105 ML20081M7591983-11-10010 November 1983 Interim Deficiency Rept,Item M-24 Re Seismic Qualification of 13 Essential Damper Actuator Mounting Brackets.Initially Reported on 801014.American Warming & Ventilation Analysis Delayed Until 831111.Next Rept Following Corrective Mods ML20081M3341983-11-10010 November 1983 Interim Deficiency Rept,Item M-72 Re Lack of QA Program for Fire Protection Sys Installation.Initially Reported on 821214.Proposed Fire Protection QA Program Developed. Followup Rept Will Be Submitted by 840220 ML20082C0681983-11-0909 November 1983 Interim Deficiency Rept,Item S-11 Re Structural Steel Bolting.Initially Reported on 830513.Comprehensive Reinsp Program for Accessible Connections Developed.Procedures Governing Rework Program Under Development ML20081M8471983-11-0909 November 1983 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Initially Reported on 830823.Two Contact Blades in Drake 4390 Socket Produce Metal Shavings Causing Short Circuit.Circuits Will Be Redesigned ML20081M6931983-11-0808 November 1983 Interim Deficiency Rept,Items E-20 & E-29 Re Adequacy of Cable Tray & Conduit Support Welding & Cable Tray Support Threaded Nelson Studs.Initially Reported on 820503 & 0928. Concurrence Requested for Procedural Development ML20081M1431983-11-0808 November 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Welds.Initially Reported on 830922.Field Deviation Disposition Request 1120 Submitted to Document & Resolve Deficiency.Final Rept Will Be Submitted by 840316 ML20078R5081983-11-0808 November 1983 Interim Deficiency Rept,Item S-17 Re Main Steam Line Break Analysis.Initially Reported on 831020.Auxiliary Bldg Pressure Differential Resulting from High Energy Line Breaks Not Unacceptable for Masonry Walls.Final Rept by 840116 ML20081H6941983-10-27027 October 1983 Final Deficiency Rept,Item M-93 Re Improperly Supervised Fire Detection Circuits.Initially Reported on 830823. Inability to Verify Fire Detection Sys Unacceptable Condition ML20081F1121983-10-25025 October 1983 Interim Deficiency Rept,Item M-91 Re Overpressurization of HPCS Relief Valve 1E22F035.Initially Reported on 830818. Audit Finding Rept 83-19-05 Issued to Correct Defect. Followup Rept by 840518 ML20081F0871983-10-25025 October 1983 Interim Deficiency Rept,Item M-61 Re Fire Protection Piping Suspended from Essential Cable Tray Supports.Mods Stopped by 821112 Show Cause Order Immediately Suspending Const.Final Rept Will Be Submitted Upon Mod Completion ML20078M9971983-10-18018 October 1983 Interim Deficiency Rept,Item E-46 Re Lack of Type SIS Switchboard Wire Certification.Initially Reported on 830713. Sargent & Lundy Issued Design Document Change SLE-577 to Require Type SIS Wire for Future Use.Next Rept by 840131 ML20078N3621983-10-17017 October 1983 Interim Deficiency Rept,Item E-54 Re Misapplication of Control Circuit Fuses.Initially Reported on 830923.Incorrect Design Documentation Will Be Revised & Walkdown Program to Verify Fuses to Be Developed.Final Rept by 840531 ML20078L1391983-10-14014 October 1983 Interim Deficiency Rept,Item M-56 Re Inadequate Installation of Gamma Plugs in Accessible & Embedded Piping.Initially Reported on 820804.HJ Kaiser Co Completing Investigation. Final Resolution Expected by 840130 ML20080T0691983-10-12012 October 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Bracket Welds Not Installed to Design Requirements.Initially Reported on 830922.Of 30 brackets,24 Not Completely Welded.Next Rept Expected by 831121 ML20078J2791983-10-10010 October 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 830104.Const Insp Plans Developed for Surveillance of Paint Removal & Insp of Electrical Panel Mounting Welds.Next Rept by 831201 ML20078J4141983-10-10010 October 1983 Interim Deficiency