I r-- -
b1 dw em THE CINCINNATI GAS & ELECTRIC COMPANY crl"
=
i q
cincinuari.omo eroi March 31, 1981
.5."?%?.*lla" E Q 9(,
'N
'/
lJ'z ~Q3\\
f
. c.o a
?
U. S. Nuclear Regulatory Comission f g Q'I Region III
~
, c f.v R
799 Roosevelt Road 3,
',*,.v
^
N
]&
Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler, Of rector RE: WM. H. ZIMMER NUCLEAR POWER STATION UNIT I POTENTIAL 50.55(e) - ONE-INCH OIAMETER HILTI KWIK-BOLT ANCHORS (M-26), CONSTRUCTION PERMIT CPPR 88, DOCKET NO. 50-538, W. O.
- 57300-957, JOB E-5590 Gentlemen:
This letter constitutes an interim report on the subject anchors.
Preparation of a final report.was anticipated by todty's date, however, the evaluation to detennine the significance of this oroblem on the Zimer site, based on our architect-engineer's review of those supports utilizing 1"O expansion anchors with embedded lengths of 80, is not finalized.
We anticipate the evaluation will be completed by mid April,1981, and our final report submitted to your office by May 1,1981.
- Very truly yours, u
THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN SENIOR.VICE PRESIDENT OCK:ec cc: NRC Resident Inspector 30/f.
Attn:
F. T. Daniels NRC Office of Inspection & Enforcement 8
Washington, D. C.
ll 5
"' *4 a v o 2ss
-