| title = 01/13/2011-Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance
| title = Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance
| author name = Farnholtz T
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1

Latest revision as of 10:10, 6 December 2019

Summary of Meeting with Luminant Generation Company LLC Regarding a Preliminary Finding with Moderate Safety Significance
ML110190800
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/18/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Flores R
Luminant Generation Co
References
Download: ML110190800 (23)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 January 18, 2011 Rafael Flores, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

SUMMARY

OF MEETING WITH LUMINANT GENERATION COMPANY LLC REGARDING A PRELIMINARY FINDING WITH MODERATE SAFETY SIGNIFICANCE

Dear Mr. Flores:

This refers to the public regulatory conference meeting conducted in Arlington, Texas on January 13, 2011, between the U.S. Nuclear Regulatory Commission and your staff. The participants discussed the circumstances associated with a preliminary finding with moderate safety significance regarding potential failure to incorporate into station procedures information necessary to ensure continued operability of a safety-related water storage tank.

This meeting was classified as a Category 1 public meeting, as communicated in the meeting notice (ADAMS ML103570288). This provided an opportunity for members of the public to discuss regulatory issues with the Nuclear Regulatory Commission (NRC) after the business portion of the meeting, but before the meeting adjourned. No comments were brought forward by the public.

The attendance list for the meeting is enclosed with this summary (Enclosure 1). A copy of the Luminant Generation Company LLC presentation slides is also enclosed (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosures, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Luminant Generation Company LLC Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

Enclosures:

1. Attendance List
2. Luminant Generation Company LLC Presentation Slides cc w/enclosures:

Rafael Flores, Senior Vice President Mr. Richard A. Ratliff, Chief and Chief Nuclear Officer Bureau of Radiation Control Luminant Generation Company LLC Texas Department of Health Comanche Peak Steam Electric Station P.O. Box 149347, Mail Code 2835 P.O. Box 1002 Austin, TX 78714-9347 Glen Rose, TX 76043 Ms. Susan M. Jablonski Honorable Walter Maynard Office of Permitting, Remediation, & Registration Texas Commission on Environmental Quality County Judge MC-122 P.O. Box 851 P.O. Box 13087 Glen Rose, TX 76043 Austin, TX 78701-3087 Anthony Jones, Chief Boiler Inspector Mr. Fred W. Madden, Director Texas Department of Licensing and Regulation Oversight and Regulatory Affairs Boiler Division Luminant Generation Company LLC E.O. Thompson State Office Building P.O. Box 1002 P.O. Box 12157 Glen Rose, TX 76043 Austin, TX 78711

Luminant Generation Company LLC Timothy P. Matthews, Esq. Mr. Brian Almon Morgan Lewis Public Utility Commission 1111 Pennsylvania Avenue, NW William B. Travis Building Washington, DC 20004 P.O. Box 13326 Austin, TX 78711-3326 Environmental and Natural County Judge Resources Policy Director P.O. Box 851 Office of the Governor Glen Rose, TX 76043 P.O. Box 12428 Austin, TX 78711-3189 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Luminant Generation Company LLC Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

DRP Deputy Director (Troy.Pruett@nrc.gov )

DRS Director (Anton.Vegel@nrc.gov )

DRS Deputy Director (Vacant)

Senior Resident Inspector (John.Kramer@nrc.gov )

Resident Inspector (Brian.Tindell@nrc.gov )

Branch Chief, DRP/A (Wayne.Walker.nrc.gov )

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov )

Project Engineer, DRP/A (Nicholas.Hernandez@nrc.gov )

Project Engineer, DRP/A (Laura.Micewski@nrc.gov )

CP Administrative Assistant (Sue.Sanner@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Balwant.Singal@nrc.gov )

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource OEDO RIV Coordinator (James.Trapp@nrc.gov )

DRS/TSB STA (Dale.Powers@nrc.gov )

R:\_REACTORS\CP MS Reg Conf 1-13-11.docx ADAMS ML SUNSI Rev Compl. ; Yes No ADAMS  ; Yes No Reviewer Initials WCS Publicly Avail  ; Yes No Sensitive Yes ; No Sens. Type Initials WCS SRI:DRS/EB1 C:DRS/EB1 WSifre TFarnholtz 1/18/11 1/18/11

/RA/ /RA/

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax Enclosure 1 Enclosure 1 Enclosure 1 Attendees by telephone:

Sam Lee - Deputy Director NRR Division of Risk Assessment Veronica Rodriguez - BC (acting) PRA Operational Support Branch Donald Chung - Reliability/Risk Analyst - PRA Operational Support Branch Jerry Purciarello - Senior Engineer - NRR Division of Safety Systems - BOP Branch Jeff Circle - Senior Reliability/Risk Analyst - PRA Operational Support Branch Enclosure 1 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2