Rept,Item E-20 Re Inadequate Cable Tray Hanger Insp.Initially Reported on 820503.Formal Submittal of Proposed Reinsp Program,Including Request for Relaxation of NRC 821112 Show Cause Order,Will Be Made by 831108 ML20080S2071983-10-10010 October 1983 Interim Deficiency Rept,Item E-53 Re Discrepancies in 4.16-kV Switchgear Wiring Diagram.Initially Reported on 830922.Evaluation Continuing.Followup Rept Will Be Submitted by 840120 ML20080R3171983-10-10010 October 1983 Interim Deficiency Rept,Item M-45 Re Intermediate Welder Qualifications.Initially Reported on 830430.Computerized Welding Info Sys Scheduled for Completion by 840215. Followup Rept Will Be Submitted by 840321 ML20078J8271983-10-0707 October 1983 Interim Deficiency Rept,Item Q-12 Re Procedures for Insp of Rework/Repair Activities.Initially Reported on 830909.QA Personnel Developing Program to Require Verification of Repair/Rework for Closed 7000 Series Nonconformance Repts ML20080R0891983-10-0707 October 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.QA Dept Reorganized & Corrective Action Requests/Trending Group Established.Followup Rept by 831130 ML20086N2381983-10-0404 October 1983 Supplemental Part 21 Rept Re Radiographic Record Evaluation, Supplying Addl Data to 830624 Submittal.Records Show That 90 Degree Branch Connections Furnished to North Anna 1 & 2 Jobsites.No Nozzles Supplied to Zimmer.Related Info Encl ML20080Q3891983-09-30030 September 1983 Interim Deficiency Rept,Item E-30 Re Electrical Cable Termination.Initially Reported on 821027.Approval of Procedure Rev Scheduled for 831015.Failure to Incorporate Criteria in Procedures to Be Evaluated.Next Rept by 831231 1987-06-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20155J5351988-10-19019 October 1988 Safety Evaluation Supporting Licensee 861110 Request for Dismantlement & Decontamination of AGN-201 Reactor Facility & Termination of License R-127 ML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20129B2831985-07-0909 July 1985 Part 21 Rept Re Hk Control Device.Initially Reported by TVA in 850703 Morning Rept.Parts to Be Supplied for Completion of Insp/Adjusting Procedure Included in 830322 Part 21 Rept ML20127J1981985-06-17017 June 1985 Safety Evaluation Supporting Amend 5 to License R-127 ML20107E0591984-12-31031 December 1984 Ctr for Nuclear Studies Memphis State Univ,1984 Annual Rept Nuclear Reactor Operations ML20091J1461984-05-31031 May 1984 Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co. W/Two Oversize Figures.Aperture Cards Are Available in PDR ML20080N0191984-02-10010 February 1984 Final Deficiency Rept S-18 Re Structural Steel Beam Nonconformances.Initially Reported on 840113.Due to Plan to Convert Facility to coal-fired Power Plant,No Further Action or Correspondence Planned on Item ML20086L7101984-02-0303 February 1984 Final Deficiency Rept,Item E-58 Re Flammability Control Unit Motor Control Terminal Cabinets.Initially Reported on 840104.Deficiency Determined Not Reportable Per 10CFR50.55(e) ML20079N2781984-01-17017 January 1984 Interim Deficiency Rept,Item M-104 Re Qualifications of Energy Absorbing Matl Used in Design & Const of High Energy Pipe Whip Restraints.Initially Reported on 831219.Test Procedure Development in Process.Next Rept Due by 840401 ML20079H3021984-01-16016 January 1984 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Dimmer Rheostats for Lamp Circuits in Main Control Room Annunciator Sys Will Be Bypassed to Minimize Line Resistance & Maximize Short Circuit Current ML20079E8101984-01-10010 January 1984 Final Deficiency Rept,Item E-53 Re Switchgear Wiring Diagram Discrepancies.Initially Reported on 830922.All Discrepancies Resolved.Deficiencies Not Reportable Under 10CFR050.55(e) ML20079F8391984-01-10010 January 1984 Interim Deficiency Rept,Item M-67 Re Lack of Procedural Qualifications for Pipe Bends.Initially Reported on 821109. Post-qualification Program Completed for 35 Bends.Corrective Action Program Will Be Conducted ML20083J1651984-01-0606 January 1984 Rev 2 to Vols 1 & 2 of Environ Qualification Rept for Class IE Equipment ML20079E2621984-01-0505 January 1984 Quality Confirmation Program, Monthly Rept for Dec 1983 ML20086G7551984-01-0303 January 1984 Interim Deficiency Rept,Item Q-14 Re Control of Design Specs.Initially Reported on 831013.Measures to Ensure That Approved Specs Issued as Controlled Documents in Progress. Final Rept Will Be Submitted Upon Completion of Activities ML20086N0421984-01-0202 January 1984 Final Part 21 Rept Re Potential Problem Concerning Radiography of Branch Connection Welds Covered by Reinforcing Pads.Welds at Byron,Braidwood & North Anna Acceptable.Weld 7 at Clinton Reradiographed ML20087J7441983-12-31031 December 1983 Annual Rept of Nuclear Reactor Operations,1983 ML20091A2241983-12-31031 December 1983 Ohio Edison Annual Rept,1983 ML20091A2421983-12-31031 December 1983 Duquesne Light Co Annual Rept,1983 ML20091A2551983-12-31031 December 1983 Cleveland Electric Illuminating Co 1983 Annual Rept ML20083E4111983-12-31031 December 1983 Revised Audit of Program to Verify Quality of Const & Continuation of Const Plan ML20083J7521983-12-30030 December 1983 Interim Deficiency Rept,Item E-30 Re Lack of Installation Insp of non-Class IE Cables in Panels.Initially Reported on 821027.Analysis Identified 575 Deviations Requiring Rework. Final Rept Will Be Submitted Upon Completion ML20083F8281983-12-29029 December 1983 Interim Deficiency Rept,Item M-46 Re Turning Vane Failures in Essential HVAC Sys.Initially Reported on 820510.Design Mods Completed.Adequacy of Vanes Less than 30 Inches Wide in Elbows Will Be Verified ML20086G7071983-12-29029 December 1983 Interim Deficiency Rept,Item M-32 Re Incomplete Hydraulic Analysis of Control Rod Drive Piping.Verification of Installed Hardware Will Be Completed Under Plan to Verify Quality of Const Submitted 831216 ML20083F8481983-12-28028 December 1983 Interim Deficiency Rept,Item Q-12 Re Failure to Follow Procedure for Insp of Qa/Qc Rework/Repair Activities. Initially Reported on 830909.Hardware Will Be Inspected to Validate Design Drawings.Procedures Under Development ML20083J6451983-12-27027 December 1983 Interim Deficiency Rept S-10 Re Masonry Wall Const.Initially Reported on 830513.Reinsp & Corrective Action Program Will Be Selected Per Course of Action Approved by NRC on 831216 ML20083E1101983-12-14014 December 1983 Interim Deficiency Rept,Item E-47 Re Target Rock Solenoid Operated Valves Used in Essential Sys W/Excessive Space at End of Coil.Initially Reported on 830803.Replacement Kits on Order ML20083J1771983-12-0909 December 1983 Vol 1 of Environ Qualification Rept for Mechanical Equipment ML20083F9121983-12-0808 December 1983 Quality Confirmation Program, Monthly Status Rept for Nov 1983 ML20082P5551983-11-30030 November 1983 Interim Deficiency Rept,Item M-101 Re Itt Hydromotor Actuator Oil Seal Leakage.Initially Reported on 831102. Corrective Actions Will Proceed Under 831005 Program.Item Not Reportable Under 10CFR50.55(e) ML20082P6051983-11-30030 November 1983 Final Deficiency Rept,Item Q-10 Re Potential Defects in Catalytic,Inc QA & Const Programs.Initially Reported on 830812.Incidents Cited Not Representative of QA Program. Defects Not Reportable Per 10CFR50.55(e) ML20082P4301983-11-29029 November 1983 Interim Deficiency Rept,Item M-54 Re Inadequate Qualification of Hydraulic Control Units.Initially Reported on 820726.Analysis of Proposed Mods to Units in Progress. Limited Scope Operability Testing to Be Performed ML20082P5031983-11-29029 November 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 831104.Paint Removal & Reinsp of Welds in Progress.Corrective Action Will Be Performed ML20082P6671983-11-29029 November 1983 Interim Deficiency Rept,Item M-96 Re Indeterminate Qualification of Cooperheat Per ASME Section Iii.Hj Kaiser Co QA Dept in Process of Performing Evaluation of Purchase Orders Re Acceptability.Final Rept by 840601 ML20082P8611983-11-29029 November 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.Procedures for Corrective Actions Developed Per FSAR Chapter 17.1.Next Rept Will Be Submitted by 840130 ML20082P8631983-11-29029 November 1983 Interim Deficiency Rept,Item E-39 Re Brown Boveri 125-volt Dc Control Device Failure on 6.9 Kv & 4.16 Kv Switchgear. Initially Reported on 830202.Insp & Adjustment of Applicable Circuit Breakers Continuing ML20082H9041983-11-23023 November 1983 Interim Deficiency Rept,Item M-102 Re Nonconformance of Feedwater Line Seismic Analysis W/Reg Guide 1.29.Initially Reported on 831028.Evaluation Continuing.Followup Rept Will Be Submitted by 840224 ML20082E3371983-11-17017 November 1983 Interim Deficiency Rept,Item M-100 Re Warped Standby Liquid Control Sys Tank Mounting Flange.Initially Reported on 831021.Gap Will Be Filled W/Epoxy Grout to Restore Flange to Original Design ML20082D0131983-11-11011 November 1983 Interim Deficiency Rept Re Lack of Insp Personnel Qualifications.Qualifications of 252 Inspectors adequate,58 Inspectors Still Under Review & 47 Inspectors Not Certifiable.Followup Rept & Corrective Action by 840330 ML20081M3341983-11-10010 November 1983 Interim Deficiency Rept,Item M-72 Re Lack of QA Program for Fire Protection Sys Installation.Initially Reported on 821214.Proposed Fire Protection QA Program Developed. Followup Rept Will Be Submitted by 840220 ML20081M7591983-11-10010 November 1983 Interim Deficiency Rept,Item M-24 Re Seismic Qualification of 13 Essential Damper Actuator Mounting Brackets.Initially Reported on 801014.American Warming & Ventilation Analysis Delayed Until 831111.Next Rept Following Corrective Mods ML20082B8171983-11-10010 November 1983 Interim Deficiency Rept,Item Q-14 Re Inadequacy of Control & Distribution of Design Specs.Initially Reported on 831013. Applicable Procedures for Review,Approval & Distribution Will Be Revised.Next Rept Will Be Provided by 840105 ML20082C0681983-11-0909 November 1983 Interim Deficiency Rept,Item S-11 Re Structural Steel Bolting.Initially Reported on 830513.Comprehensive Reinsp Program for Accessible Connections Developed.Procedures Governing Rework Program Under Development ML20081M8471983-11-0909 November 1983 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Initially Reported on 830823.Two Contact Blades in Drake 4390 Socket Produce Metal Shavings Causing Short Circuit.Circuits Will Be Redesigned ML20081M1431983-11-0808 November 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Welds.Initially Reported on 830922.Field Deviation Disposition Request 1120 Submitted to Document & Resolve Deficiency.Final Rept Will Be Submitted by 840316 ML20078R5081983-11-0808 November 1983 Interim Deficiency Rept,Item S-17 Re Main Steam Line Break Analysis.Initially Reported on 831020.Auxiliary Bldg Pressure Differential Resulting from High Energy Line Breaks Not Unacceptable for Masonry Walls.Final Rept by 840116 ML20081M6931983-11-0808 November 1983 Interim Deficiency Rept,Items E-20 & E-29 Re Adequacy of Cable Tray & Conduit Support Welding & Cable Tray Support Threaded Nelson Studs.Initially Reported on 820503 & 0928. Concurrence Requested for Procedural Development ML20082K5321983-10-31031 October 1983 Quality Confirmation Program, Monthly Rept for Oct 1983 ML20083A1401983-10-28028 October 1983 Rev 25 to Natl Board Tasks Rept 1988-10-19
[Table view] |